Burner YD-500 for Vietnam


We finish this project in year 2010 to 2011 and also distribution to Hochiminh port, Vietnam with 1×× 40′ feet open leading full container.

Items/Model YD-500
Burning Rate (kgs/Hour) 500 kgs/Hr.
Feed Capacity (kgs) 800 kgs
Equipment Weight 13000 kgs
Primary Chamber (Liters) 4000
Secondary Chamber (Liters) 1500
External Dimensions (cm) 320x220x460
Internal Dimensions (cm) 257x147x108
Oil Tank(Liters) 500
Door Opening (cm) 108 x 128
Chimney (M) 14
Chimney Type Stainless Steel
Secondary Chamber  YES
Mix-Combustion Chamber YES
Smoke Filter Chamber YES
Combustion Fuel Oil/Gas
Residency Time 2.0 Sec.
Temperature Monitoring YES
1st. Chmaber Temperature 800–1000
2nd. Chmaber Temperature 1000-1200

Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.


TECHNICAL INCINERATORS SPECIFICATIONS FOR 2 hospitals in Kenya

TECHNICAL INCINERATORS SPECIFICATIONS FOR 2 hospitals

 

INTRODUCTION

  • All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal notice No. 121 of 29th September 2006
  • The capacity of the incinerator required should be to the specifications with a capacity to burn 100kgs/Hr
  • The incinerator shall be run on a 3-phase power supply (mains)
  • For the technical evaluation, not only the treatment plant but the entire system will be considered.  It will be the responsibility of the Bidder to supply a full system, including all eventually additionally necessary secondary systems and additional equipment.
  • The system offered shall be designed to operate normally under the conditions of the purchaser’s country. The conditions include Power Supply, Climate, Temperature, Humidity, etc.
  • The Bidder must provide a warranty for one year.
  • All text, parameter etc. on all control operating interfaces as well as on information displays and on print-outs shall be in English language.
  • The Bidder is responsible for all permits and approvals for importation. The Bidder shall provide all the necessary documentation in order to facilitate the legal requirements for the installation and putting into use of the equipment.
  • Period of Execution is 90 days from contract signature for delivery to site and completion of all verification operations required for the issuance of provisional acceptance.
  • Representatives of the Contracting Authority and the Beneficiary, together with the Bidder’s representative, shall carry out the controls, testing and initial approval for provisional and final acceptance as.  The provisional and final acceptance shall take place at the final destination.
  • After-Sales Service: The Bidder is required to ensure that a maintenance, service and repair centre, which is authorised by the Manufacturer, and which is able to rapidly supply genuine spare parts and consumables recommended by the Manufacturer is available throughout the one year warranty period. In fulfillment of this requirement with their offer Bidders must submit a statement signed by a representative of the manufacturer:
    • Providing the name and address of its authorised maintenance, service and repair centre,
    • Confirming that this authorised maintenance, service and repair centre is able to rapidly supply genuine spare parts and the consumables recommended by the Manufacturer; and

 

  • The Bidder will be responsible to deliver and install all to be supplied equipment at to be set up waste handling areas in the Republic of Kenya. The Bidder shall deliver a time schedule over the complete construction and assembling period. The delivery and installation time must be agreed between bidders, target Hospital and the Contracting Authority. The treatment plant must arrive pre-assembled. The Bidder shall ensure that all parts of the plant transported by sea shall not be shipped as “deck cargo”.

 

  • It is expected that the Bidder cooperates closely with the contractor for the new waste handling building/area and will make available all needed technical information, drawing, etc. to the contractor.

 

  • The Bidder shall supply and install the incinerator with the following attached specifications

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

           
TECHNICAL INCINERATORS SPECIFICATIONS FOR EAPHLNP
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerators to Nema standards        
  The following are the incinerator specifications :-        
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste        
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
  Carried Forward To Collection Page.        
 

 

 

NOTE: WE REQUIRE TWO INCINERATORS. ONE        
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

The tank should be connected to the incinerator at a higher level to enable free-flow of diesel from the tank to the incinerator. The connecting pipe must be a black pipe of approved gauge and diameter. Include other accompanying accessories and fittings

Item 1    
C Installation & commissioning works        
D Positioning of Incinerator: –

Provide lifting gears as forklift, gantry, rollers, and lifting jacks and position incinerator.

Item 1    
E Connect burners to fuel supply. No. 2    
F Chimney Installation:        
 G Composition of the chimney: –

Provide a chimney with scrubber (for filtration)

Provide lifting gear to hoist, erect and mount chimney, and provide supports slings as necessary. Allow for cutting of tree branches to facilitate the exercise.

The chimney shall be painted with approved heat resistant paint after installation.

Item. 1    
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1    
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EVALUATION CRITERIA

Evaluation shall be carried out in four stages namely preliminary examination of documents for conformance with mandatory requirements, technical evaluation, site visit and commercial evaluation.

Stage One: Preliminary Examination

– Preliminary Evaluation under special condition of the tender. These are mandatory requirements.

This shall include confirmation that a bidder has complied with the special condition of tender above.

Failure to meet any one of the above requirements stated in the special conditions of the contract shall lead to automatic disqualification.

Stage Two: TECHNICAL EVALUATION (70 MARKS)

 

ITEM DESCRIPTION UNIT QTY MARKS ALLOCATED   MARKS RECEIVED  
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerator to Nema standards        
 

 

The following are the incinerator specifications :-        
           
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste     35  
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

The tank should be connected to the incinerator at a higher level to enable free-flow of diesel from the tank to the incinerator. The connecting pipe must be a black pipe of approved gauge and diameter. Include other accompanying accessories and fittings

Item 1 20  
C Installation & commissioning works        
D Positioning of Incinerator: –

Provide lifting gears as forklift, gantry, rollers, and lifting jacks and position incinerator.

Item 1 10  
E Connect burners to fuel supply. No. 2 5  
F Chimney Installation:        
 G Composition of the chimney: –

Provide a chimney with scrubber (for filtration)

Provide lifting gear to hoist, erect and mount chimney, and provide supports slings as necessary. Allow for cutting of tree branches to facilitate the exercise.

The chimney shall be painted with approved heat resistant paint after installation.

Item. 1 10  
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1 10  
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3 10  
  TOTAL      

100

 

 

Pass mark for technical evaluation is 70/100 marks

 

Stage Three: Site Visit

The evaluation committee will visit the premises of the bidders who are responsive to technical  evaluation stage to verify the authenticity of statutory document submitted; ascertain the accuracy of the information given in the tender documents, assess firm’s capacity, location, among others.

The Tenderer will be automatically disqualified where false or fraudulent Information is found to have been given.

 

Stage 4 Commercial Evaluation

Bids that pass the above three (3) stages shall be compared on the basis of prices / cost quoted and the lowest priced will be considered the lowest evaluated bid and subsequently recommended for award. Prevailing market prices will be used to determine the price responsiveness of the bidders.

 


SECTION V – SCHEDULE OF REQUIREMENTS

 

ITEM

NO

ITEM DESCRIPTION UNIT QTY. REQUIRED UNIT PRICE (KHS) REMARKS
1. Supply, Delivery, installation and commissioning of Incinerator in  

 

 

NO

 

 

 

 

 

 

1

   
2. Supply, Delivery, installation and commissioning of Incinerator  

 

 

NO

 

 

 

 

 

 

1

   

 

 

 

 

Signature of tenderer

 

Note: In case of discrepancy between unit price and total, the unit price shall prevail.

 

SECTION VI – STANDARD FORMS

 

  1. Form of tender
  2. Contract form
  3. Confidential Questionnaire form
  4. Tender security form
  5. Performance security form
  6. Bank guarantee for advance payment
  7. Declaration form

 

 

 

 

Heater YD-100 for Iraq


There are 03 sets Design YD-100 circulation to Iraq between year 2013 to 2014. The heater use for neighborhood a number of structure as well as construction sites in addition to all gas kind is diesel oil.

Items/Model YD-100
Burning Rate (kgs/Hour) 100 kgs/Hr.
Feed Capacity (kgs) 200 kgs
Equipment Weight 5300 kgs
Primary Chamber (Liters) 1200
Secondary Chamber (Liters) 500
External Dimensions (cm) 220x180x360
Internal Dimensions (cm) 130x100x90
Oil Tank(Liters) 300
Door Opening (cm) 55 x 80
Chimney (M) 10
Chimney Type Stainless Steel
Secondary Chamber  YES
Mix-Combustion Chamber YES
Smoke Filter Chamber YES
Combustion Fuel Oil/Gas
Residency Time 2.0 Sec.
Temperature Monitoring YES
1st. Chmaber Temperature 800–1000
2nd. Chmaber Temperature 1000-1200
Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.


domestic incinerator

Documents to be submitted as following ;

  • Fabricators accreditations
  • Test report to prove ZERO harmful emission level provided as samples form other installations
  • Test report to prove sterility achieved at 6log to 10 level to be provided upon commissioning report and validation.

 

Technical proposal include:

  • The hospital should provide the necessary space: building & infrastructure, sufficient power steam supply and

connection up to room water & sewage line to the room

  • Room preparation: preparation, Renovation & Modification of the room is suppliers responsibility
  • The supplier should submit the necessary drawing showing space requirements ( room size (LxWxH) dimensions of

processors & ancillary equipment

  • Supplier must give the proposal of the total power requirement of the whole unit and on which the hospital will

ensure the power supply. However connections inside the room is suppliers responsibility

  • The connection/fittings form the processor and ancillary equipment to water and sewage line is suppliers

responsibility.

  • A detailed training proposal including the duration of staff training on how to operate and maintain the processor
  • A detailed maintenance schedule.
  • List of spare parts and accessories required for maintenance of the system

 

Warranty & After Sales Services:

  • Warranty period will be minimum 03 years or as offered by the manufacturer which comes later.
  • Warranty period will be counted from the date of handing over of machine over of machine to the user in functioning

condition i.e date of commission.

  • In warranty period supplier have to provided all maintenance & repair services.
  • Breach time will not be counted in warranty period.
  • At least 10 years back up service (including warranty period) has to be ensured by the supplier.
  • The repair/maintenance work should be carried out within 72 hours after getting request for such from the user.

 

Quality standard: CE/FDA certificate of the offered item must be submitted with the offer.

  • For verification of the certificate bidder must submit the following :
  1. i) Mailing address of the issuer of the certificate.
  2. ii) Website, Email address & Fax & Telephone Number of the issuer.
  • The bid will be non-responsive if:
  1. i) The certificate issuer can not be reached
  2. ii) The issuer fails to authentic the certificate within the bid validity

iii)   The issuer confirms that the submitted certificate is defective in terms of authenticity or validity.

Heater YD-30 for Australia


Heater Layout YD-30 for Australia Melbourne client.

Items/Model
YD-30

Burning Rate (kgs/Hour).
30 kgs/Hr.

Feed Ability (kgs).
60 kgs.

Tools Weight.
2300 kgs.

Main Chamber (Liters).
360.

2nd Chamber (Liters).
200.

Outdoors Dimensions (cm).
145x90x175.

Inside Measurements (centimeters).
100x60x60.

Oil Tank( Liters).
200.

Door Opening (centimeters).
48 x 60.

Smokeshaft (M).
5.

Chimney Kind.
Stainless-steel.

Added Chamber.
UNDOUBTEDLY.

Mix-Combustion Chamber.
INDEED.

Smoke Filter Chamber.
CERTAINLY.

Combustion Fuel.
Oil/Gas.

Residency Time.
2.0 Sec.

Temperature level Tracking.
YES.

First. Chmaber Temperature degree.
800 ℃–– – – 1000 ℃.

Second. Chmaber Temperature level.
1000 ℃ -1200 ℃.

Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.


China promises control as infection expands




THAT proclaims break out makes up global public wellness emergency

China guaranteed on Friday to work with the worldwide community to support regional as well as also international wellness safety, and also repeated it has the positive self-image as well as additionally capability to win the fight versus the one-of-a-kind coronavirus epidemic, which has in fact asserted 213 lives throughout the nation considering that Thursday.

THAT DirectorGeneral Tedros Adhanom Ghebreyesus, who lately finished his browse through to China, specified the declaration was not a tally of no positive self-image in China.

THAT declares break out makes up global public health and wellness emergency

China guaranteed on Friday to work with the worldwide area to support neighborhood and also global wellness safety and security, and duplicated it has the self-esteem and likewise ability to win the battle versus the unique coronavirus epidemic, which has actually insisted 213 lives throughout the nation because Thursday.

THAT DirectorGeneral Tedros Adhanom Ghebreyesus, who lately completed his visit to China, stated the statement was not a ballot of no self-confidence in China.

“We would certainly have seen much more instances outside China by now, as well as also potentially deaths, if it were other than the federal government’s efforts as well as the development they have really made to safeguard their own people as well as the individuals of the globe,” Tedros specified.

Sparkling wine asserted Canada really values China’s solid actions as well as the open and likewise clear fashion it has actually conducted itself in prevention as well as control of the transmission, and likewise is likewise absolutely certain of its capability in taking treatment of the epidemic.

“We would have seen much more cases outside China by now, and also possibly fatalities, if it were except the government’s efforts as well as the progression they have actually made to protect their own individuals as well as the people of the globe,” Tedros stated.

“The rate with which China detected the outbreak, isolated the virus, sequenced the genome as well as shared it with THAT as well as the world are really impressive as well as past words. Is China’s dedication to openness and sustaining other nations. In lots of methods, China is actually establishing a new requirement for outbreak feedback, and this is not an exaggeration,” he included.

Throughout a telephone conversation with Canadian Foreign Minister FrancoisPhilippe Champagne on Friday, State Representative and Foreign Preacher Wang Yi revealed hope that Ottawa will certainly value the recommendations of the THAT in a goal and reasonable way to make certain profession exchanges and also travel of individuals between China and Canada will not be influenced.

Sparkling wine claimed Canada very values China’s strong steps and the open and also clear fashion it has conducted itself in prevention as well as control of the contagion, and also is also totally certain of its capability in taking care of the epidemic.

China’s leading agent to the United Nations, Zhang Jun, gotten in touch with the worldwide neighborhood to show “solidarity” in managing the break out. Addressing an information gathering at UN headquarters in New York on Thursday, Zhang claimed the WHO recommendations “must be seriously taken into consideration” as well as “there is no reason for steps that needlessly hinder global travel and also profession”.

He required all nations to adopt a liable perspective, work together to combat the virus and prevent overreacting.

Since the break out of the transmission, leaders of foreign nations as well as global organizations have voiced their support for, as well as extremely applauded, China’s efforts to suppress the spread of the virus.

Angus McNeice in London and also Hong Xiao in New york city contributed to this tale.

Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.


Wuhan virus: China mobilises medical groups to fight new coronavirus



WUHAN (Bernama): China is mobilising medical staff to aid Wuhan, the centre of the novel coronavirus (2019-nCoV) outbreak, as the country reported 830 confirmed cases of pneumonia, caused by the virus and 25 deaths by the end of Thursday (Jan 23).

By Thursday midnight, Hubei Province in central China reported 549 cumulative confirmed cases of the new coronavirus pneumonia, with 495 in Wuhan, the provincial capital. Nationwide, 29 provincial-level regions have reported confirmed cases.

Twenty four deaths from the infection were reported in Hubei and one was in the northern Hebei Province, the National Health Commission (NHC) said Friday (Jan 24).

The first group of 135 medical workers from hospitals in Shanghai flew to Wuhan on Friday night. Shanghai is dispatching 405 medical workers in three groups to Wuhan.

Ma Xin, vice president of Huashan Hospital, Affiliated to the Fudan University in Shanghai, said, one hour after he issued a notice of the recruiting in the hospital, three teams, each consisting of one doctor and three nurses, were set up.

An aid team consisting of 205 experienced doctors and nurses from nine hospitals in Guangdong Province has been set up and stands ready to leave for Wuhan, said Tan Linling, an official with the provincial health commission.

Doctors, nurses and experts from hospitals in other places such as Zhejiang and Sichuan have been selected or volunteered to sign up for the task.

Hubei reported 105 new confirmed novel coronavirus cases and an increase of seven deaths related to the new pneumonia disease on Thursday, the provincial health authorities said Friday.

Nationwide, large-scale activities for the Lunar New Year celebrations, including temple fairs, winter sports and exhibitions, have been cancelled, in efforts to minimise large gatherings of people in the novel coronavirus-related pneumonia prevention and control.

Beijing’s landmark Palace Museum, also known as the Forbidden City, will stop admitting visitors from Sunday (Jan 26). The museum said it will notify the public when there is a resumption date.

South China’s Guangdong Province banned the trade of wildlife and related products in the province, as the geographical distribution of Wuhan’s infection cases indicates a close relationship between the outbreak and illegal sales of wildlife in a market.

Confirmed cases of the virus have also been reported in the regions of Hong Kong, Macao and Taiwan, as well as, such countries as the United States, Japan, the Republic of Korea and Thailand.

The World Health Organisation said, it was too early to declare the outbreak of the novel coronavirus in China a public health emergency of international concern while warning that the number of cases may rise, as much about the virus remains unknown.- Bernama
Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.


medical waste

———————————–

 

  • Failure to establish the authenticity of the certificate the bidder is liable to render the bid non-responsive and

bidder open to action in the line with applicable regulations and act.

  • Original catalogue must be submitted
  • Original data sheet must be submitted

Lot-B

  1. Solidifier (Fluid waste disposal Product)

 

Liquid Waste Solidifier for Water Based.

 

Special Features of Solidifier

21b bottle

  • Effectively solidifies potentially serious infectious waste quickly
  • Quickly penetrates to solidify blood and body fluid to convert Gels in seconds
  • No shaking required
  • Retains solidity to prevent spills and leaks for safe and easy bagging and easy Transport to disposal
  • Concentrated formula: one ounce solidifies 1000 cc of liquid
  • Dissolvable pouches gel 500 cc and 1000 cc, eliminating plastic bottle waste Chlorine-free for non-toxic incineration

 

Physical/Chemical Characteristics:

Boiling Point ( F) : N/A   Appearance & Odor: Off white,

odorless

Vapor Pressure (mm Hg) : N/A Volatiles (‘% by weight):

N/A

Vapor Density (Air = 1): N/A     Evaporation Rate (n-

butylacetate = 1): N/A

HMIS Classification:

Health: 1: Flammability: 1

Reactivity Data:

Stability: Stable

Conditions to Avoid: None known

Incompatibility (materials to avoid): Strong oxidizers

Hazardous Decomposition: Thermal decomposition: CO, Co2, and NOx hydrocarbons

Hazardous Polymerization: Will not occur

Handling and Storage Precautions:

Store in cool, dry place. Avoid breathing powder. Avoid eye and skin contact. Store in tightly closed container. 80% of

shelf life should be present at the time of supply.

50kgs per hour burner with 2 chambers vendors from china


50kgs per hour incinerator with two chambers suppliers from china
*Aveage 50kgs per hour
*Double chamber and double burner
*900liters primary combustion chamber
*Italy burner
*Stainless steel chimney

Variation

YD-50

Burning Cost

Average 50 kgs/hour

Feed Ability

Typical 150 kgs

Primary Burning Chamber

900 Litres

Added Combustion Chamber

300 Litres

Mix Burning Chamber

Yes

Smoke Filter Chamber

Yes

Feed Setting

Manual

Voltage

220V/380V

Power

0.7 Kw

Gas Type

Diesel Oil/ All-natural Gas/LPG

Heater

Italy Original

Oil Usage (Diesel Oil)

12.1– – 23.9 kg/hour

Gas Intake (Gas)

9.9– – 26.1 m3/hour

Interior Measurements

120 x 90 x 85cm (trick chamber)

Outdoors Measurements

200 x 160 x 310cm (without smokeshaft)

Temperature Level Monitor

Yes

Oil Container Capability( if oil gas)

300 Litres

Door Opening

62 x 80cm

Smokeshaft Size

5.0 Meters

Chimney Kind

Stainless-steel

Devices Gross Weight

5500 kgs

Procedure Technical Specs

Trick Chamber Temperature

800 ℃–– – – -1000 ℃

Secondary Chamber Temperature Level

1000 ℃ -1200 ℃

Residency Time

2.0 Sec.

Burning Performance

> 98%

Waste Lower Calorific Power

3000Kcal

Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.


30kgs medical waste heater Design TS30 PLC .


30kgs per hour(average) medical waste incinerator, design dual 
combustion chambers(primary chamber and secondary chamber), 
smoke filter chamber, PLC auto. control system, 0.33m3(330liters)
primary combustion chamber, italy oil or gas fuel burner. for small 
hospital medical waste treatment.
Buy waste incinerator, find hiclover

Items/Model

TS30 PLC

Idea

Waste Incineration

Burn Rate

Criterion 30kgs/hour

Gas Kind

Diesel Oil/Natural Gas

Control Setting

Programmable Thinking Controller( PLC) Panel

Key Combustion Chamber

0.33 m3

Inner Measurements( Primary)

750x750x600 mm

Secondary Burning Chamber

0.18 m3

Internal Dimensions( Secondary)

400 x 750 x 600 mm

Smoke Filter Chamber

Yes

Feed Establishing

Guidebook

Voltage

220V

Power

0.5 Kw

Oil Intake

10.2– – 20.0 kgs/hour

Gas Consumption

9.8– – 20.0 m3/hour

Temperature Display

Digital Program

Temperature Level Protection

PLC Control

Time Setting

PLC Control, 0-120 Minutes

Oil Container

100 Liters

Waste Feed Door

550x500mm

Smokeshaft

5.0 Meter

Smokeshaft Kind

Stainless-steel

Key Chamber Temperature Degree

800 ℃–– – – 1000 ℃

Additional Chamber Temperature Degree

1000 ℃ -1200 ℃

Residency Time

2.0 Sec.

Gross Weight

3000kgs

External Measurements

1750x1200x1400 mm


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator
Medical Environmental 

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.