Tag: wasteincinerators

Containerized diesel fueled burners


Heater Kind: Containerized, gasoline
Burning Price:100–– – – 120kg/hour. Minimum Operating Temperature:850 o C( key combustion).
Optimum Operating Temperature:1450 oC( Afterburner chamber).
Extra Burning Ability: Compulsory.
Density Insulation:20 mm High.
Refractory Dispersing: Minimum 65mm.
Strong refracting lining to hold up against:1500 oC.
Common stress out time: optimum:3 personnels.
Fuel kind: Diesel.
Gas Intake in L/hr:7.5 to 9.
Residence time in secondary chamber:2 sec.
Residue ash pot 100kg: Max 3.8 kg.
Heater kind: Pet waste burner.
Lots Capacity minimum: 1500 kg.
Heating unit gas kind: Diesel.
Heater fuel price max.: 20-25 Litre diesel/ per hr.
Heaters minimum: 3.
Burning rate minimum: 200-300kg/ per hr.
Heating system bar place minimum: 2 м3.
Gas container capacity minimum: 300L.
Key chamber melting temperature level min. 1100 0C.
Afterburner chamber burning temperature minutes. 1300 0C.
Power supply 220V.
Burner products and also electrical tools should be weather condition proof as well as also moisture immune within the collection of 30-90 %.
Burner requires to be certified to the ecological monitoring policies in accordance to national legislation.
Maximum dimensions– – Dimension – 5m, size – 3.5 m, altitude – 5m


Diesel/LPG/LNG burning vital burning chamber/primary combustion burner


Key burning
Diesel/LPG/LNG burning vital burning chamber/primary burning area
Second burning
Residence time in the second chamber not less than 2 secs
Both essential along with the second temperature levels maintained up until all the waste has in fact been entirely stired up
Chimney
Chimney with a very little height of 4 meters over ground level
Minimum leave velocity of the discharges very little less than 10 metres/second
Temperature level Cautions
Visible and/or distinctive alarm to warn the vehicle driver when the second temperature level drops to listed below the needed temperature level
General
Control box that can be separated as well as mounted on different stand a minimum of 1.5 meters from burner at around 1.6 meter

heightItem 1
Burner style A

Melt Rate 65kg/h minimum

Weight (kg), please show:

Secondary Chamber

Gas Retention Time – – – – 2 Secs

– Fuel – Diesel/LPG/LNG, please show

Power Supply for Control Box – 220V-240V 50Hz solitary phase

Minimum running temperature level 850 ° C, please recommend

One year Spare Components Prepare for total maintainability

10m Tube Pipe, recommend size

I000 Litre Gas Tank + Pipeline System, show quantity

Added smokeshaft expansion, show elevation

Solution guarantee, suggest no of years

Thing 2
Incinerator version C.
Burn Rate 250kg/h minimum

Weight (kg) please showProgram.
2nd Chamber.
Gas Retention Time 2 Secs.
Fuel Diesel/LPG/LNG, please show.
Power Supply for Control Box 220V-240V 50Hz solitary stage
. Minimum running temperature level 920 ° C, please recommend.
One year Spare Elements Bundle for full maintainability.
10m Hose pipe Pipe, indicate size.
I000 Litre Gas Tank + Pipe System, indicate quantity.
Bonus smokeshaft expansion, suggest elevation.
Guarantee, indicate no of years

Warmth Waste Incinerator

Capability at least (4000) kg/day (( Day= 16 Working Humans Resources))

Capability at the very least (4000) kg/day (( Day= 24 Working Hrs))

With the following qualities:

* Automatic feeder as initial part of the unit.

* Automatic ash/ leftovers removal as preliminary part of the device.

* Water Injection System to manage the temperature > >

* Flue gas filtering system abiding by EU.
HTW Incinerator design D.
Burn Rate – – – – 150kg/hour minimum. Weight( kg), please indicate:.
Secondary Chamber.
Gas Retention Time 2 Seconds.
Gas Diesel/LPG/LNG, please program.
Power Supply for Control Box 220V-240V, solitary stage 50-60Hz.
Minimum running temperature level 1200 ° C, please program

One year Spare Components Prepare for full maintainability

10m Tube Pipe, show size.
1000 Litre Gas Storage Tank + Pipeline System, suggest quantity.
Bonus chimney extension, suggest height.
Mobile Burner

Item 5.
Mobile Heater version E

Melt Cost 50kg/h minimum

Weight (kg), please program:

Second Chamber

Gas Retention Time – – – – 2 Seconds –

– Gas – Diesel/LPG/LNG, please suggest

Power Supply for Control Box – 220V-240V 50Hz solitary stage

Minimum running temperature degree 850 ° C, please suggest

One year Spare Elements Package for complete maintainability.
Mobile Incinerator

Point 6.
Mobile Incinerator variation F

Melt Rate 100kg/h minimum

Weight (kg), please indicate:

Second Chamber

Gas Retention Time – – – – 2 Secs

– Fuel – Diesel/LPG/LNG, please suggest

Power Supply for – Control Box – 220V-240V 50Hz solitary phase

Minimum running temperature level 850 ° C, please suggest

One year Spare Components Bundle for full maintainability

10m Pipeline Pipe, suggest size

1000 Litre Gas Container + Pipe System, show amount

Additional smokeshaft expansion, show elevation

Service warranty, indicate no of years.
Warmth Waste Mobile Incinerator.
Product 7.
HTW Mobile Heater version G.
Burn Cost 100kg/h minimum.
Weight (kg), please suggest:.
Second Chamber.
Gas Retention Time – – – – 2 Seconds. Fuel – Diesel/LPG/LNG, please indicate

Power Supply for Control Box – – – – 220V-240V 50Hz solitary stage

Minimum running temperature level 1200 ° C, please suggest.
Key burning.
Diesel/LPG/LNG burning primary burning chamber/primary combustion area.
2nd burning.
Residence time in the second chamber not much less than 2 seconds.
Both primary and the additional temperature levels protected up until all the waste has been totally ignited.
Smokeshaft.
Smokeshaft with a marginal altitude of 4 meters over ground level.
Minimum leave rate of the emissions not less than 10 metres/second.
Temperature level Cautions.
Audible and/or noticeable alarm to encourage the driver when the additional temperature goes down to listed below the called for temperature level.
General.
Control box that can be separated as well as mounted on separate stand at least 1.5 meters from burner at about 1.6 meter

altitude.
Assurance, show no of years

Weight (kg) please show:.
Service warranty, indicate no of years

Warmth Waste Burner

Ability at the very least (4000) kg/day (( Day= 16 Functioning Hrs))

Ability at the very least (4000) kg/day (( Day= 24 Working Hrs))

With the complying with qualities:

* Automatic feeder as original component of the device.

* Automatic ash/ leftovers elimination as preliminary element of the system.

* Water Injection System to control the temperature level > >

* Flue gas filtering system following by EU.

* Consistent discharge monitoring and also recording system.

elevation.
Guarantee, show no of years


Needs for Twin Chamber Heater


BURNER DESCRIPTION
The Version is for as much as 300kgs capability per batch bunches in addition to will absolutely lose at around 55kgs per hour.
The system has leading packing style and has a strong refractory concrete lining for optimal heat retention. Gadget have huge leading cover for extremely easy loading, along with especially made front ash door, for ash elimination.
This system performs at over 1100 ° C in the vital chamber to guarantee total combustion. This design likewise benefits
from a strong second chamber as well as burner that makes particular a complete re-burn of any smoke along with exhausts along with a 0.5 second gas retention time.
Thaw rate 150kg/h minimum
Second Chamber Yes.
Gas Retention Time 2 secs.
Gas Diesel/LPG/LNG.
Power Supply for Control Box 220V-240V 50Hz singular phase.
Minimum Operating Temperature Level 920 ˚C

PRIMARY CHAMBER.
Resilient steel case.
Outstanding quality refractory lining as well as insulation.
Substantial full dimension leading lots door and also fluid retention sill.
1 x diesel oil terminated ignition heating systems operated on/off.
EXTRA CHAMBER.
Sturdy steel housing.
High quality refractory lining along with insulation.
1 x diesel oil fired ignition heating units ran on/off.
Requirements for Dual Chamber Incinerator:.
Key Burning.
The primary burning chamber will be approved as the crucial burning area.
The minimum burning temperature of the vital chamber shall not be much less than 800 degrees c.
Additional Burning.
The house time in the second chamber will certainly not be a lot less than 2 secs.
The gas temperature degree as gauged versus the within wall surface in the additional chamber, not in the fire zone will certainly not be less than as suggested in Lot 1-7.
Both the additionally additional as well as primary temperature levels will be maintained till all the waste has actually been completely ignited.
Chimney.
The chimney shall have a very little height of 4 metres over ground level.
The minimal departure rate of the discharges will not be less than 10metres/second.
Temperature Cautions.
When the second temperature level drops to listed below the required temperature level, a distinct and/or recognizable alarm to alert the operator.
General.
Control box can be divided and also installed on different stand of atleast 1.5 metres from the burner at about 1.6 metre altitude.
CE certified or equal for burners of this measurement and additionally design.
Drawings along with images for the provided whole lots.
1 year extra parts, gas containers as well as 10metre pipe ahead typical with every heater.
Specs for Mobile Heater Units.
Trailer mounted mobile burner tools excellent for the following applications.
Clinical waste.
Residential waste.
Industrial waste.
Pet cadavers.
SMOKESHAFT.
Resilient stainless-steel situation.
1.5 m dimension.
0.6 m refractory lined stack.
CONTROL PANEL.
Control of 1 heating unit.
Timer control 0- 12 hrs.
Vital fan timer control.
Temperature level Monitoring.
Thermostatic Control.
Automatic Control.
Cycle time developed.
ANCILLARIES.
Running along with maintenance handbooks.
Saves listing.
CONTAINERISATION.
incinerator absolutely mounted within 10 ft ISO accredited container.
3,5 kwA electrical power generator, 1000 litres fuel storage tank.
Burner placed on the silenblock padding.


PROGRESSED MEDICALWASTE HEATER


Incinerator design A.
Burn Rate 65kg/h minimum.
Weight (kg), please recommend:.
Second Chamber.
Gas Retention Time – – – – 2 Secs. Power Supply – for – Control Box – 220V-240V 50Hz solitary stage.
10m Pipe Pipeline, show size. I000 Litre Gas Container+ Pipeline System, show quantity.
Included chimney expansion, suggest elevation. Guarantee, indicate no of years. The minimum combustion temperature degree of the main chamber will certainly not be less than 800 degrees C;

Second combustion.
The residence time in the second chamber will not be much less than 2 seconds;.
The gas temperature degree as determined versus the within wall surface area in the second chamber, not in the fire location, will not be a lot less than as received Lots 1-7;.
Both the major as well as the 2nd temperature degrees will certainly be maintained till all the waste has been entirely ignited;

Smokeshaft.
The smokeshaft will have a marginal elevation of 4 meters over ground degree;.
The minimal leave rate of the discharges shall not be less than 10 metres/second;

Temperature Level Warnings.
When the secondary temperature drops to detailed below the required temperature level;

General, a noticeable and/or distinct alarm system to encourage the driver.
Control box can be gotten rid of in addition to placed on different stand at least 1.5 meters from incinerator at around 1.6 meter elevation;

Great Deal 2.
Point 5 Burner design B.
Burn Price 150kg/h minimum.
Weight (kg), please suggest:.
Extra Chamber.
Gas Retention Time – – – – 2 Seconds. Diesel/LPG/LNG, please suggest.
One year Spare Parts Package for complete maintainability.
Thing 6 10m Tube pipe Pipeline, indicate dimension.
Item 7 I000 Litre Gas Tank + Pipeline System, suggest quantity.
Item 8 Included smokeshaft extension, show altitude.
Warranty, show no of years.
Large amount 3.
Point 9 Incinerator layout C.
Burn Rate 250kg/h minimum.
Weight (kg) please indicate:.
2nd Chamber.
Gas Retention Time 2 Secs.
Gas Diesel/LPG/LNG, please show.
Power Supply for Control Box 220V-240V 50Hz single stage.
Minimum operating temperature level 920 ° C, please indicate.
One year Spare Components Bundle for complete maintainability.
Product 10 10m Tube pipeline Pipeline, show length.
Thing 11 I000 Litre Gas Container + Pipeline System, indicate volume.
Thing 12 Extra chimney extension, reveal height.
Guarantee, indicate no of years.
Lot 4– – Warm Waste Burner.
Point 13 HTW Burner style D.
Burn Price – – – – 150kg/hour minimum. Weight( kg), please show:.
Additional Chamber.
Gas Retention Time 2 Secs.
Fuel Diesel/LPG/LNG, please suggest.
Power Supply for Control Box 220V-240V, solitary phase 50-60Hz.
Minimum running temperature level 1200 ° C, please show.
One year Spare Components Package for complete maintainability.
Thing 14 10m Hose pipeline Pipe, suggest size.
Item 15 1000 Litre Gas Tank + Pipeline System, reveal amount.
Product 16 Added smokeshaft development, reveal elevation.
Solution guarantee, reveal no of years.
Good deal 5– – Mobile Burner. 2. Incinerator gives 2 chamber incineration in addition to holds gasses for a minimum of 2 seconds.
3. Each incinerator needs to have appropriate labelling for parts/areas of high job health and wellness threat on the incinerator.
& & Country Issues, or European Union regulations and guidelines.

Item 17 Mobile Burner version E.
Burn Rate Price minimum.
Weight (kg), please show:.
Second Chamber.
Gas Retention Time – – – – 2 Seconds. Gas – Diesel/LPG/LNG, please program. Power Supply for – Control Box – 220V-240V 50Hz single stage. Minimum operating temperature level 850 ° C, please program. One year Spare Parts Bundle for complete maintainability. Product 18 10m Hose pipe Pipeline, reveal
dimension. Item 19 1000 Litre Gas Storage Tank + Pipeline System, show volume.
Item 20 Extra chimney expansion, suggest height.
Great deal 6– – Mobile Burner.
Item 21 Mobile Burner design F.
Burn Price 100kg/h minimum.
Weight (kg), please suggest:.
Additional Chamber.
Gas Retention Time – – – – 2 Secs. Gas – Diesel/LPG/LNG, please suggest –. Power Supply – for – Control Box – 220V-240V 50Hz solitary phase. Minimum running temperature level 850 ° C, please recommend. One year Spare Components Plan for full maintainability.
Item 22 10m Hose pipe Pipe, show size.
Point 23 1000 Litre Gas Tank + Pipeline System, recommend quantity.
HTW Mobile Burner style G.
Burn Price 100kg/h minimum.
Weight (kg), please indicate:.
Extra Chamber.
Gas Retention Time – – – – 2 Seconds. Fuel – Diesel/LPG/LNG, please show.
Power Supply for Control Box – – – – 220V-240V 50Hz singular phase.
Minimum running temperature level 1200 ° C, please suggest.
One year Spare Parts Package for total maintainability.
10m Pipeline Pipeline, show size.
1000 Litre Gas Storage Tank + Pipeline System, suggest volume


a burner for food waste as well as also polythene waste administration


an incinerator for food waste and polythene waste administration. based on our needs we would such as the YD 15C tiny incinerator.Mixed Biomedical waste Incinerator.Contract period: To be chosen by the provider
Negotiation terms:100% prepayment via banks TT after signing of contract.

Please validate your resolution to perform this contract job by sending handout and also your rate quotation for the listed below specification to allow us submit it to the firm incharge of the agreement for their study and additionally authorization.

Sort Of Waste: Mixed Biomedical waste.THE BURNER AS REQUESTED BY OUR CUSTOMER SHALL BE SEMI AUTOMATIC WITH:
WASTE BUCKET/TANK – – – – CONCERNING 2000KG CAPACITY OF FEEDING: REGARDING 600-800Kg Each Time.
THAWING AT ABOUT 150/165 -200 IN 60MINS THE HEATER SHALL USE DIESEL/OIL WITH SMOKESHAFT, ELECTRIC PANNELS, ELECTRIC MOTORS, And So On.
PRODUCTS FOR DISPOSAL: SHARP MEDICAL WASTES.

1. Waste burning ability of device: 100-125 kgs/ personnels.
3. 5.
6. Connected electric great deals: Approximate. 7-8 KW (A/C 3 stage,220 V, 50 Hz).
7. Total area need: 9 m (L) X 8 m (W) X 6 m (H) Each unit without stack

Heaters temperature degree regulated (TIC– – Thermocouple) as well as likewise handle ON––. OFF basis. The consistency on ON– – OFF will certainly depend upon the nature of.
waste, dampness web material, calorific worth, and more along with will certainly vary from waste to.
waste. The gas usage similarly depends upon the frequency of the door.
opening along with strategy of operation of the incinerator. We have in fact mentioned.
approx. expected fuel usage figures.

The Incineration System includes:

I. Key Incinerator with.
A. Main & & & & Additional Chamber Modules appropriately refractory lined, piped & & & & wired.
B. Container lift + DFDV gadget for autoloading and also Deashing.
tool.
II i. 1 No. totally automated Gas Oil burner for main chamber.
ii. 1 No. totally automated Gas Oil heating system for extra chamber.
III. Centrifugal forced draft follower establishing total with electric motor drive, duct as well as also.
dampers, and so forth set up on the regular skid of the gadget to offer:.
Burning air.

Eductor air.
IV. Eductor Establishing for:.
A/c of exhaust gases from 900– – 1000 0 C to around 350 0 C. Keeping the entire system under negative anxiety to stay clear of hot gases/ dirt.
bits hurrying out of billing door.
V. Electric Control Panel along with safety and security as well as protections, as well as likewise Audio/ Visual.
signs as well as.
/ or alarm systems for effective and likewise risk-free treatment of the system.
VI. Electric electric wiring of the device.
VII. Oil tank of 1000 ltrs capability placed on the skid.
VIII. Operating tools and also takes on consisting of– – rake, hoe, shovel (I No. each).
IX. Smokeshaft of 2.5 Mtr elevation.


3 Combustion Chambers MEDICAL WASTE BURNER


Model

WS-35

Image

Burning Rate

Ordinary 35 kgs/hour

Feed Ability

Average 80 kgs

Main Burning Chamber

460 Litres

Secondary Burning Chamber

200 Liters

3rd Burning Chamber

200 Litres

Smoke Filter Chamber

Damp Scrubber System

Feed Setting

Handbook

Voltage

220V

Power

2Kw

Fuel Type

All-natural Gas/LPG

Burner

Italy Original

Oil Intake (Diesel Oil)

***

Gas Consumption (Gas)

Average 24 m3n/hour

Inner Dimensions

110 x 70 x 60cm (main chamber)

Outside Measurements

160 x 100 x 180cm (without wet scrubber)

Temperature Display

Yes

Oil Container Ability( if oil gas)

***

Door Opening

50 x 50cm

Smokeshaft Length

5.0 Meters

Smokeshaft Kind

Stainless-steel

Tools Gross Weight

5000 kgs

Operation Technical Specs

Primary Chamber Temperature Level

800 ℃–– -1000 ℃

Secondary Chamber Temperature

1000 ℃ -1200 ℃

Residency Time

2.0 Sec.

Burning Performance

> 98%

Waste Lower Calorific Power

3000Kcal

Primary chamber:
Heavy duty mild steel casing, High quality Refractory lining and insulation 01 x natural gas ignition burners (automatic) 01 x temperature 

sensor points with complete internal fans.
Secondary Chamber:
Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas burners (automatic) with complete 01 internal fans. 

02 Sec gas residence times.
Third Chamber:
Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas ignition burners (automatic) with complete internal 

fans. 02 Sec gas residence time.

HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-25



Containerized Type Pre-Assembled Mobile Medical Facility Waste Burner Model CA100


Items/Model

CA100

Image

Concept

Medical Waste Incineration Treatment

Burn Price

Average 100 kg/hour

Feed Capability

Standard 200kg/feeding

Control Mode

PLC( Programmable Logic Controller Burner)

Burning Chamber

1200L

Internal Measurements

120x100x100cm

Secondary Chamber

600L

Smoke Filter Chamber

Yes

Feed Mode

Handbook

Voltage

220V

Power

1.3 Kw

Oil Consumption (kg/hour)

Ordinary 20.4 Kgs/Hour

Gas Usage (m3/hour)

***

Temperature Display

Digital Show

Temperature Level Defense

Yes

Oil Container

200L

Feed Door

80x60cm

Smokeshaft

5Meter

Smokeshaft Kind

Stainless Steel

1st. Chamber Temperature

800 ℃–– -1000 ℃

second. Chamber Temperature Level

1000 ℃ -1200 ℃

Residency Time

2.0 Sec.

Gross Weight

6000kg

External Dimensions

260x150x180cm

HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-25



Small Medical Waste Incineraotr for COVID-19 Bio Hazardous Medical Waste


HICLOVER – Medical Environmental 

Model

YD-20

Photo

Burning Rate

Typical 20 kgs/hour

Feed Capability

Ordinary 60 kgs/feeding

Main Burning Chamber

360 Litres

Secondary Burning Chamber

200 Liters

Mix Combustion Chamber

Yes

Smoke Filter Chamber

Yes

Feed Setting

Guidebook

Voltage

220V

Power

1.0 Kw

Gas Type

Diesel Oil/ Natural Gas/LPG

Burner

Italy Original

Oil Intake (Diesel Oil)

Standard 13.3 kg/hour

Gas Usage (Gas)

***

Inner Dimensions

100 x 60 x 60cm (key chamber)

Outside Dimensions

145 x 90 x 260cm (without smokeshaft)

Temperature Level Screen

Yes

Oil Storage Tank Capability( if oil gas)

200 Litres

Door Opening

48 x 60cm

Chimney Length

5.0 Meters

Smokeshaft Kind

Stainless-steel

Equipment Gross Weight

2300 kgs

Operation Technical Specs

Primary Chamber Temperature

800 ℃–– -1000 ℃

Second Chamber Temperature Level

1000 ℃ -1200 ℃

Residency Time

2.0 Sec.

Burning Efficiency

> 98%

Waste Lower Calorific Power

3000Kcal

Wearing a face mask to keep out the coronavirus has become an essential part of everyday life for many people 
around the world, but the huge amount of waste being created as the single-use items are tossed aside has the 
potential to become an ecological disaster.

How to deal with discarded face masks, which number in their millions or even billions, is another headache for 
Chinese authorities already caught between containing the viral disease and limiting the economic damage caused by it.

The country’s inadequate medical waste treatment capabilities have also been put under the spotlight, environmental experts said.

Environment and health authorities say masks and other protective gear, especially items used by medical personnel and 
people infected with the coronavirus, should be treated as clinical waste, and sterilised before being incinerated at high 
temperatures at dedicated facilities.

While it is difficult to get an exact figure on the number of discarded masks, it is reported that the volume of medical 
waste in Wuhan, the city in which the epidemic began in December, had quadrupled to more than 200 tonnes a day last 
week, according to mainland Chinese media reports.

The total amount of medical waste gathered across Hubei province on February 24 totalled 365 tonnes, of which 60 per 
cent came from hospitals, the report said.

By comparison, Wuhan produced 17,000 tonnes of medical waste in the whole of 2018, according to the country’s top 
environment watchdog.

Eric Liu, a toxic waste specialist at Greenpeace’s Beijing office, said China had a huge shortage of waste disposal facilities, 
specifically those capable of handling clinical waste.

“The waste treatment capacity in China, especially in terms of medical and hazardous waste, is barely enough to cope 
with everyday needs, let alone the country’s biggest public health crisis in decades,” he said.

While the environment ministry said most medical waste was being properly dealt with in major cities, just 31 per cent 
of the country’s 629,000 tonnes of medical waste were treated in 2015, up from 24 per cent in 2008, Xinhua reported 
last year, citing an industry study.

Du Huanzheng, director of the Recycling Economy Institute at Tongji University in Shanghai, also expressed concerns 
over the widening supply-demand gap in medical waste treatment, but said a large number of new facilities were being built or planned.

“The disposal of medical waste is a major part of the battle against the outbreak, which is a wake-up call for the government 
to speed up the construction of new facilities and research into waste treatment technologies,” he said.

The coronavirus outbreak could be the catalyst for expanding the medical waste sector and lead to the building 
of more incineration facilities, the experts said.

They said combustion remained the preferred means for disposing of medical waste in China, although industrialised 
countries were phasing out incinerators due to health and environmental concerns.

Masks could be split into three categories, Liu said. While clinical waste must be disposed of at dedicated incineration
 facilities, masks used by healthy people could be tackled in a similar way as household waste, which was burnt in industrial furnaces, he said.

The real challenge came from those used by people who were placed under home quarantine or others with mild symptoms, he said.

“There is a grey area over this kind of used mask, which are not under the jurisdiction of medical institutions but should 
be treated in accordance with standards for medical waste.”

In Wuhan, authorities are scrambling to find solutions to the challenge. The environment ministry said the city’s five incinerators 
for household waste disposal and various industrial furnaces at cement and other factories had also been assigned to help clear 
the garbage backlog, which stood at about 190 tonnes as of February 24.

According to a report by China Economic Daily, Wuhan is rushing to build more medical waste treatment plants near hospitals, 
including ones near Huoshenshan, Leishenshan and Jinyintan hospitals that will treat nine, 15 and four tonnes of clinical garbage respectively on a daily basis.

A total of 17 temporary storage facilities for medical waste, with a combined capacity of more than 1,000 tonnes, have also been built.

While authorities had to transfer some of the garbage produced in Wuhan to neighbouring cities for incineration, they have also 
tried to enlist help from waste treatment companies around the country.

China Shipping Group and a company in Anhui deployed a number of mobile medical waste incineration cabins to Wuhan last month, Xinhua reported.

The incinerators, each of which is capable of processing five tonnes of waste a day, were first used in 2003 during the Sars outbreak.


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-24



Containerized Mobile Burner Medical Waste Incinerator Model CA50


HICLOVER – Containerized Mobile Incinerator Medical Waste Incinerator Model CA50


Design

CA50

Picture

Waste Therapy

Medical Waste Incineration Treatment

Feed Capacity

Typical 100 kgs per feeding

Burning Rate

Average 50 kgs per hr

Burning Time per Feed

Average 2 hr

Control Setting

PLC( Programmable Logic Controller Burner)

Voltage

220V

Power

1.0 Kw

Gas

Diesel oil

Burner

Italy Burner

Feed Mode

Guidebook

Temperature Monitor

Digital Display

Gas usage (Oil)

Ordinary 16.9 Kgs/Hour

Inner Measurements

100x80x70cm (Key Chamber)

External Dimensions

230 x 130 x 155cm (text)

Waste combustion chamber

560Liters

Message Combustion Chamber

280Liters

Oil Tank Capacity

200 Litres

Door Opening

70 x 50cm

Chimney

5.0 M

Gross Weight

4500kgs

Chamber Product

Firebrick, Refractory Concrete

Max. Warmth Value

166,000 Kcal/Hr.

Procedure Technical Specifications

Solid Chamber temperature

8000C -10000 C

Gas Chamber temperature level

10000C -12000 C

Chamber Anti-Rate

17500C

Residency time

2.0 Sec.

Burning efficiency

> 98%

Waste Lower Calorific Power

3000Kcal


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-24



Medical Waste Burner for Coronavirus Condition


Coronavirus Disease 2019 (COVID-19) pandemic continues all over the world, clinics,hospitals,goverment may need to consider on-site disposal for the infectious 

medical waste. The medical waste incinerators that has been effectively used to dispose of hazardous waste during 

viral outbreaks like Ebola. HICLOVER.COM reaches temperatures of up to 1200oC and is able to destroy health care waste 

for laboratories, small clinics, and hospitals treating patients of the Novel Coronavirus (COVID-19) such as linens, sharps, gauze, gowns, etc.

Clicky



Open chat