Tag: wasteincinerators

incinerator Model TS150


HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan.

We are china incinerator manufacturer, contractor and exporter. Manufacturer make reasonable price for incinerator customer, supply medical incinerator, hospital incinerator, animal incinerators, hog incinerators, pet cremation equipment, small incinerator, pet incinerator, animal incinerator, portable incinerator, small animal incinerator, infectious waste pyrolysis machine, laboratory incinerator. HICLOVER help customer reduce purchase budget, custom made function, quality products and friendly service.

Medical waste is posing a growing problem all over the world, jeopardizing the health of staff, patients, disposal workers and anyone else coming into contact with the often hazardous materials discarded by hospitals and other healthcare sites. Hospital waste varies from site to site and the biggest challenge is to dispose of this wide range of waste streams. Incineration is still the preferred way to process medical waste without endangering the heath patients, staff or anyone else coming into contact with them. Clinical waste is costing more and more to dispose of safely. Health Clinics and Health center can now handle their own waste streams using one of our specialist medical incinerators. Destroying hazardous waste at source is by far the most effective and efficient way of handling waste that could potentially spread diseases or viruses.

WWW.HICLOVER.COM|Waste Incinerators

WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters

Nanjing Clover Medical Technology Co.,Ltd.

Tel:  +86-25-8461 0201   
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]    


Incinerators QA


Q: what is kind of waste can use in this equipment?
A: This equipment for medical waste, pet animal, Municipal waste, live waste. Prohibit any 

explosive and radiation material, liquid waste and gas waste.

Q: The Residency time in second burning chamber

Tel: +86 -25 -8461 0201

not mean any waste material. The animal/pet combustion rate around 2/3 of average capacity.  

Clover incinerator use time per day up to 24 hours. Between each feed/combustion time, 

there are about 0.5-1 hours cooling time and time for feeding waste. Actual combustion 
time per day is around 16 hours. The lifetime of incinerator between 5-10 year according to use. 

Generally, we proposal small laboratory, small clinic use capacity under 20 kgs per hour. 

When incinerator use in hospital, please calculate the waste output capacity around 2kgs 
per people per day. If there are 200 sickbed in the hospital, that’s mean you need one 
incinerator capacity around 400kgs per day, change to capacity per hour is around 30-40 kgs 
per hour. According the operation time per day, waste material, budget, 
development, etc, you can use capacity from 30-50 kgs per hour incinerator.
*How to calculate Animal Cremation Burn Rate: 2/3 of the medical waste.

Q: Assembly and Testing
A: We supply all documents and incinerators easy to installation and operation. Customer 

can send people come to our factory to learn installation and operation. Generally, 
We do not send engineer to local site if not request. The dispatch cost is extra according to order.

Q: Combustion Temperature
A: The first combustion chamber: 800-1000 centi degree.
The second combustion chamber: 1000-1200 centi degree.

Q: Incinerator Control Mode
A: Default Control mode is common control case. PLC mode according to model and order.

Q: Operation and maintenance costs
A: Operation cost according to fuel consumption rate and power/staff, etc. 

Annual around $500-$1000usd per year maintenance according model, use situation. 

One person can service 02 unit incinerators. The staff should have basic electrician 

knowledge to operate/inspect/maintaince incinerator/burner/blower according to 
operation user guider, and know risk of medical waste to protect worker self with necessary protection element.

Q: The Residency time in secondary combustion chamber

A: 02 sec.
WWW.HICLOVER.COMWaste Incinerators Auto Roll Air Filters
Nanjing Clover Medical Technology Co.,Ltd.

Tel:  +86-25-8461 0201   

Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity(Average) 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800–1000 800–1000 800–1000 800–1000 800–1000
2nd. Chamber Temperature 1000-1200 1000-1200 1000-1200 1000-1200 1000-1200
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm


medical waste products burner


an incinerator suitable for chemcial waste containers. ability concerning 100 kgs per hr with a scrubber.1- One system of

medical waste materials incinerator
– – Ability: 100 kg–– Gas: gas oil

2 -One system of typical waste products burner – Capability: 150 kg
–– Fuel: gas oil this type of capability will be a waste burning central for a tiny city. you can locate various other

firm. our items primary for small waste output. for hospital straight, neighborhood at hospital, or portable/mobile

burner to one site when end-customer demand. incinerator without smoke and smelting for the setting.

capapcity 500kg per day. Could you define the factor of oil gas? By this you indicate gasoline or diesel?
with dieseil burner.we managed to get a walk in Algeria, and also we intend to export to other nations in Africa.
we define that we have an interest in mobile burners for medical facility usage.


an incinerator for our dental clinics


a burner for our oral clinics.The burner need to follow” Technical Standard NTON 05-015-02 Monitoring as well as Solid Waste Disposal Hazardous carbon monoxide go “, in addition to meeting worldwide requirements capability requirements for new fixed resources and discharges from the Epa United States (Epa EPA) Incinerators Medical and also Medical facility contagious waste (HMIWI its phrase in English) and also the standards of the Globe Health And Wellness Organization (THAT ).

According to direct 8.5.1.3 of the NTON 05-015-02 incinerator have to have the following:

” Incinerators outfitted with a cam primary and a secondary combustion, equipped with heaters capable of achieving full burning of waste and prevalent devastation of harmful and hazardous chemicals (dioxins and furans among others), affixed to the strong waste bioinfectious.

a) primary combustion chamber, it requires a temperature of 800 ° C as well as one hr dwell to be damaged waste produced ash as well as gas, consisting of dioxins can create cancer is discovered.

b) In the secondary combustion chamber should get to temperature levels around 1,100 º C and also have to be operated with a residence time of the flue gases of a minimum of 2 secs. To deal with gas circulation as well as entrained particles, before being launched into the atmosphere, ought to be added towers chemical washing, cyclones, filters.”

The incinerator mounted must adhere to the layout to make sure the destruction of all hazardous, biological, industrial waste and others. Combustion” PYROLYTIC” permits control of the gasification of waste and also stay clear of substantial release of black smoke as well as fine powder throughout loading. It likewise allows, complete as well as routine combustion of the waste.

The primary advantages are a controlled combustion that assures the absence of smoke, dirt, shade or smell. It is also automated, so you do not require guidance and has a low gas usage.

The incinerator consists of:

1. A combustion chamber:
a. water tight door for hands-on loading of waste.
A heater start is limited to swelling of waste.

2.
a. heater combustion, low power.
b. A shot gadget air for total re- combustion of the gases.

c. An input gadget cooling air of the combustion gases.

3.

The burner fulfills as indicated on waste incineration.
They will not burn plastics, packaging other than that the quantity so little that gases require not obtain any kind of therapy, second burning chamber to 1100C deals with every little thing.

The smokeshaft is 350 mm inner size as well as an elevation of 8.13 m will certainly with hatch evaluation.

Combustion chamber

– The burning chamber is thick steel plate (3 to 10 mm) with reinforcements, specially constructed.
– Front loading with water tight door installed on joints, locking screw wheel, adaptable gasket as well as a shielding refractory lined.
– An interior cellular lining of refractory concrete consisting of 42% of H ² 03 (alumina) as well as 100 mm thick wall surfaces.
– fibrous insulation panels made of calcium silicate with a thickness of 75mm.
– Automatic Burner (diesel or gas must be specified in the order) with flames diving in one piece monoblock with a digital ignition system, long-term ventilation control shutoff and seclusion valve.

– burning floor made in carborundum, stopping binding of glass and slag.

Afterburner gases

– The afterburner is strong sheet steel flange link.
– Interior filling up refractory concrete with really high alumina material (65 % H ² 03) as well as a thickness of 150 mm.
– thermal insulation panels made of coarse silicates and calcium with a thickness of 85 mm.
– diesel or gas burner (must be specified in the order ), monobloc straight fire, electronic ignition, risk-free, permanent air flow, control valve as well as seclusion valve.
– air injection nozzles made of refractory steel with a circulation control shutoff.
– These nozzles are particularly designed as well as patented by ATI to guarantee really low hydrocarbon discharges.
– A secondary air injection is set up and also ensures ideal oxygen web content.
– Fan distribution secondary as well as primary air, the air flow regulation is effected through shutoffs and also actuators on automated cycle commands.

Control as well as law
Control board dustproof, painted sheet with baked paint making up:
– A circuit breaker button for each electric motor (followers as well as heaters).
– A timer flexible dead time for every heater control.
– A regulatory authority with an electronic screen for the combustion temperature level.
– A controller with electronic display screen for temperature afterburner.
– The electric panel meets existing standard. For elimination of ash, a squeegee steel frying pan with deals with

Paint
– Shade: Light + dark blue.
– Unique heat.

OPERATION

The operation thereof is as follows:

– Charging waste.
– Shut the door.
– Getting the combustion cycle throughout which no surveillance solution (duration 2 hrs) is called for.

The burning cycle automatically guarantees:
– Starting the secondary air follower.

After 10 mins, the afterburner is temperature:

– Switching on the automatic heater combustion chamber, which assures the result of the gasification of waste. The operating time of the burner is programmable according to the kind of waste, utilizing an adjustable mechanical timer from 1-60 minutes.
– Automatic start of combustion air follower.

After 2 hrs, the end of” burning cycle” instantly guarantee:

– The closure of key air servomotor.
– The post-combustion heater off.

During charging, opening the door instantly makes sure immediate shutdown follower additional as well as key air. At the end of the combustion cycle the follower primary/ second air and burner remains to run for 2 hours to safeguard the burners and to cool the stove. After this time the program instantly shuts off the installment totally.

GAS USE

This installment shall consider operation of diesel with the complying with qualities:

Thickness at 15 ° C (max/ min) 0.88/ 0.82 kg/ l.
Weight sulfur 0.2 % max.
Kinematic thickness at 40 ° c (min/ max) 2/ 4.5 mm2/ s.
Point above 55C swelling.
Cold filter connecting factor -10 ° C max.

DIESEL AND FOOD TANK BURNER

The gas storage tank will lie linked to the dugout roof covering incinerator in a bund as well as have the following characteristics:

– Ability: 1,200 litres.
– Constructed from sheet steel for simple wall surface installment cubeto.
– Outcome for ventilation diameter 1 1/2 “.
– Pressure gauge and also filler cap.
– Meter and level switch

The incinerator has an usage of 16.2 liters of diesel hr to shed waste produced operation 10 hours a week anticipated in 2 burning, so that autonomy will certainly be 7.5 weeks. The tank will certainly have an electrical outlet as well as an inlet for return. Pipelines for oil will certainly drive the black steel pipeline with longitudinal electric resistance welded 3/4″ DN 20mm size. In the tank outlet pipeline retainer particles filter, with light weight aluminum body is positioned, light weight aluminum cup and also stainless steel filter with openings 100 microns in diameter.advise on the intake rates, is that for both chambers, or per chamber?


Supply, Installment and also appointing of Waste Incineration system


De manera atenta solicito me colabore con la cotizacion del incinerador incluyendo envió.Puri team a friendliness organization in Indonesia is interested to introduce renewable energy in Indonesia or to utilize the energy resources for its center around Indonesia. Kindly request to have even more info on burner innovation as it is needed to process 100 heap to 500 load waste aday. In the Structure of our Specialized Projects Monitoring, we are currently in look for distributor of Waste Incineration system for hazardous waste, the incineration system will certainly be utilized for incineration of Prohibited Drugs and toxic materials, waste poultry, Dead Animals “cows, goats”, Spoiled vegetables, Etc. at custom-mades Ports. For that we would like to request for your technological and also Financial Proposal for supply, setup and also Commissioning of Contaminated materials Incineration system with incineration capacity of at the very least 400 Kg/ human resources.

Web Page
– The main body of the burner will be stainless-steel and also the outside insulation density of not less than 7 mm made from zinc or phosphate for temperature insulation
– The major entrance of the Burner ought to be 150 mm thick as well as stamina not less than 170 kg/m3. The door should be automatic with remote to operate.
– The Incinerator ought to be developed in accordance of the environmental law adhered to in nation of origin or based on Saudi Arabian PME Rules.
– The incinerator should have fuel storage space with ability of 1000 litre.
– The burner shall have the capacity to run with temperature level approximately 1300 OC in the main chamber and also it can get rid of the residual while the incinerator functions
– The inside body of the incinerator should have insulation layer made from calcium with thickness of 50 mm while the thickness of the interior surface ought to be 100 mm in order to stand with 1300 OC.
– All the supporting dental braces of the burner shall be mounted on stainless-steel.
– The space between the outside and internal body will be loaded with the unique insulation material.
– The exhaust will not stay more than two (2) secs in the second chamber and also this chamber shall be built with high thickness of ceramic sanctuary.
– There needs to be a stack with 4 (4) meter from the leading surface area of the burner as well as can be eliminated as well as set up.
– The incinerator will have control device for exhaust gases to ensure that the emission shall fulfill the PME resource standards
– The power supply ought to be 220– 380 Volts, 60 Hz. and also the burner shall be provided with control board revealing the following:

Page|5

– Temperature level of second and key chamber.
– Condition of pressure gages.
– Alarm revealing if there is any kind of leakage or misconducting in the power.
– Sign for straining the heater.
– Timer for automatically turning off the incinerator.
– All the burner parts including fuel pumps, followers, pipelines and also shutoffs can be run in high ambient temperature level (50OC).
– All components of the burner will be repainted in one shade which ought to be resistant to high humidity, heat as well as high dust/ sandstorm.
– 3 years warranty with extra components and also technical supply and.
– ten years warranty for offering extra parts starting from the date of initial warranty expiry.

The bidder will give all essential information connected to the facility measurements, room area needed for the whole system as well as all procedure needs, Details concerning required center (wall mount) including Design, civil job and also electromechanical details including electricity, water pipes, fuel pipelines, tanks, and so on. Called for Operation staff, Fuel intake price of the entire system. Considering that our job is a turnkey task including Style, Build & & Operate of central incineration facility covering all the above mentioned information and we have to work with all civil jobs as well as essential needs to run the system.

In the Structure of our Specialized Projects Administration, we are presently in search for distributor of Waste Incineration system for dangerous waste, the incineration system will certainly be used for incineration of Prohibited Drugs as well as hazardous materials, waste fowl, Dead Animals “cows, goats”, Spoiled veggies, AND SO ON at customizeds Ports. For that we would like to demand for your economic and also technical Proposal for supply, setup and Commissioning of Hazardous Waste Incineration system with incineration capacity of at least 400 Kg/ hr. 3

The proposal should include the complete summary of the entire system: Overall expense of supply, Setup, appointing, Automatic feeding, automatic de- ashing during procedure, as well as efficient gas cleansing system (damp, high or dry temperature ceramic filters), constant discharge monitoring system (CEMS), as well as all other accessories, Control panel for all components of the system, Repairing alarm system covering all parts of the system, to alert the operator for the mistake that might develop throughout the procedure, and to do instant corrective action, Emergency Quit button that can quickly shut off/ shut down all significant component of the system in situation of emergency situation., Packing system: side loading, Number of burners: minimal 7 burners, (5 for key chamber, 2 for second chamber), Gas: Diesel, The system must function constantly for at least 12 hrs per day, The key chamber: Heavy- duty anodized Rust resistant steel casing with minimum thickness 7mm.

The bidder will provide all necessary details related to the center measurements, space area required for the entire system and also all operation needs, Information regarding needed facility (wall mount) including Layout, civil work and electromechanical information including power, water pipelines, fuel pipelines, storage tanks, and so on.

The bidder shall provide all necessary details related to the facility dimensions, space area required for the whole system and all operation requirements, Details about required facility (hanger) including Layout, civil work and electromechanical details including electricity, water pipes, fuel pipes, tanks, etc. Complete Drawing & 3D drawing Clearly Show All Sections and Details of the System. List of spare parts and checklist. Required Operation staff, Fuel consumption rate of the whole system. Since our project is a turnkey project including Design, Build & Operate of central incineration facility covering all the above mentioned details and we have to coordinate all civil works and necessary requirements to operate the system.


manufacturing facility established Diesel Fired Heater


Estimados, agradecería una cotización por los hornos crematorios para mascotas modelo YD-30/ YD-50. Mobile Diesel Fired Burner layout
provided with the adhering to requirements:
complete with constant air flow fans for removal,
producing center established inside one 20ft ISO container overall with lighting, air flow follower, fire security, 3 access to doors, and also a 1200 litre fuel tank full with a piping.
Totally containerised mobile waste monitoring solution for professional, pet dog, as well as hazardous waste applications.
Establish in Container (ISO): 20″″.
or its neighborhood equivalent model approach to create a burner plant with 3 devices of heaters at the capacity of 500kg per human resources each.
Together with various other centers like procedure office, store, area to neat waste containers and additionally 3-4 worker living quarters.
Necesito saber.
1. ficha tecnida.
2. guía mecanica.
3. elevaciones.
Los quemadores child Ecologicos.
Del YD 50 and also. YD 100 Long Life pet dog crematory.
in Diesel ……… …. Me interesa este producto Long Life Animal Crematory (YD-50), y quiero conocer más detalles sobre:.
Dame la lista de precios exactos por support.
¿ Podría enviarme la lista de precios de muestras?Raw Medical Waste Incinerators. Can you please give a major cost quote for acquisition of (2) heaters, whichever version has a comparable Capability = 30 kg/hr.

Los quemadores kid Ecologicos. Me gustaría pedir algunas muestras. ¿ Podría enviarme la lista de precios de muestras?Raw Medical Waste Incinerators. Can you please provide a main expense quote for purchase of (2) burners, whichever variation has an equivalent Capacity = 30 kg/hr.


little healthcare center waste incinetor


WASTE INCINERATOR

–          150 KG/HR

–          Compliant with EU rules, Directive 2000/76/EC

–          Fuel type: Diesel

–          Easy management and maintenance

–          Temperatures:

850 deg C for municipal waste

1000 deg C for medical waste

1100 deg C for dangerous waste containing halogenated organic substances with content of chlorine or its compounds.a incinerator with an avarage burning capacity of 20-30kgs per hour and it should diesel or used motor oil,  MEDICAL INCINERATORS, CAP: 3 TONS.producer of small hospital waste incinetor – for our clients (hospitals)


containerised Health care center waste incinerator


One 40′ ′ ′ ′ Need – – – – containerised Heater, and likewise understand you can aid us with the purchase of the same.Waste kind or application: General in addition to Medication

Capability kgs/ human resources: 75 to 350
Clinical center and also Laboratory devices.

Among our valued customer is interested to acquire a Hospital Waste heater according to adhering to specs:

Healthcare center waste heater
Capability: 50 Kg/ Hr
Brand-new overall working system
Burners: Dual discharged (Gas and also diesel).
20ft container with an incinerator plant for melting solid waste consisting of the following important things:

1. INCINERATOR.
2. SPARK ARRESTER.
3. FLUE GAS LOT/ EXHAUST PIPELINE.
4. DIESEL OIL DAYTANK 400 L WEB.
5. INCLUDED FIRE MANAGING SYSTEM.
6. CUSTOMER’S GUIDEBOOK.
7. ADDITIONAL COMPONENTS FOR 1 YEARS PROCEDURE.
medical waste incinerator is from 2.5 to 3 cubic meters as well as additionally it’s capacity is from 60 t0 100kg per hour.