Tag: waste

TECHNICAL INCINERATORS REQUIREMENTS FOR 2 health centers in Kenya



TECHNICAL INCINERATORS SPECS FOR 2 medical facilities

INTRO

  • All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal notice No. 121 of 29th September 2006
  • The capacity of the incinerator required should be to the specifications with a capacity to burn 100kgs/Hr
  • The incinerator shall be run on a 3-phase power supply (mains)
  • For the technical evaluation, not only the treatment plant but the entire system will be considered.  It will be the responsibility of the Bidder to supply a full system, including all eventually additionally necessary secondary systems and additional equipment.
  • The system offered shall be designed to operate normally under the conditions of the purchaser’s country. The conditions include Power Supply, Climate, Temperature, Humidity, etc.
  • The Bidder must provide a warranty for one year.
  • All text, parameter etc. on all control operating interfaces as well as on information displays and on print-outs shall be in English language.
  • The Bidder is responsible for all permits and approvals for importation. The Bidder shall provide all the necessary documentation in order to facilitate the legal requirements for the installation and putting into use of the equipment.
  • Period of Execution is 90 days from contract signature for delivery to site and completion of all verification operations required for the issuance of provisional acceptance.
  • Representatives of the Contracting Authority and the Beneficiary, together with the Bidder’s representative, shall carry out the controls, testing and initial approval for provisional and final acceptance as.  The provisional and final acceptance shall take place at the final destination.
  • After-Sales Service: The Bidder is required to ensure that a maintenance, service and repair centre, which is authorised by the Manufacturer, and which is able to rapidly supply genuine spare parts and consumables recommended by the Manufacturer is available throughout the one year warranty period. In fulfillment of this requirement with their offer Bidders must submit a statement signed by a representative of the manufacturer:
    • Providing the name and address of its authorised maintenance, service and repair centre,
    • Confirming that this authorised maintenance, service and repair centre is able to rapidly supply genuine spare parts and the consumables recommended by the Manufacturer; and
  • The Bidder will be responsible to deliver and install all to be supplied equipment at to be set up waste handling areas in the Republic of Kenya. The Bidder shall deliver a time schedule over the complete construction and assembling period. The delivery and installation time must be agreed between bidders, target Hospital and the Contracting Authority. The treatment plant must arrive pre-assembled. The Bidder shall ensure that all parts of the plant transported by sea shall not be shipped as “deck cargo”.
  • It is expected that the Bidder cooperates closely with the contractor for the new waste handling building/area and will make available all needed technical information, drawing, etc. to the contractor.
  • The Bidder shall supply and install the incinerator with the following attached specifications

           
TECHNICAL INCINERATORS SPECIFICATIONS FOR EAPHLNP
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerators to Nema standards        
  The following are the incinerator specifications :-        
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste        
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
  Carried Forward To Collection Page.        
 

NOTE: WE REQUIRE TWO INCINERATORS. ONE        
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

The tank requirement to be attached to the burner at a better level to make it possible for free-flow of diesel from the storage space tank to the burner.

Item 1    
C Installation & commissioning works        
D Positioning of Incinerator: –

EVALUATION STANDARD

Item 1    
E Connect burners to fuel supply. No. 2    
F Chimney Installation:        
 G Composition of the chimney: –

Analysis will certainly be performed in 4 phases particularly initial assessment of documents for uniformity with obligatory demands, technical assessment, website check out and additionally commercial exam.

100

Pass mark for technical analysis is 70/100 marks

Item. 1    
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1    
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3    

Stage 3: Internet Site Browse With

The assessment committee will certainly check out the properties of the prospective purchasers who are receptive to technical evaluation stage to validate the credibility of legal documents sent out; establish the accuracy of the information offered in the tender documents, analyze firm’s capacity, area, to call a couple of.
LOCATION V– – TIMETABLE OF STANDARD

NO

NO

1

NO

1

ITEM DESCRIPTION UNIT QTY MARKS ALLOCATED   MARKS RECEIVED  
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerator to Nema standards        
 

The following are the incinerator specifications :-        
           
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste     35  
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

Hallmark of tenderer

Item 1 20  
C Installation & commissioning works        
D Positioning of Incinerator: –

Note: In situation of variance in between system price as well as total quantity, the device price will control.

Item 1 10  
E Connect burners to fuel supply. No. 2 5  
F Chimney Installation:        
 G Composition of the chimney: –

AREA VI – – – – CONVENTIONAL FORMS

TECHNICAL INCINERATORS SPECS FOR 2 clinical centers

INTRODUCTORY

Item. 1 10  
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1 10  
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3 10  
  TOTAL      

The container need to be affixed to the incinerator at a greater level to make it possible for free-flow of diesel from the storage tank to the burner.

 

EXAM CRITERIA

Analysis will be executed in 4 stages specifically preliminary examination of files for uniformity with required demands, technical assessment, site check out as well as likewise industrial exam.

100

Pass mark for technological evaluation is 70/100 marks

Phase 3: Web Site Browse Through

The assessment board will inspect out the properties of the potential buyers that are responsive to technical analysis phase to confirm the credibility of lawful data sent out; develop the accuracy of the details provided in the tender documents, analyze company’s ability, location, to call a few.

Phase 4 Company Analysis

ITEM

Quotes that pass the above 3 (3) phases will be contrasted on the basis of prices/ cost approximated and the most affordable valued will definitely be taken into factor to consider the cheapest analyzed proposal as well as additionally consequently suggested for honor.

ITEM DESCRIPTION UNIT QTY. REQUIRED UNIT PRICE (KHS) REMARKS
1. Supply, Delivery, installation and commissioning of Incinerator in  

NO

 

1

   
2. Supply, Delivery, installation and commissioning of Incinerator  

NO

 

1

   

Trademark of tenderer

Note: In case of inconsistency in between system cost and total amount, the unit rate will dominate.

SECTION VI – – STANDARD FORMS

  1. Form of tender
  2. Contract form
  3. Confidential Questionnaire form
  4. Tender security form
  5. Performance security form
  6. Bank guarantee for advance payment
  7. Declaration form



waste burner provider in china



  1. Burning rate: 250 Kg/hr.
  2. It should be able to Operate not Less than 10 hours/day
  3. This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…
  4. Design Specification: Types A, B, C, D, and E of medical waste
  5. “PYROLYTIC” combustion, by controlling the gasification of waste.
  6. The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings.
  7. It should be able to reduce the volume of wastes by 98%.
  8. It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.

This burner with “PYROLYTIC” burning should have:

  1. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
  • The Temperatures of combustion:Minimum will be 850oC and max 1400oC
  • Post combustion: >1100o
  1. The Internal diameter of the Chimney: Ø 400mm² and its height: 8 Meter
  2. The Volume of the combustion chamber: Not Less Than 2.3 M³
  3. Burner operation should be Automatic On/Off
  4. Fuel : diesel, LPG, Natural Gas, Bio fuel
  5. The supplier must provide  necessary information for the best of  the installation

* Entirely limited door for the hand-operated loading of waste.The packing requirement to be Handbook, Set Lots,

  1. A combustion chamber of waste:

* A burner of lighting which the usage is limited to the ignition of waste.

* Make-up of the refractory;

* Burner of illumination of waste, with gas, conventional mono-bloc dispersing routing diving flame, lighting and safety of electronic ignition, permanent air flow, electromagnetic sluice entrance of standard and also isolating shutoff.

* A burner of burning of gases,

* A device of shot of air enabling a total recombustion of gases,

  • Refractory concrete :
    • . Thickness : ≥100 mm
    • . Nature: 42% of Al203
  • Insulate in fibrous panels :
    • . Thickness: ≥75 mm
  • Nature: Calcium silicate.

* A gadget of air inlet of air conditioning of waste gases,

* A sheath of emptying of the gases blistered.

  1. Load Method: Top Loading
  1. A chamber of post combustion of gases

* A burner of combustion of gases,

* A device of shot of air enabling a complete recombustion of gases,

* A gadget of air inlet of cooling of waste gases,

* A sheath of evacuation of the gases scorched.

* Carcass in solid sheet steel with support of connection.

* Composition of the refractory;

  • Refractory concrete :
    • Thickness : ≥180 mm
    • Nature: 65% of Al203
  • Insulate in fibrous panel :


burner maker in china



1. Is your house time greater than 2 secs?
2. Is the primary as well as additional air preheated?
3. Could it be given as a constant system?
4. Exists a monitoring system for functional criterion? (temperature).
5. Exists an info logging system?
6. Does it offer control treatments to change waste feed, grate rate, as well as quantity, distribution and temperature level

of primary as well as added air?
7. Does it contain complementary heaters?
8. Does it consist of system that quickly stops waste feeding when melting requirements are not proper?
9. Is it possible to have a computerized bottom ash discharging system?
1. Is the main as well as likewise additional air preheated?
2. Could it be offered as a continuous system?
3. Exists an information logging system?
4. Does it attend to control treatments to change waste feed, grate speed, in addition to volume, circulation and also temperature level

of major and also additional air?
5. Does it include supporting heating units?
6. Does it include system that promptly quits waste feeding when melting criteria are not ideal?
7. Is it possible to have an automated base ash dumping system?
Incinerator.
Rated Capacity: 100/KG/Hr.
Type of Layout: Dual Chambered.
Mode of Heating: Burner



china heater distributor and also exporter



Primary Burning Chamber
Waste Charging Door: Given with refractory cellular lining with securing gaskets
Ash Eliminated Door: Supplied with refractory cellular lining with sealing gaskets
Exterior Body MOC: Mild Steel, 5mm
Main Chamber: Stainless-steel
Running Temperature degree:800. ± 50 ◦ C.
Insulation: Insulation Block.
Burner Kind: Kanthal Al High Quality.
Power Use: 75 KW (Initial Lots ).
Electric Supply:3 Phase 440 Volt.
Control board.
MOC: Mild Steel Power Coated.
No. of Temperature: Controllers: 2 Nos.
Information: The Control Panel will certainly be offered with contract as relays, switches, indicators and more. Operative on 3 phase.
I.D.Fan.
Kind: Centrifugal Kind.
MOC: Mild Steel.
Capacity:2 HP/3Phase.
Make of Electric Motor: Kirloskar/ Havells/Crompton.
Burning Air Follower.
Type: Centrifugal Kind.
Capability: 1HP/3Phase.
Make from Electric Motor: Kirloskar/ Havells/Crompton



infectious waste pyrolysis manufacturer chinalarge family pet incinerators



Major components are– – Ethanol, Paraffin, Silicon, Aluminium chloro hydrate, Bentone, LPG

quote for burners for industrial chemical wastes therapy,

1 burning price need to be Average 30kgs/h
2 within chamber item need to be refractory concrete cement
3 it operates in three system diesel oil/ Gas or LPG
4 voltage must be 220V

5 inside temperature degree initially need to be 1000c in addition to second need to be 1200c
6 pipeline size ought to be 20 M

Our requirements are for 125 kg/hr as well as also 42 kg/hr, please send out quote with catalog for both options
We are presently handling Protection Related Tools, Building Help as well as Medical Equipment, Modular Solutions

for Hospitals, Waste Keeping Track Of System, CSSD, Medical Facility Home furnishings as well as additionally Companies. We are based in the Resources city of

Pakistan i.e. Islamabad, where there are all the head offices of Armed forces as well as Govt. establishments. We have the ability to

Participate in tenders as well as we additionally have a strong network of energetic/active dealers as well as sales personnel in Pakistan as well as

Afghanistan.
5 burner 15 kg the demands Heat heater 99% combustion performance Temperature level as much as 1200 ° C or

Smoke as well as odor free of charge Phenomenal warmth retention Electric powered Fast heatup times Temperature degree As long as 1200 ° C or as required

Capability 15 Kg Burning Effectiveness 98% Noise-.

air vent Surveillance device Air Pollution Control Tool CE and also ISO Qualified

I ‘‘ d like to ask you concerning a nuclear power plant by burning waste. We have a number of camps for displaced individuals in Syria, and we

wish to buy a plant to create electrical energy by local waste incineration Please send me an offer or any type of information.



mobile scientific waste burner manufacture organization in china



Capability: 20KG/Hr, Temp Variety: 600 Deg. C– – 1100 Deg. C

Gas Supply: Natural Gas/Diesel

Dual Burning Chamber Complete Scrubbing System (Dual

Resulting Gas Washer), Dual Blower, Chimney Elevation: 8m

Electric Supply: 220/240Volt, Single Phase

1. Kind of waste: Waste
2. Any type of sort of other type:
3. Amount of waste created daily in kg: (50 Lot per day) SOW
4. Duration– – heater will certainly be made use of each day: (Minimum 12 hrs) SOW
5. Approximate moisture material:
6. Regional heater operating in addition to exhaust standards: US-EPA
7. What is the height of the smokeshaft called for: Not recognized
8. Fuel proposed to be utilized: Deiseal Oil
9. Accessibility of power and additionally kind: 220 or 110
10. Information of space easily available: Plenty of room
11. Do you ask for a computerized loading system: [**] Yes [**] No.
12. Do you require a gas rubbing up system: [**] Yes [] No.
13. Exactly exactly how soon do you require the system to be supplied: 30.
14. Any type of sort of other particular demands:.
15. Nature: (Solid/Semi-solid/Liquid)



Hazardous Waste Incinerators



Basic Info.

Model NO.:furnace for incineration of animal waste
Export Markets:Global

Product Description

Secret Features:.
* All models with Dual combustion chamber..
* Stainless Steel chimney/stack, lengthy lifetime. * according to order.
* High temperature, lengthy lifetime of burner..
* Free or minimal setup on site..
* High melt rate, from 10kgs to 500kgs per hr, crematory manufacturers, crematory owen china, crematory.
* PLC Control Plane. * according to order.
* New Layout for family pet animal cremation business..
* One year guarantee on burner and also parts in supply.

Application Range:.
1. Medical facility& & clinic: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medication..
2. Slaughter House && Animal Hospital & Farm: Dead Pet, Bio-Waste..
3. Neighborhood & & Sea Port & Station: Municipal Strong Waste, etc..
4. Laboratories, Remote Locations, makers, custom-made animal crematorium, whirlwind incinerator, cyclonic burners, dead animal disposal equipments, up to 6ton each day. Calamity Alleviation Workflow, Pet Cremation

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm


scientific waste incinerator up for sale



Waste kind: health care waste
Waste density: 125 to 350Kg/M3
Waste calorific well worth: 4000KCAL/kg
Dampness web content: 10– – 25%. Approximated ash deposit: 5– – 10%. Nominal ability: 50kg/hr set lots.
2nd chamber: 2 [e-mail       protected] C.
Environmental: NEMA ACT (EMCA) 1999, Waste Keeping track of plans, 2006.
Trick Burning chamber:.
The major burning chamber is the significant structure of the heater, produced from moderate steel plate in addition to tensed with rolled steel areas.

It is carried from the floor covering level on a considerable steel support structure. Inside the covering is lined with calcium silicate insulation as well as likewise a warm face combination of incredibly commitment brickwork or high stamina castable.

The main burning chamber must make certain minimum separation temperature level is not much less than 850? C.
One Hand-operated Lots Burner making up:.
Hand-operated loading door.
Straight strong fireplace, refractory lined primary burning chamber. Approximate. dimensions 800x2100mm( DxL).
Total sized mass load/ash elimination door.
1 off diesel-fired ignition burner– – temperature level managed.
1 off combustion air supply follower as well as distribution system, automated control.
High capacity second burning chamber with residence time very little less than 2 secs @ >> 850? C.
1 off diesel-fired afterburner– – temperature regulated.
Control panel– – automated treatment.
Temperature indicator additional and also primary chambers 0-1200? C.
Refractory lined flanged chimney to an elevation of 10M above ground level.
NB: The extra combustion chamber must make certain that the gas temperature level as gauged versus the within wall in the 2nd chamber & & & & not in the fire area, is not less than 1100? C

Throughput: 50kg/hr at a small calorific worth of 4,000 kca/kg as well as a typical mass density of 120kg/m3 for fundamental waste in addition to 160kg/m3 for healthcare waste.
Ash: The waste will be lowered by 90 ~ 95% to leave 10-5% ash.
Quality/Environmental Criteria: NEMA ACT (EMCA) 1999, BS3316.
Running period: prepared for day-to-day operating period 8 hours.
Maximum operating period: 12 hrs.
Chamber: must be refractory lined to the list below need;.
Hearth as well as additionally lowered section of chamber wall surface surfaces.
Warm face item:.
Super obligation firebrick.
Restricting constant solution restriction 1500? C.
Thickness: 100mm.
Thermal conductivity: 1.3 W/mk.
Insulation:.
Calcium silicate.
Limiting continual solution limit 1000? C.
Density: 25mm.
Thermal conductivity: 0.095 W/mk.
Chimney/Stack: Ought to be made from refractory lined modest steel or superb high quality air-cooled s/s.
The chimney/stack should have a minimal height of 10m over ground degree.
Ignition heating units: fully packaged oil kind, overall with electrical ignition in addition to fire failing controls, wired with continuous running follower in addition to complete with all shutoffs, fan as well as electric motor.
Optimum score: a minimum of 450kW/hr.
Heater: set up on/off procedure.
Maximum consumption: at the very least 6Ltrs/hr.
Typical intake: a minimum of 3Ltrs/hr.
Afterburner:.
fully packaged oil kind, total with electric ignition as well as additionally fire stopping working controls, wired with continual running fan as well as also amount to with all valves, fan as well as additionally motor.
Optimum rating: at the very least 450kW/hr.
Heating unit: arranged for on/off treatment.
Maximum use: at the very least 9Ltrs/hr.
Common usage: at the very least 4.5 Ltrs/hr.
Flue gas therapy: should have particle eliminator (scrubbers).
Electric supply: solitary stage: 220/240VAC; 50/60Hz

Documents:.
scientific waste heater to buy Procedure manual: 2 collections.
Service/maintenance manual: 2 sets.
Certification: NEMA (or other identified) certification.
Capability to solution tools: the agent/supplier will have sufficient centers, extra parts, consumables as well as likewise certified skilled technical team.
Training: the Agent will execute a 2 days heaters training after installment and likewise selecting of the devices.

The Rep will certainly do a 2 days procedure & & & & upkeep training to the Biomedical design workers after installation & & & & appointing of the devices.



health care risk waste as well as likewise basic waste burner



We seek a lasting growth consequently we are adopting an enduring medical waste monitoring system, that includes constructing a modern long lasting incinerator that will certainly not just provide for our center yet also for the numerous other centers in the larger place of the location. Waste kind: health care danger waste and standard waste
5. Chimney:
Smokeshaft: 3.5 mm light steel
Altitude from base:11 m and additionally if there are structures within
30m of the heater, smokeshaft needs to extend at least 3m
above the pinnacles of all the roofing of such buildings
Size of smokeshaft at leading:430 mm.
Weight of pile: ± 500 Kg.
Instance and pile be repainted with 400 ⁰ C warmth immune Black paint.
6. Heating systems:.
First chamber 850 ⁰ C—- 900 ⁰ C.
second chamber 1000 ⁰ C.
7. Variable rate burning air blowers.
8. Main chamber amount ± 1.05 cubic metres.
9. Mixing chamber amount ± 0.30 cubic metres.
10. Dealing with chamber quantity ± 0.89 cubic metres.
11. Weight excluding smokeshaft ± 6.400 Kg at manufacture.
12. Shooting tools provided: Hoe, texas hold’em in addition to rake.
13. Dimensions.
Dimension ± 2125mm.
Size ± 1890mm.
Elevation ± 2125mm.
Additional dimension for burners ± 1000mm.
14. Packing door opening 610 * 540mm.
15. Fireplace area ± 1.19 square metres.
16. Summary of grate/hearth: A total hearth to be supplied to prevent contaminated.
17. Fluids from streaming right into ash pit without being blazed.
18. Conformity with South African Atmospheric Contamination Avoidance Act No. 45 of.
1965 or equal air contamination criteria.
19. Documents to be provided: Treatments and likewise maintenance manual along with demand.
running treatments (SOPs).
20. Exhaust controls:.
warmed refractory screen.
Reduced rate grit clearing up chamber.
Stainless-steel arrester display

21. Refractory product: alumina content> > > > 49% as well as density common 102mm.
22. : to be corrected 2-3 days.
23. Products of structures.
Case:5 mm moderate steel.
Sustaining: heavy angle and likewise network.
Hearth: 1550 ⁰ C.
Ashing door: high quality cast iron.
Packing door 5mm modest steel lined with 1550 ⁰ C castable fundamental purpose high strength, high abrasion resistant monolithic refractory concrete.
Burner wall surface surfaces in addition to roof covering: 1550 ⁰ C castable monolithic refractory