Tag: incinerators

health care facility for melting contaminated materials along with chimicals



use in the health center for melting contaminated materials as well as chimicals, marginal Capacity 300 per hr. I will be marketing to my client?. Below is the information I was provided as well as definitely nothing else. The healthcare facility burner for usage in the professional waste as required by worldwide ecological administration. Minimum 300 Kg capacity/hr, Gas released, refractory lined, smokeshaft along with tasting prot. Minimum temperature level of 1100 level Celsiu.the incinerator tool for shed 500kg per hr. work concerning shed clinical waste of the hospitals.Just want to price of you different kinds of Medical Trash Incinerators.need all info on 300 kg per hr system. availability. practical expenses making use of diesel (numerous other). the waste is Human Cells. And also we have 10 kg each day; we require burner for scientific waste.Burn Capacity: 50kgs per hr (Ordinary capacity according to Medical Waste). please forward information regarding prices on each of you pet crematory models.Regarding Gas Incinerator, Please note that Fuel for the Incinerator
will be Gas. As gas is contribute our country.



china medical burner



the complying with containerized burners. (Kitchen location as well as accommodations and grey water and black water plant eliminating waste) we need burner is each function various are done in one heater we require notified.
WASTE HEATERS SUGGESTIONS

china clinical burner Capability
? Disposal of both non-hazardous as well as infected products streams (per waste inventory).
?
Design/Specifications.
? Incinerators must have an added burning chamber with a minimum temperature selection of 900c.
? Liquid waste streams shall be blazed by a correct liquid shot system.
? The heaters will definitely be mounted with aesthetic alarm systems to indicate procedures of reduced temperature level in the secondary chamber.
Running Atmosphere as well as likewise Ambient Troubles

The Incinerators plan shall be developed to operate under the list below problems:.
? Ordinary Daily Max/Min June Temperature Level Level, 21-39 ° C.? Ordinary Daily Max/Min January Temperature Level Level, 2-12 ° C.
Medical waste heater,.
approx. 0.4 cubic metres,.
gas/ keys power operated,.
thermostatic temperature degree control,.
programmable cycle



clinical heater key combustion price



Our normal activities produces 2-5 lots of different waste items daily which vary from condemned carcasses, and also medical burner primary combustion price

other wastes all which need to be blazed at above 800Centigrade gauged flue exhaust gas.To be made use of by small

health care centers as well as facilities to securely take treatment of contagious as well as pathological wastes. 50kg/Hour – – – –

Burners to be really trustworthy, gas efficient with high/ decreased capacity melt prices
Modern Technology:

Temperature Level Controlled Heating System. Heavy-duty real estate, to be a quality, sturdy, reliable, budget friendly Medical Waste

Burner with appropriate control, very easy to run as well as likewise self-supporting.
Equipments to be pre-assembled, pre-piped, pre-wired & & & & assessed prior to Transport/ Export.

Within the framework of a ecological and also clinical equipment & & & & modern technology consultation and joint purchasing, this

Purchase Bureau invites candidates for pre-qualification in the objective of primarily selecting competent companies to bid

for the above tender.
The supply will make up the unique devices for reliable waste management as mentioned over for a brand-new individual

environment contract administration business with prepared procedures 2013 in Indonesia in addition to Thailand, as well as 2014 in West & & & & East

Malaysia to accomplish those expert solutions in order to comply with the federal governments safety and protection disposal needs

for medical as well as medical facility, specialist waste in the area and also to fulfill the greater technical criterion in this particular

field.small incinerators with filter (with the really the very least minimum pollution) for burning/combusting 5kg/hr, 10kg/hr, 15 kg/hr,

20kg/hr, 25kg/hr to 50kg/hr as well as also 300kg/hr of SOLID ALL-NATURAL DRY AND DAMP NON-HAZARDUOUS of any type of kind (including health care center

wastes) everyday or per hr. Needs to it be without any smoke, no fumes, no smell (odor), no dust, no emission of solid

bits and with the extremely least minimal contamination (within nationwide in addition to worldwide requirements). Required to be eco

healthy and also balanced along with acceptable with worldwide requirements. Need to not be with water scrubbers. Ash materials after melting

must be 3-4%.

Our normal activities creates 2-5 loads of different waste items daily which vary from condemned carcasses, as well as likewise medical burner major combustion rate



medical incinerators



* scientific burners, The insulation of the burning chamber require to be made up of refractory bricks, having a.
high web content of aluminium and likewise protects bricks in order to make sure a minimum temperature level on.
the outdoors sheet metal.
* Structure of the refractory;

? Refractory concrete:.
?. Density: ≥ 100 mm.
?. Nature: 42% of Al203.
? Safeguard in coarse panels:.
?. Thickness: ≥ 75 mm.
? Nature: Calcium silicate.
* Heating unit of lighting of waste, with gas, typical mono-bloc casting leading diving fire, lights and also security of electronic ignition, long-term ventilation, electromagnetic sluice entrance of regulation as well as also separating valve.
* Plate of burning in Carborundum, preventing the taking care of glass and slags.

18. A chamber of message combustion of gases.
* A heater of burning of gases,.
* A device of shot of air permitting a total recombustion of gases,.
* A gadget of air inlet of cooling of waste gases,.
* A sheath of emptying of the gases burnt.
* Carcass in strong sheet steel with assistance of web link.
* Structure of the refractory;.
? Refractory concrete:.
? Density: ≥ 150 mm.
?
* Framework of the refractory;



Wastes That Can be Melted or Blazed



waste itself, running problems in the shed chamber (i.e. temperature degree, holding time as well as likewise disturbance) and also

motorist capability. Waste having chlorinated materials (i.e. chlorinated

solvents and plastics, PVC piping, lumber treated with pentachlorophenol or PCB-amended paint, aquatic driftwood)

should be divided from different other waste as their burning will absolutely result in the de novo advancement as well as exhaust of numerous

dioxin as well as furan substances. Various other waste that requires to not be lost unless utilizing particularly created

incinerators consist of made usage of lubricating oil, hydrocarbon contaminated soil, biomedical waste, sewer sludge or any kind of kind of

other waste especially restricted by the Department of Environment.

solvents and plastics, PVC piping, timber treated with pentachlorophenol or PCB-amended paint, marine driftwood)

must be separated from various other waste as their burning will certainly result in the de novo development as well as exhaust of various

dioxin and furan compounds. Waste including mercury (i.e. batteries, thermostats as well as fluorescent light bulbs) as well as

various other hefty metals (i.e. lead acid batteries, timber treated with lead paint) should not be burned as the mercury

as well as heavy steels will not be ruined. Other waste that needs to not be shed unless using specially developed

incinerators consist of made use of lubricating oil, hydrocarbon contaminated soil, biomedical waste, sewer sludge or any kind of

other waste specifically prohibited by the Division of Environment.

Table 2 supplies a listing of typical wastes that can be shed and those that call for special factor to consider and

therapy. Note that open burning and incineration are recognized as separate columns in the table which

various restrictions apply relying on which approach is used. In general, much more restrictions relate to the

different techniques of open burning because of the incomplete combustion achieved. Fewer restrictions put on

incineration as a result of the operator’s capability to control the burning procedure.

Non-combustible products such as steel and also glass do not burn as well as will certainly rob warmth away from waste that can be

ruined by burning. Flammable waste needs to always be separated from non-combustible waste prior to being filled

into the melt chamber.



mobile burner



  1. Petrol: diesel
  1. Consumption: 8-10liter/hour
  1. Capacity: to cremate (carrion and spoils) 350-400kg/hour
  1. Temperature: 900-1350?C
  1. Operation temperature: -30~40?C
  1. Incinerator weight: 1800-2000 kg
  1. Volume: 0.70-0.80m/cube
  1. Exterior dimension: 1.4-1.6*1.0-1.15m (L*W)

A heater stands for a complete service to the problem of disposal of all clinical facility waste kinds. The fluid fuel

is diesel. The burner ought to meet the setup requirements. Expected Technical specifications

The burner will be totally self included. incinerators that are stainless

steel with destruction rate of 15kg per hr. bactch lots of 10-15kg of

waste in addition to average temperature degree of 8500 degress c.



TECHNICAL INCINERATORS REQUIREMENTS FOR 2 health centers in Kenya



TECHNICAL INCINERATORS SPECS FOR 2 medical facilities

INTRO

  • All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal notice No. 121 of 29th September 2006
  • The capacity of the incinerator required should be to the specifications with a capacity to burn 100kgs/Hr
  • The incinerator shall be run on a 3-phase power supply (mains)
  • For the technical evaluation, not only the treatment plant but the entire system will be considered.  It will be the responsibility of the Bidder to supply a full system, including all eventually additionally necessary secondary systems and additional equipment.
  • The system offered shall be designed to operate normally under the conditions of the purchaser’s country. The conditions include Power Supply, Climate, Temperature, Humidity, etc.
  • The Bidder must provide a warranty for one year.
  • All text, parameter etc. on all control operating interfaces as well as on information displays and on print-outs shall be in English language.
  • The Bidder is responsible for all permits and approvals for importation. The Bidder shall provide all the necessary documentation in order to facilitate the legal requirements for the installation and putting into use of the equipment.
  • Period of Execution is 90 days from contract signature for delivery to site and completion of all verification operations required for the issuance of provisional acceptance.
  • Representatives of the Contracting Authority and the Beneficiary, together with the Bidder’s representative, shall carry out the controls, testing and initial approval for provisional and final acceptance as.  The provisional and final acceptance shall take place at the final destination.
  • After-Sales Service: The Bidder is required to ensure that a maintenance, service and repair centre, which is authorised by the Manufacturer, and which is able to rapidly supply genuine spare parts and consumables recommended by the Manufacturer is available throughout the one year warranty period. In fulfillment of this requirement with their offer Bidders must submit a statement signed by a representative of the manufacturer:
    • Providing the name and address of its authorised maintenance, service and repair centre,
    • Confirming that this authorised maintenance, service and repair centre is able to rapidly supply genuine spare parts and the consumables recommended by the Manufacturer; and
  • The Bidder will be responsible to deliver and install all to be supplied equipment at to be set up waste handling areas in the Republic of Kenya. The Bidder shall deliver a time schedule over the complete construction and assembling period. The delivery and installation time must be agreed between bidders, target Hospital and the Contracting Authority. The treatment plant must arrive pre-assembled. The Bidder shall ensure that all parts of the plant transported by sea shall not be shipped as “deck cargo”.
  • It is expected that the Bidder cooperates closely with the contractor for the new waste handling building/area and will make available all needed technical information, drawing, etc. to the contractor.
  • The Bidder shall supply and install the incinerator with the following attached specifications

           
TECHNICAL INCINERATORS SPECIFICATIONS FOR EAPHLNP
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerators to Nema standards        
  The following are the incinerator specifications :-        
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste        
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
  Carried Forward To Collection Page.        
 

NOTE: WE REQUIRE TWO INCINERATORS. ONE        
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

The tank requirement to be attached to the burner at a better level to make it possible for free-flow of diesel from the storage space tank to the burner.

Item 1    
C Installation & commissioning works        
D Positioning of Incinerator: –

EVALUATION STANDARD

Item 1    
E Connect burners to fuel supply. No. 2    
F Chimney Installation:        
 G Composition of the chimney: –

Analysis will certainly be performed in 4 phases particularly initial assessment of documents for uniformity with obligatory demands, technical assessment, website check out and additionally commercial exam.

100

Pass mark for technical analysis is 70/100 marks

Item. 1    
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1    
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3    

Stage 3: Internet Site Browse With

The assessment committee will certainly check out the properties of the prospective purchasers who are receptive to technical evaluation stage to validate the credibility of legal documents sent out; establish the accuracy of the information offered in the tender documents, analyze firm’s capacity, area, to call a couple of.
LOCATION V– – TIMETABLE OF STANDARD

NO

NO

1

NO

1

ITEM DESCRIPTION UNIT QTY MARKS ALLOCATED   MARKS RECEIVED  
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerator to Nema standards        
 

The following are the incinerator specifications :-        
           
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste     35  
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

Hallmark of tenderer

Item 1 20  
C Installation & commissioning works        
D Positioning of Incinerator: –

Note: In situation of variance in between system price as well as total quantity, the device price will control.

Item 1 10  
E Connect burners to fuel supply. No. 2 5  
F Chimney Installation:        
 G Composition of the chimney: –

AREA VI – – – – CONVENTIONAL FORMS

TECHNICAL INCINERATORS SPECS FOR 2 clinical centers

INTRODUCTORY

Item. 1 10  
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1 10  
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3 10  
  TOTAL      

The container need to be affixed to the incinerator at a greater level to make it possible for free-flow of diesel from the storage tank to the burner.

 

EXAM CRITERIA

Analysis will be executed in 4 stages specifically preliminary examination of files for uniformity with required demands, technical assessment, site check out as well as likewise industrial exam.

100

Pass mark for technological evaluation is 70/100 marks

Phase 3: Web Site Browse Through

The assessment board will inspect out the properties of the potential buyers that are responsive to technical analysis phase to confirm the credibility of lawful data sent out; develop the accuracy of the details provided in the tender documents, analyze company’s ability, location, to call a few.

Phase 4 Company Analysis

ITEM

Quotes that pass the above 3 (3) phases will be contrasted on the basis of prices/ cost approximated and the most affordable valued will definitely be taken into factor to consider the cheapest analyzed proposal as well as additionally consequently suggested for honor.

ITEM DESCRIPTION UNIT QTY. REQUIRED UNIT PRICE (KHS) REMARKS
1. Supply, Delivery, installation and commissioning of Incinerator in  

NO

 

1

   
2. Supply, Delivery, installation and commissioning of Incinerator  

NO

 

1

   

Trademark of tenderer

Note: In case of inconsistency in between system cost and total amount, the unit rate will dominate.

SECTION VI – – STANDARD FORMS

  1. Form of tender
  2. Contract form
  3. Confidential Questionnaire form
  4. Tender security form
  5. Performance security form
  6. Bank guarantee for advance payment
  7. Declaration form



infectious waste pyrolysis manufacturer chinalarge family pet incinerators



Major components are– – Ethanol, Paraffin, Silicon, Aluminium chloro hydrate, Bentone, LPG

quote for burners for industrial chemical wastes therapy,

1 burning price need to be Average 30kgs/h
2 within chamber item need to be refractory concrete cement
3 it operates in three system diesel oil/ Gas or LPG
4 voltage must be 220V

5 inside temperature degree initially need to be 1000c in addition to second need to be 1200c
6 pipeline size ought to be 20 M

Our requirements are for 125 kg/hr as well as also 42 kg/hr, please send out quote with catalog for both options
We are presently handling Protection Related Tools, Building Help as well as Medical Equipment, Modular Solutions

for Hospitals, Waste Keeping Track Of System, CSSD, Medical Facility Home furnishings as well as additionally Companies. We are based in the Resources city of

Pakistan i.e. Islamabad, where there are all the head offices of Armed forces as well as Govt. establishments. We have the ability to

Participate in tenders as well as we additionally have a strong network of energetic/active dealers as well as sales personnel in Pakistan as well as

Afghanistan.
5 burner 15 kg the demands Heat heater 99% combustion performance Temperature level as much as 1200 ° C or

Smoke as well as odor free of charge Phenomenal warmth retention Electric powered Fast heatup times Temperature degree As long as 1200 ° C or as required

Capability 15 Kg Burning Effectiveness 98% Noise-.

air vent Surveillance device Air Pollution Control Tool CE and also ISO Qualified

I ‘‘ d like to ask you concerning a nuclear power plant by burning waste. We have a number of camps for displaced individuals in Syria, and we

wish to buy a plant to create electrical energy by local waste incineration Please send me an offer or any type of information.



Hazardous Waste Incinerators



Basic Info.

Model NO.:furnace for incineration of animal waste
Export Markets:Global

Product Description

Secret Features:.
* All models with Dual combustion chamber..
* Stainless Steel chimney/stack, lengthy lifetime. * according to order.
* High temperature, lengthy lifetime of burner..
* Free or minimal setup on site..
* High melt rate, from 10kgs to 500kgs per hr, crematory manufacturers, crematory owen china, crematory.
* PLC Control Plane. * according to order.
* New Layout for family pet animal cremation business..
* One year guarantee on burner and also parts in supply.

Application Range:.
1. Medical facility& & clinic: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medication..
2. Slaughter House && Animal Hospital & Farm: Dead Pet, Bio-Waste..
3. Neighborhood & & Sea Port & Station: Municipal Strong Waste, etc..
4. Laboratories, Remote Locations, makers, custom-made animal crematorium, whirlwind incinerator, cyclonic burners, dead animal disposal equipments, up to 6ton each day. Calamity Alleviation Workflow, Pet Cremation

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm


Simply just how you can find practical incinerators for your regional site?



The heater with dual/double combustion chamber as well as completely dry filter chamber, two gas burner from

Italy created, hot sale version for little range waste result, the ability is 30kgs per hr

as well as likewise 50kgs per human resources.

Heater is not a cost-effective gadgets, generally the tiny range version’s cost around $5,000 usd per device

We are famous small scale incinerator manufacturer and brand, dispatch incinerator products 
and best services with lower price for customer all around the world.

as well as massive range version’s price even more than $50,000 usd each. Before purchase one system burner,

you have to make clear adhering to products:

A, burn what?

you have to make clear adhering to products:

A, burn what? Incinerator is a incineration tools, function is fire waste. What kind of

waste you want to treatment?

B, tiny or huge? This according to the waste result each day or the waste volume per

feed time, like animal dimension.

C, fuel? Incinerator use oil or gas fuel, usually, gas fuel is cheaper than oil and the smoke

cleaner than oil gas version. Some neighborhood website do not have gas supply system.

As well as other technology items, like power( 220v, 380v), waste feed door kind, burner framework, etc.

WWW.HICLOVER.COMWaste Incinerators Auto Roll Air Filters
Nanjing Clover Medical Technology Co.,Ltd.

Tel: +86 -25 -8461 0201

Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity(Average) 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800–1000 800–1000 800–1000 800–1000 800–1000
2nd. Chamber Temperature 1000-1200 1000-1200 1000-1200 1000-1200 1000-1200
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm