Tag: incinerator

medical incinerators



* scientific burners, The insulation of the burning chamber require to be made up of refractory bricks, having a.
high web content of aluminium and likewise protects bricks in order to make sure a minimum temperature level on.
the outdoors sheet metal.
* Structure of the refractory;

? Refractory concrete:.
?. Density: ≥ 100 mm.
?. Nature: 42% of Al203.
? Safeguard in coarse panels:.
?. Thickness: ≥ 75 mm.
? Nature: Calcium silicate.
* Heating unit of lighting of waste, with gas, typical mono-bloc casting leading diving fire, lights and also security of electronic ignition, long-term ventilation, electromagnetic sluice entrance of regulation as well as also separating valve.
* Plate of burning in Carborundum, preventing the taking care of glass and slags.

18. A chamber of message combustion of gases.
* A heater of burning of gases,.
* A device of shot of air permitting a total recombustion of gases,.
* A gadget of air inlet of cooling of waste gases,.
* A sheath of emptying of the gases burnt.
* Carcass in strong sheet steel with assistance of web link.
* Structure of the refractory;.
? Refractory concrete:.
? Density: ≥ 150 mm.
?
* Framework of the refractory;



healthcare facility incinerator



* Burner with gas, mono-bloc spreading helping kind with straight fire, lights as well as safety and safety of digital ignition, long-term ventilation, electro-magnetic sluice gate of plan and dividing shutoff.
* An additional shot of air to ensure excellent oxygen material.
19. A control box guaranteeing the overall cycle of burning.

20. Fan:
* Electro-ventilator dispersing the second air, the regulation of the air flow being completed by shutoffs and sticking to the control of the automated cycle.
21. Controls as well as plans:
Control box watertight to dust, containing:

* A switch breaker for each and every engine (ventilators and additionally heating units).
* A timer with adjustable temporization for the law of each heater.
* A regulatory authority with watch for the temperature level of burning.
* A regulative authority with watch for the temperature level of postcombustion.
* Electric box.

21. The de- ashing has to be performed in the bottom of the burning chamber or the deashing requirement to be Automatic or manual collection de ashing.
22. Improve Filtering system: Scruber to be mentionned as optional
23. Exhaust Standards Conformity: BS 3316 or équivalent requirement
23. Capability to deal with Plastic: Very little less than 40% by weight
24. CE Production Conformity: BS EN 746-2-1997
22. The provider needs to provide collections of additional parts of very first severity as well as consumable of the incinerator.
23. The established heater should birth a one year guarantee.
24. The representative will perforn an onsite installment of the heater.
25. The technical training of motorists will certainly need to be provided and likewise provided by an expert from
the production facility; it will include also preventative and medical upkeep, as well as making use of equipment, etc

NB.: Civil jobs as well as any kind of kind of various other related services for the configuration as well as likewise training of drivers need to be included in the burner’s price.
Spec for the shelter of the burner: Residence of the burner extensive in deal (your residence have to have centers for hand cleansing and likewise firefighting).
This product as well as also tools have to include in the shed of the heater: foundation in debris rock, privacy roofing versus humudity; altitude with block of 20 cm (bloc concrete), continuing lintel (linteau) in boosted concrete; steel framework (charpente en steel); roofing covering in sheet B.C.A. 28 BG (Toiture en t?le), steel rain gutter, hygienic setup (laundry container, soakway pit of 20 m of deepness); ash pit of 30 m3, electrical configuration; concrete piece for handling the heater; chanel for discharge of rain water or drainage, cord mesh for oygenation up the lintel; smooth rougtcasting of walls (inside as well as outdoors); plinth with cement; 2 steel doors; email paints inside as well as likewise latex paints outside your residence on wall surfaces and also on doors; roofing restriction (planche de rive); steps for this specification will absolutely depend upon the measurement of the burner which will identify the dimension of the shed of the incinerator., etc



Wastes That Can be Melted or Blazed



waste itself, running problems in the shed chamber (i.e. temperature degree, holding time as well as likewise disturbance) and also

motorist capability. Waste having chlorinated materials (i.e. chlorinated

solvents and plastics, PVC piping, lumber treated with pentachlorophenol or PCB-amended paint, aquatic driftwood)

should be divided from different other waste as their burning will absolutely result in the de novo advancement as well as exhaust of numerous

dioxin as well as furan substances. Various other waste that requires to not be lost unless utilizing particularly created

incinerators consist of made usage of lubricating oil, hydrocarbon contaminated soil, biomedical waste, sewer sludge or any kind of kind of

other waste especially restricted by the Department of Environment.

solvents and plastics, PVC piping, timber treated with pentachlorophenol or PCB-amended paint, marine driftwood)

must be separated from various other waste as their burning will certainly result in the de novo development as well as exhaust of various

dioxin and furan compounds. Waste including mercury (i.e. batteries, thermostats as well as fluorescent light bulbs) as well as

various other hefty metals (i.e. lead acid batteries, timber treated with lead paint) should not be burned as the mercury

as well as heavy steels will not be ruined. Other waste that needs to not be shed unless using specially developed

incinerators consist of made use of lubricating oil, hydrocarbon contaminated soil, biomedical waste, sewer sludge or any kind of

other waste specifically prohibited by the Division of Environment.

Table 2 supplies a listing of typical wastes that can be shed and those that call for special factor to consider and

therapy. Note that open burning and incineration are recognized as separate columns in the table which

various restrictions apply relying on which approach is used. In general, much more restrictions relate to the

different techniques of open burning because of the incomplete combustion achieved. Fewer restrictions put on

incineration as a result of the operator’s capability to control the burning procedure.

Non-combustible products such as steel and also glass do not burn as well as will certainly rob warmth away from waste that can be

ruined by burning. Flammable waste needs to always be separated from non-combustible waste prior to being filled

into the melt chamber.



mobile burner



  1. Petrol: diesel
  1. Consumption: 8-10liter/hour
  1. Capacity: to cremate (carrion and spoils) 350-400kg/hour
  1. Temperature: 900-1350?C
  1. Operation temperature: -30~40?C
  1. Incinerator weight: 1800-2000 kg
  1. Volume: 0.70-0.80m/cube
  1. Exterior dimension: 1.4-1.6*1.0-1.15m (L*W)

A heater stands for a complete service to the problem of disposal of all clinical facility waste kinds. The fluid fuel

is diesel. The burner ought to meet the setup requirements. Expected Technical specifications

The burner will be totally self included. incinerators that are stainless

steel with destruction rate of 15kg per hr. bactch lots of 10-15kg of

waste in addition to average temperature degree of 8500 degress c.



animal burner



The incinerator plant shall include a control board for its treatment. On the control panel we will have an aesthetic

display of the chamber temperature level levels. This aesthetic screen needs to maintain an eye and handle on the burner in addition to his performance.

Capacity of destruction in weight will be 60 Kg/h.

It need to be able to operate very little less than 10 hours/day

This burner need to have the capability to wreck all flammable wastes created by healthcare centers, personal facilities, lab,

institutes, and so forth.

Design Spec: Types A, B, C, D, in addition to E of medical waste

Supply, setup & & & & screening DUCTED SPLIT SYSTEMS at waste store with sufficient capability to keep the internal

temperature at 14 degrees Celsius in summer season periods in addition to cold weather



burner distributor



“PYROLYTIC” burning, by managing the gasification of waste

The incinerator producer need to remain clear of the launch of black smoke along with excellent dirt, during the loadings.

It will certainly be able to lower the quantity of wastes by 98%.

It shall have the capability to hold discharge in the second shed with gas home of not much less than 2 secs.

The incineration should be completely without obvious smoke as well as offending smells.

1.0 The primary ignition burner will supplying ignition of the waste to 850 ° C in addition to need to switch off to preserve gas.

The vital burning chamber will be created from hefty steel plate and also the system is inside lined with a

total layer of hote face high as well as refractory efficiency insulation.

The Inside diameter of the Smokeshaft a minimum of:? 400 and also its altitude: 8 m



00 BEDS HEALTHCARE CENTER INCENERATOR TECHNICAL INFORMATIONS



1) Policy

– – – – Incinerator:

It is developed to sanitize medical waste, lower its amount, and make its parts unrecognizable all in one completely confined as well as automated system.

2) Waste Disposal Plan

  1. a)Classification

The contaminated waste is filled up right into the leading stainless-steel chamber where a tough shredder reduces the waste into little items.

Infections Waste Specially-controlled waste Organ, needle, etc.
Industrial waste Rubber gloves, etc.
General waste Gauze, etc.
General Waste Plastic, Rubber Infusion bottle, etc.
Paper, wood, Vinyl Voucher, etc.
Metal, Glass Can, Glass bottle
  1. b) Infections Waste Disposal

Treatment cycle:

1- Filling up; the contaminated waste is automatically -loaded right into the chamber of the system

2-Shredding; the resilient shredder decreased the product right into little items as well as likewise includes an unique transforming about system to stay clear of obstructing

3-Heat; saturated pressurized hefty steam raises the temperature to 134 C and also the stress to 3 bar

4-Sterilization; the sanitation gets in straight phone call with the shredding material (134 c, 3 bar) for 20 minutes

5-Cooling; temperature degree is lowered to 80 C by splashing amazing water onto Double coat of the treatment vessel, concurrently, the unit returns to ambient pressure

6-Draining; the hefty vapor is compressed to water and also released with the cooling water to the hygienic sewer system

7-vacuum; the remaining recurring steam is vented out with an air pump

8-Unloading; an electronic signal informs the driver that all safe operating problems have been satisfied

The issue unlocks the gadget as well as also allows gravity unloading of the treated waste right into a container

Coach Spec

General Characteristics

8log 10

– – – – Incinerator:

It is established to sterilize professional waste, reduce its quantity, and also make its components indistinguishable all in one completely enclosed as well as automated system.

The infected waste is filled up right into the top stainless-steel chamber where a durable shredder lowers the waste into tiny products.

Therapy cycle:

1- Filling up; the contaminated waste is immediately -loaded into the chamber of the system

2-Shredding; the long lasting shredder decreased the item right into small pieces and likewise consists of an unique transforming about system to avoid obstructing

3-Heat; saturated pressurized heavy vapor increases the temperature to 134 C and the stress to 3 bar

4-Sterilization; the sterilization gets in straight call with the shredding material (134 c, 3 bar) for 20 mins

Operational temp. max 160 C
Max Weight when filld with waste For a special hydraulic test. Kg 10500
Stress. Kg/ cm3 3.5
Steam Pressure. Bar 8
Max Steam Flow Kg/h 500
Compressed Air Bar 6
Electricity 380 V/3 – phase Surge Protection system 35KW
Operating Characteristics
Average Cycle Time. minutes 60
Process Wight Capacity . Kg 500 – 600
Density. Kg/m3 100
Average process wight capacity Kg./cycle microbial inactivation 200-300

5-Cooling; temperature level is decreased to 80 C by spraying awesome water onto Dual coat of the therapy vessel, concurrently, the unit returns to ambient pressure

Waste volume reductin 80%
Consumption / Cycle
Steam. Kg 40
Electricity . KW/h 9
Water Liters 500


TECHNICAL INCINERATORS REQUIREMENTS FOR 2 health centers in Kenya



TECHNICAL INCINERATORS SPECS FOR 2 medical facilities

INTRO

  • All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal notice No. 121 of 29th September 2006
  • The capacity of the incinerator required should be to the specifications with a capacity to burn 100kgs/Hr
  • The incinerator shall be run on a 3-phase power supply (mains)
  • For the technical evaluation, not only the treatment plant but the entire system will be considered.  It will be the responsibility of the Bidder to supply a full system, including all eventually additionally necessary secondary systems and additional equipment.
  • The system offered shall be designed to operate normally under the conditions of the purchaser’s country. The conditions include Power Supply, Climate, Temperature, Humidity, etc.
  • The Bidder must provide a warranty for one year.
  • All text, parameter etc. on all control operating interfaces as well as on information displays and on print-outs shall be in English language.
  • The Bidder is responsible for all permits and approvals for importation. The Bidder shall provide all the necessary documentation in order to facilitate the legal requirements for the installation and putting into use of the equipment.
  • Period of Execution is 90 days from contract signature for delivery to site and completion of all verification operations required for the issuance of provisional acceptance.
  • Representatives of the Contracting Authority and the Beneficiary, together with the Bidder’s representative, shall carry out the controls, testing and initial approval for provisional and final acceptance as.  The provisional and final acceptance shall take place at the final destination.
  • After-Sales Service: The Bidder is required to ensure that a maintenance, service and repair centre, which is authorised by the Manufacturer, and which is able to rapidly supply genuine spare parts and consumables recommended by the Manufacturer is available throughout the one year warranty period. In fulfillment of this requirement with their offer Bidders must submit a statement signed by a representative of the manufacturer:
    • Providing the name and address of its authorised maintenance, service and repair centre,
    • Confirming that this authorised maintenance, service and repair centre is able to rapidly supply genuine spare parts and the consumables recommended by the Manufacturer; and
  • The Bidder will be responsible to deliver and install all to be supplied equipment at to be set up waste handling areas in the Republic of Kenya. The Bidder shall deliver a time schedule over the complete construction and assembling period. The delivery and installation time must be agreed between bidders, target Hospital and the Contracting Authority. The treatment plant must arrive pre-assembled. The Bidder shall ensure that all parts of the plant transported by sea shall not be shipped as “deck cargo”.
  • It is expected that the Bidder cooperates closely with the contractor for the new waste handling building/area and will make available all needed technical information, drawing, etc. to the contractor.
  • The Bidder shall supply and install the incinerator with the following attached specifications

           
TECHNICAL INCINERATORS SPECIFICATIONS FOR EAPHLNP
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerators to Nema standards        
  The following are the incinerator specifications :-        
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste        
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
  Carried Forward To Collection Page.        
 

NOTE: WE REQUIRE TWO INCINERATORS. ONE        
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

The tank requirement to be attached to the burner at a better level to make it possible for free-flow of diesel from the storage space tank to the burner.

Item 1    
C Installation & commissioning works        
D Positioning of Incinerator: –

EVALUATION STANDARD

Item 1    
E Connect burners to fuel supply. No. 2    
F Chimney Installation:        
 G Composition of the chimney: –

Analysis will certainly be performed in 4 phases particularly initial assessment of documents for uniformity with obligatory demands, technical assessment, website check out and additionally commercial exam.

100

Pass mark for technical analysis is 70/100 marks

Item. 1    
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1    
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3    

Stage 3: Internet Site Browse With

The assessment committee will certainly check out the properties of the prospective purchasers who are receptive to technical evaluation stage to validate the credibility of legal documents sent out; establish the accuracy of the information offered in the tender documents, analyze firm’s capacity, area, to call a couple of.
LOCATION V– – TIMETABLE OF STANDARD

NO

NO

1

NO

1

ITEM DESCRIPTION UNIT QTY MARKS ALLOCATED   MARKS RECEIVED  
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerator to Nema standards        
 

The following are the incinerator specifications :-        
           
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste     35  
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

Hallmark of tenderer

Item 1 20  
C Installation & commissioning works        
D Positioning of Incinerator: –

Note: In situation of variance in between system price as well as total quantity, the device price will control.

Item 1 10  
E Connect burners to fuel supply. No. 2 5  
F Chimney Installation:        
 G Composition of the chimney: –

AREA VI – – – – CONVENTIONAL FORMS

TECHNICAL INCINERATORS SPECS FOR 2 clinical centers

INTRODUCTORY

Item. 1 10  
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1 10  
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3 10  
  TOTAL      

The container need to be affixed to the incinerator at a greater level to make it possible for free-flow of diesel from the storage tank to the burner.

 

EXAM CRITERIA

Analysis will be executed in 4 stages specifically preliminary examination of files for uniformity with required demands, technical assessment, site check out as well as likewise industrial exam.

100

Pass mark for technological evaluation is 70/100 marks

Phase 3: Web Site Browse Through

The assessment board will inspect out the properties of the potential buyers that are responsive to technical analysis phase to confirm the credibility of lawful data sent out; develop the accuracy of the details provided in the tender documents, analyze company’s ability, location, to call a few.

Phase 4 Company Analysis

ITEM

Quotes that pass the above 3 (3) phases will be contrasted on the basis of prices/ cost approximated and the most affordable valued will definitely be taken into factor to consider the cheapest analyzed proposal as well as additionally consequently suggested for honor.

ITEM DESCRIPTION UNIT QTY. REQUIRED UNIT PRICE (KHS) REMARKS
1. Supply, Delivery, installation and commissioning of Incinerator in  

NO

 

1

   
2. Supply, Delivery, installation and commissioning of Incinerator  

NO

 

1

   

Trademark of tenderer

Note: In case of inconsistency in between system cost and total amount, the unit rate will dominate.

SECTION VI – – STANDARD FORMS

  1. Form of tender
  2. Contract form
  3. Confidential Questionnaire form
  4. Tender security form
  5. Performance security form
  6. Bank guarantee for advance payment
  7. Declaration form



waste burner provider in china



  1. Burning rate: 250 Kg/hr.
  2. It should be able to Operate not Less than 10 hours/day
  3. This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…
  4. Design Specification: Types A, B, C, D, and E of medical waste
  5. “PYROLYTIC” combustion, by controlling the gasification of waste.
  6. The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings.
  7. It should be able to reduce the volume of wastes by 98%.
  8. It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.

This burner with “PYROLYTIC” burning should have:

  1. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
  • The Temperatures of combustion:Minimum will be 850oC and max 1400oC
  • Post combustion: >1100o
  1. The Internal diameter of the Chimney: Ø 400mm² and its height: 8 Meter
  2. The Volume of the combustion chamber: Not Less Than 2.3 M³
  3. Burner operation should be Automatic On/Off
  4. Fuel : diesel, LPG, Natural Gas, Bio fuel
  5. The supplier must provide  necessary information for the best of  the installation

* Entirely limited door for the hand-operated loading of waste.The packing requirement to be Handbook, Set Lots,

  1. A combustion chamber of waste:

* A burner of lighting which the usage is limited to the ignition of waste.

* Make-up of the refractory;

* Burner of illumination of waste, with gas, conventional mono-bloc dispersing routing diving flame, lighting and safety of electronic ignition, permanent air flow, electromagnetic sluice entrance of standard and also isolating shutoff.

* A burner of burning of gases,

* A device of shot of air enabling a total recombustion of gases,

  • Refractory concrete :
    • . Thickness : ≥100 mm
    • . Nature: 42% of Al203
  • Insulate in fibrous panels :
    • . Thickness: ≥75 mm
  • Nature: Calcium silicate.

* A gadget of air inlet of air conditioning of waste gases,

* A sheath of emptying of the gases blistered.

  1. Load Method: Top Loading
  1. A chamber of post combustion of gases

* A burner of combustion of gases,

* A device of shot of air enabling a complete recombustion of gases,

* A gadget of air inlet of cooling of waste gases,

* A sheath of evacuation of the gases scorched.

* Carcass in solid sheet steel with support of connection.

* Composition of the refractory;

  • Refractory concrete :
    • Thickness : ≥180 mm
    • Nature: 65% of Al203
  • Insulate in fibrous panel :


burner maker in china



1. Is your house time greater than 2 secs?
2. Is the primary as well as additional air preheated?
3. Could it be given as a constant system?
4. Exists a monitoring system for functional criterion? (temperature).
5. Exists an info logging system?
6. Does it offer control treatments to change waste feed, grate rate, as well as quantity, distribution and temperature level

of primary as well as added air?
7. Does it contain complementary heaters?
8. Does it consist of system that quickly stops waste feeding when melting requirements are not proper?
9. Is it possible to have a computerized bottom ash discharging system?
1. Is the main as well as likewise additional air preheated?
2. Could it be offered as a continuous system?
3. Exists an information logging system?
4. Does it attend to control treatments to change waste feed, grate speed, in addition to volume, circulation and also temperature level

of major and also additional air?
5. Does it include supporting heating units?
6. Does it include system that promptly quits waste feeding when melting criteria are not ideal?
7. Is it possible to have an automated base ash dumping system?
Incinerator.
Rated Capacity: 100/KG/Hr.
Type of Layout: Dual Chambered.
Mode of Heating: Burner