Incinerator Testing Fire”
Incinerator testing fire in factory. The secondary chamber burn first and now what you see is primary chamber. This model is TS50.
Incinerator testing fire in factory. The secondary chamber burn first and now what you see is primary chamber. This model is TS50.
Waste Incinerator Operation Room, inside with waste incinerator and if necessary, there will be a waste storage room beside.
| Items/Model | TS30(PLC) | TS50(PLC) |
| Burn Rate | 30 kg/hour | 50 kg/hour |
| Feed Capacity | 60kg | 100kg |
| Control Mode | PLC | PLC |
| Combustion Chamber | 330L | 560L |
| Internal Dimensions | 75x75x60cm | 100x80x70cm |
| Secondary Chamber | 180L | 280L |
| Smoke Filter Chamber | Yes | Yes |
| Feed Mode | Manual | Manual |
| Voltage | 220V | 220V |
| Power | 0.5Kw | 0.7Kw |
| Oil Consumption (kg/hour) | 10.2–20 | 12.1–24 |
| Gas Consumption (m3/hour) | 9.8–20 | 9.9–26.1 |
| Temperature Monitor | Yes | Yes |
| Temperature Protection | Yes | Yes |
| Oil Tank | 100L | 100L |
| Feed Door | 55x50cm | 70x55cm |
| Chimney | 5Meter | 5Meter |
| Chimney Type | Stainless Steel | Stainless Steel |
| 1st. Chamber Temperature | 800℃–1000℃ | 800℃–1000℃ |
| 2nd. Chamber Temperature | 1000℃-1200℃ | 1000℃-1200℃ |
| Residency Time | 2.0 Sec. | 2.0 Sec. |
| Gross Weight | 3000kg | 4500kg |
| External Dimensions | 175x120x140cm | 230x130x155cm |
Containerized Incinerator with ISO Container|Mobile Incinerator|Whole Building Dispatch|Up to 100kgs per hour Capacity
Medical Waste Incinerator
| Items/Model | TS100(PLC) |
| Burn Rate | Average 100 kg/hour |
| Feed Capacity | Average 200 kg/feed |
| Control Mode | PLC |
| Combustion Chamber | 1200L |
| Internal Dimensions | 120x100x100cm |
| Secondary Chamber | 600L |
| Smoke Filter Chamber | Yes |
| Feed Mode | Manual |
| Voltage | 220V |
| Power | 0.7Kw |
| Oil Consumption (kg/hour) | 14–28 |
| Gas Consumption (m3/hour) | 10–32.2 |
| Temperature Monitor | Yes |
| Temperature Protection | Yes |
| Oil Tank | 200L |
| Feed Door | 80x60cm |
| Chimney | 10Meter |
| Chimney Type | Stainless Steel |
| 1st. Chamber Temperature | 800℃–1000℃ |
| 2nd. Chamber Temperature | 1000℃-1200℃ |
| Residency Time | 2.0 Sec. |
| Gross Weight | 6000kg |
| External Dimensions | 260x150x180cm |
Download Product PDF Format Catalogue:
Nanjing Clover Medical Technology Co., Ltd. is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. to 500kgs/Hr., up to 6ton per day. Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world.
Key Features:
* All models with Dual combustion chamber.
* Stainless Steel chimney/stack, long lifetime. *according to order
* High temperature, long lifetime of incinerator.
* Free or minimum installation on site.
* High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day.
* PLC Control Plane.*according to order
* New Design for pet animal cremation business.
* One year warranty on incinerator and parts in stock.
Application Scope:
1. Hospital& clinic: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine.
2. Slaughter House &Pet Hospital &Farm: Dead Animal, Bio-Waste.
3. Community & Sea Port & Station: Municipal Solid Waste, etc.
4. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation
university hospital waste administration group at a tertiary care health center,1250 beeded hsopital.
our everyday waste developed from all sources is 0.55 kg/bed/day =685kg/day
we require an incinerator of 150kg/hour filling up capacity.
plz reply with, acquiring, installment, running along with upkeep cost.incinerators, particularly, clinical was heaters
The specification of the Heater is as detailed below:
Needs of Heater
1. Need to have prep work, Incineration, Scrubber actions to thaw waste totally as well as likewise waste gas need to be non-polluted
2. Ash must be just 5% of the waste material
5.
our day-to-day waste created from all resources is 0.55 kg/bed/day =685kg/day
we need a burner of 150kg/hour filling up ability. The specification of the Heater is as listed below:
Requirements of Burner
1. Should have preparation, Incineration, Scrubber actions to thaw waste completely and additionally waste gas require to be non-polluted
2.
9. 1 year service warranty
10. ISO Licensed
11. Mobile Burner
12. Electric
The Professional will supply a Cremation System bundle for 2 (02) Cremators as well as system licensed by associated authority, which need to fit the alloted area as shown on the strategy drawings.
As a result of the monetary condition in Bulgaria presently, our researches programs that a 100kg/hour system can fit the demands established in the task.
Please, offer us an Incinerator system that can match the criteria specified over.
Our company think that our technology will certainly create a large requirement for this kind of incinerator as well as would certainly additionally make a great company chance for a company, such as Clover, that is able as well as eager to manufacture and additionally offer them.
2. All architectural, constructing as well as architectural job that includes yet not limited to building as well as building of all improved concrete work, smokeshaft, structural steel job as well as all structure work for all needed needs, control and functional panel system for proper verdict as well as successful treatment of the syste.
The heater is required to run 24/7 frequently so it needs to be able to be cleaned up whilst still running. The waste products being lost will have non combustible products and these will certainly need to be cleaned of the heater. We would definitely like this cleaning to be as basic as viable. The same puts on the loading of rubbish right into the heater, which we would like to have the capability to be done instantly when possible.
3. All mechanical as well as also eletrical jobs that includes yet limited to supply, deliver in addition to setup of all shutoffs, penstock, displays, pumps, float swithces, versatile adapter, anxiety pipe features, blower, hot dipped galvanized lifting davits, air diffusers, warm dipped galvanised handrailings, cozy dipped galvanized gratings, switch boards, cabling as well as additionally electrical wirings, illumination, earthing, metering, lighting protection, flow dimension in addition to flow recorders, screening & & & & comissioning and all necessary for correct final thought and also efficient operational of the system
OVERALL GOT TO COLLECTION
Layout as well as Develop approved gas cremation system.
( Cont would absolutely)
4. The Company will provide as well as entirely abide by all needs by the linked authority throughout style stage, design authorization, evaluation in addition to after analysis, turning over of the system plan whether it is plainly revealed or otherwise yet taken into consideration required for reliable conclusion along with satisfaction to the authority. The Service provider needs to confess his tender price all indirect as well as straight price at no additional price to the Customer for all such conformities.7. Sort of waste: Bio-medical/ Damaging/ Area/ Trash = ALL and Mixed
8. Any numerous other: Rubber, rubber tires, Batteries, green waste, paper as well as cardboard
9. Amount of waste generated every day in kg: 3 -5 tonnes daily
Do you need an automated loading system? Do you call for a gas scrubbing up system? Just exactly how promptly do you call for the system to be provided?
20. City in addition to country of usage: Australia.
Solid as well as likewise ignitable waste items call for to be with the capability of being recovered from the incinerator swiftly making use of an automatic treatment. This is since the incinerator will certainly be called for to operate 24/7. One initial burner is needed for an evidence of suggestion task as well as also future orders for the reliable vendor, following efficient implementation of this project, are likely to be considerable.
5.
6. For maintenance as well as remedies during Trouble Obligation Period, react duration to any kind of complaint for the Service provider to get involved in shall be within 24hours
8.
The Specialist will provide a Cremation System bundle for TWO (02) Cremators and also system authorized by associated authority, which require to suit the alloted location as shown on the approach illustrations.
The hourly-generated waste has to do with 100kg per hr, nonetheless with 1000kg daily amount.
As a result of the financial situation in Bulgaria presently, our researches programs that a 100kg/hour system can fit the requirements established in the job.
Please, supply us a Burner system that can match the criteria specified above. All likewise eletrical as well as mechanical jobs which includes yet restricted to provide, supply as well as installation of all valves, penstock, screens, pumps, float swithces, adaptable adapter, anxiety pipe features, blower, hot dipped galvanized lifting davits, air diffusers, warm dipped galvanised handrailings, cozy dipped galvanized gratings, switch boards, cabling and likewise circuitries, lighting, earthing, metering, lighting protection, flow measurement as well as blood circulation recorders, testing & & & & comissioning and also all necessary for correct conclusion and efficient operational of the system
OVERALL GOT TO COLLECTION
Design as well as Establish accepted gas cremation system.
– – Solitary refactory lined chimney for 2 cremators
– – Flue Gas Tasting Platform
– – Electrical circuitry within the system needs
– – Raking Tools
– – Ashbox
– – Authorization from DOE/ Regional Authority
– – Any other scope/works required for the systems