Tag: incinerator

Hot sale small waste incinerators 30kgs and 50kgs per hour”

ts30

Items/Model TS30(PLC) TS50(PLC)
Burn Rate 30 kg/hour 50 kg/hour
Feed Capacity 60kg 100kg
Control Mode PLC PLC
Combustion Chamber 330L 560L
Internal Dimensions 75x75x60cm 100x80x70cm
Secondary Chamber 180L 280L
Smoke Filter Chamber Yes Yes
Feed Mode Manual Manual
Voltage 220V 220V
Power 0.5Kw 0.7Kw
Oil Consumption (kg/hour) 10.2–20 12.1–24
Gas Consumption (m3/hour) 9.8–20 9.9–26.1
Temperature Monitor Yes Yes
Temperature Protection Yes Yes
Oil Tank 100L 100L
Feed Door 55x50cm 70x55cm
Chimney 5Meter 5Meter
Chimney Type Stainless Steel Stainless Steel
1st. Chamber Temperature 800℃–1000℃ 800℃–1000℃
2nd. Chamber Temperature 1000℃-1200℃ 1000℃-1200℃
Residency Time 2.0 Sec. 2.0 Sec.
Gross Weight 3000kg 4500kg
External Dimensions 175x120x140cm 230x130x155cm

Oil fired incinerator,Medical Waste Incinerator”

Medical Waste Incinerator

 

Items/Model TS100(PLC)
Burn Rate Average 100 kg/hour
Feed Capacity Average 200 kg/feed
Control Mode PLC
Combustion Chamber 1200L
Internal Dimensions 120x100x100cm
Secondary Chamber 600L
Smoke Filter Chamber Yes
Feed Mode Manual
Voltage 220V
Power 0.7Kw
Oil Consumption (kg/hour) 14–28
Gas Consumption (m3/hour) 10–32.2
Temperature Monitor Yes
Temperature Protection Yes
Oil Tank 200L
Feed Door 80x60cm
Chimney 10Meter
Chimney Type Stainless Steel
1st. Chamber Temperature 800℃–1000℃
2nd. Chamber Temperature 1000℃-1200℃
Residency Time 2.0 Sec.
Gross Weight 6000kg
External Dimensions 260x150x180cm

incinerator, medical incinerator, small incinerator,waste incinerators”

Nanjing Clover Medical Technology Co., Ltd.  is a leading waste incinerator manufacturer in China. We are local  manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. to 500kgs/Hr., up to 6ton per day. Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world.

Key Features:
* All models with Dual combustion chamber.
* Stainless Steel chimney/stack, long lifetime. *according to order
* High temperature, long lifetime of incinerator.
* Free or minimum installation on site.
* High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day.
* PLC Control Plane.*according to order
* New Design for pet animal cremation business.
* One year warranty on incinerator and parts in stock.

Application Scope:
1. Hospital& clinic: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine.
2. Slaughter House &Pet Hospital &Farm: Dead Animal, Bio-Waste.
3. Community & Sea Port & Station: Municipal Solid Waste, etc.
4. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation

medical was incinerators Department of Wellness



university hospital waste administration group at a tertiary care health center,1250 beeded hsopital.

our everyday waste developed from all sources is 0.55 kg/bed/day =685kg/day

we require an incinerator of 150kg/hour filling up capacity.

plz reply with, acquiring, installment, running along with upkeep cost.incinerators, particularly, clinical was heaters
The specification of the Heater is as detailed below:

Needs of Heater

1. Need to have prep work, Incineration, Scrubber actions to thaw waste totally as well as likewise waste gas need to be non-polluted

2. Ash must be just 5% of the waste material

5.

our day-to-day waste created from all resources is 0.55 kg/bed/day =685kg/day

we need a burner of 150kg/hour filling up ability. The specification of the Heater is as listed below:

Requirements of Burner

1. Should have preparation, Incineration, Scrubber actions to thaw waste completely and additionally waste gas require to be non-polluted

2.

9. 1 year service warranty

10. ISO Licensed

11. Mobile Burner

12. Electric



Strong Waste Incinerators



The Professional will supply a Cremation System bundle for 2 (02) Cremators as well as system licensed by associated authority, which need to fit the alloted area as shown on the strategy drawings.

As a result of the monetary condition in Bulgaria presently, our researches programs that a 100kg/hour system can fit the demands established in the task.

Please, offer us an Incinerator system that can match the criteria specified over.
Our company think that our technology will certainly create a large requirement for this kind of incinerator as well as would certainly additionally make a great company chance for a company, such as Clover, that is able as well as eager to manufacture and additionally offer them.

2. All architectural, constructing as well as architectural job that includes yet not limited to building as well as building of all improved concrete work, smokeshaft, structural steel job as well as all structure work for all needed needs, control and functional panel system for proper verdict as well as successful treatment of the syste.
The heater is required to run 24/7 frequently so it needs to be able to be cleaned up whilst still running. The waste products being lost will have non combustible products and these will certainly need to be cleaned of the heater. We would definitely like this cleaning to be as basic as viable. The same puts on the loading of rubbish right into the heater, which we would like to have the capability to be done instantly when possible.

3. All mechanical as well as also eletrical jobs that includes yet limited to supply, deliver in addition to setup of all shutoffs, penstock, displays, pumps, float swithces, versatile adapter, anxiety pipe features, blower, hot dipped galvanized lifting davits, air diffusers, warm dipped galvanised handrailings, cozy dipped galvanized gratings, switch boards, cabling as well as additionally electrical wirings, illumination, earthing, metering, lighting protection, flow dimension in addition to flow recorders, screening & & & & comissioning and all necessary for correct final thought and also efficient operational of the system

OVERALL GOT TO COLLECTION

Layout as well as Develop approved gas cremation system.
( Cont would absolutely)

4. The Company will provide as well as entirely abide by all needs by the linked authority throughout style stage, design authorization, evaluation in addition to after analysis, turning over of the system plan whether it is plainly revealed or otherwise yet taken into consideration required for reliable conclusion along with satisfaction to the authority. The Service provider needs to confess his tender price all indirect as well as straight price at no additional price to the Customer for all such conformities.7. Sort of waste: Bio-medical/ Damaging/ Area/ Trash = ALL and Mixed
8. Any numerous other: Rubber, rubber tires, Batteries, green waste, paper as well as cardboard
9. Amount of waste generated every day in kg: 3 -5 tonnes daily
Do you need an automated loading system? Do you call for a gas scrubbing up system? Just exactly how promptly do you call for the system to be provided?
20. City in addition to country of usage: Australia.
Solid as well as likewise ignitable waste items call for to be with the capability of being recovered from the incinerator swiftly making use of an automatic treatment. This is since the incinerator will certainly be called for to operate 24/7. One initial burner is needed for an evidence of suggestion task as well as also future orders for the reliable vendor, following efficient implementation of this project, are likely to be considerable.

5.

6. For maintenance as well as remedies during Trouble Obligation Period, react duration to any kind of complaint for the Service provider to get involved in shall be within 24hours

8.

The Specialist will provide a Cremation System bundle for TWO (02) Cremators and also system authorized by associated authority, which require to suit the alloted location as shown on the approach illustrations.

The hourly-generated waste has to do with 100kg per hr, nonetheless with 1000kg daily amount.

As a result of the financial situation in Bulgaria presently, our researches programs that a 100kg/hour system can fit the requirements established in the job.

Please, supply us a Burner system that can match the criteria specified above. All likewise eletrical as well as mechanical jobs which includes yet restricted to provide, supply as well as installation of all valves, penstock, screens, pumps, float swithces, adaptable adapter, anxiety pipe features, blower, hot dipped galvanized lifting davits, air diffusers, warm dipped galvanised handrailings, cozy dipped galvanized gratings, switch boards, cabling and likewise circuitries, lighting, earthing, metering, lighting protection, flow measurement as well as blood circulation recorders, testing & & & & comissioning and also all necessary for correct conclusion and efficient operational of the system

OVERALL GOT TO COLLECTION

Design as well as Establish accepted gas cremation system.

– – Solitary refactory lined chimney for 2 cremators

– – Flue Gas Tasting Platform

– – Electrical circuitry within the system needs

– – Raking Tools

– – Ashbox

– – Authorization from DOE/ Regional Authority

– – Any other scope/works required for the systems