Tag: incinerator

Medical Waste Incinerator for covid19 waste 100-150-300-500kgs per hour



Phone: +86-13813931455(whatsapp/wechat)
Website: http://www.hiclover.com/ 

Nanjing Clover Medical Technology Co.,Ltd.

● Double Combustion Chambers
All waste incinerator design with double combustion chamber. High Temperature, Smoke Treatment,No black smoke, Environmentally friendly. 
● Containerized Mobile Incinerators
The incinerator mounted in ISO Container before leave factory, free-installation, no incineration house build construction,movable by truck. 
● Family Pets Dog&Cat Cremation
Special design with movable platform, combustion chamber material and custom made for pets crematory business. 
● Installation and Commissioning
Clover’s engineers install,train for most of the region and free-cost train in our factory. 


Items/Model

TS100(PLC)

TS150(PLC)

TS300(PLC)

TS500(PLC)

Burn Speed (Typical )

100 kg/hour

150 kg/hour

300 kg/hour

500 kg/hour

Control Mode

PLC Auto.

PLC Auto.

PLC Auto.

PLC Auto.

Combustion Chamber

1200L

1500L

2000L

3000L

Internal Dimensions

120x100x100cm

150x100x100cm

170x120x100cm

210x120x120cm

Secondary Chamber

600L

750L

1000L

1500L

Smoke Filter Chamber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Feed Mode

Manual

Manual

Manual

Manual

Voltage

220V

220V

220V

220V

Electricity

1.38Kw

1.69Kw

2.57Kw

4.88Kw

Diesel Oil Consumption (kg/hour)

Ave.20.4

Ave.24.2

Ave.33

Ave.44

Natural Gas Consumption (m3n/hour)

Ave.24.5

Ave.29

Ave.39.6

Ave.52.8

Infection Monitor

Yes

Yes

Yes

Yes

Temperature Protection

Yes

Yes

Yes

Yes

Oil Tank

200L

300L

500L

500L

Optional Optional Optional Optional

Smoke Wet Scrubbers

Chimney

10Meter

10Meter

14Meter

14Meter

Chimney Sort

Stainless Steel

Stainless Steel

Stainless Steel

Stainless Steel

1st. Chamber Temperature

800℃–1000℃

800℃–1000℃

800℃–1000℃

800℃–1000℃

2nd. Chamber Temperature

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

Residency Time

2.0 Sec.

2.0 Sec.

2.0 Sec.

2.0 Sec.

Gross Weight

6000kg

8500kg

11000kg

16000kg

External Dimensions

260x150x180cm

300x160x190cm

400x210x300cm


hospital incinerator ash
HICLOVER Solution for Fighting COVID-19, Medical Waste Incinerator

450x210x300cm

 



Medical Waste Incineration Model TS20(PLC) Wet Scrubber (Water Spary tower)



Phone: +86-13813931455(whatsapp/wechat)
Website: http://www.hiclover.com/ 

Nanjing Clover Medical Technology Co.,Ltd.

Items/Model

TS20(PLC)

Picture

 

Principle

Medical Waste Incineration 

Burn Rate

Average 20 kg/hour

Feed Capacity

Average 40kg/feeding

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

210L

Internal Dimensions

65x65x50cm

Secondary Chamber

110L

Smoke Filter

Wet Scrubber (Water Spary tower)

Feed Mode

Manual

Voltage

380V

Power

5Kw

Oil Infection (kg/hour)

7.8–16.3

Gas Consumption (m3/hour)

8–15.7

Infection Monitor

Digital Screen

Temperature Protection

Yes

Oil Tank

100L

Feed Door

45x40cm

Chimney

5Meter

Chimney Sort

Stainless Steel

1st.

800℃–1000℃

2nd. Chamber Temperature

1000℃-1200℃

Residency Time

2.0 Sec.

Gross Weight

4000kg

External Dimensions





HICLOVER Solution for Fighting COVID-19, Medical Waste Incinerator

160x110x130cm(Incinerator)

 



the animal crematory equipment function like other incinerators, but there are also some difference, some key point is door opening(we can feed the pet), oil or gas operation cost, moveable feeding door, smoke enviromental friendly, if we can collect ash, easy to use it, good service from pet incinerator manufacturer,etc.

Items/Model A360 A600 A900 A1200
Burning Rate *animal 20 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 60 kgs/Hr.
Feed Capacity *animal 30 kgs 50 kgs 80 kgs 100 kgs
Equipment Weight 2300 kgs 3000 kgs 4000 kgs 4300 kgs
Primary Chamber (Liters) 360 600 900 1200
Secondary Chamber (Liters) 200 200 300 500
External Dimensions (cm) 145x90x175 175 x 100 x 180 200x160x230 220x180x360
Internal Dimensions (cm) 100x60x60 130 x 70 x 65 120x90x85 130x100x90
Oil Tank(Liters) 200 200 300 300
Door Opening (cm) 48 x 60 50 x 60 62 x 80 55 x 80
Chimney (M) 5 5 5 10
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chmaber Temperature 800℃–1000℃ 800℃–1000℃ 800℃–1000℃ 800℃–1000℃
2nd. Chmaber Temperature 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃

Integrated Solid Waste Management System medical waste incinerator



Phone: +86-13813931455(whatsapp/wechat)
Website: http://www.hiclover.com/ 

Nanjing Clover Medical Technology Co.,Ltd.


Ability: Typical 300 kgs per hour

Model

YD–300

Picture

 

Burning Rate

Typical 300 kgs/hour

Feed Capacity

Average 500 kgs/feeding

Primary Combustion Chamber

2400 Liters

Secondary Combustion Chamber

1200 Liters

Mix Combustion Chamber

Yes

Smoke Filter Chamber

Wet Scrubber System(3 Part Form )

Feed Mode

Manual

Voltage

380V

Power

12.0 Kw

Gas Form

Diesel Oil/ Organic Gas/LPG

Burner

Italy Original

Oil Consumption (Diesel Oil)

Typical 33kg/hour

Gas Consumption (Natural Gas)

***

Internal Dimensions

220 x 110 x 100cm (primary Room )

External Dimensions

260 x 220 x 420cm (without chimney/wet scrubber)

Temperature Monitor

Yes

Oil Tank Capacity(if Petroleum fuel)

500 Liters

Door Opening

90 x 110cm

Chimney Length

10.0 Meters

Chimney Sort

Stainless Steel

Equipment Gross Weight

14000 kgs

Operation Technical Specifications

Primary Chamber Temperature

800℃–1000℃

Secondary Chamber Temperature

1000℃-1200℃

Residency Time

2.0 Sec.

Burning Efficiency

>98%

Waste Lower Calorific Power



3000Kcal

HICLOVER Solution for Fighting COVID-19, Medical Waste Incinerator

Pathological waste: organs, cells, surgical specimens, physiological fluids removed during surgery or autopsy. 

 



NCV Incinerator NGV Incinerator

What is incineration and why it is useful?
Incineration is also called as combustion. … Important use of incineration is that it reduces volume of 
waste by 20-30% of original volume. This process is also known as thermal treatment where solid waste materials are 
converted by Incinerators into heat, gas, steam and ash.
Do all hospitals have incinerators?
Two common methods of disposing of hospital-generated medical waste include incineration or autoclaving. Incineration is a process that burns medical 
waste in a controlled environment. Some hospitals have on-site incineration technology and equipment available. 
How do hospitals dispose of placentas?
Hospitals treat placentas as medical waste or biohazard material. The newborn placenta is placed in a 
biohazard bag for storage. … Once the hospital is done with the placenta, it is put on a truck with all the 
other medical waste accumulated at the hospital for proper disposal


 

incineration of sewage sludge
possible solution to get rid of medical waste in oman
irradiation of medical waste
incinerator repair and service
household waste incinerators in india
explanation on incineration in health centre
ensnertor technician

 
Nanjing Clover Medical Technology Co.,Ltd.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Burn Rate (Average) 10-20 kg/hour 20-30 kg/hour 30-50 kg/hour 50-100 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.75Kw 0.83Kw 0.99Kw 1.2Kw
Diesel Oil Consumption (kg/hour) Ave.8.4 Ave.10.9 Ave.13.3 Ave.16.9
Natural Gas Consumption (m3n/hour) Ave.10.1 Ave.13 Ave.16 Ave.20.2
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Items/Model TS100(PLC) TS150(PLC) TS300(PLC) TS500(PLC)
Burn Rate (Average) 100-150 kg/hour 150-200 kg/hour 300-400 kg/hour 500-600 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 1200L 1500L 2000L 3000L
Internal Dimensions 120x100x100cm 150x100x100cm 170x120x100cm 210x120x120cm
Secondary Chamber 600L 750L 1000L 1500L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 1.38Kw 1.69Kw 2.57Kw 4.88Kw
Diesel Oil Consumption (kg/hour) Ave.20.4 Ave.24.2 Ave.33 Ave.44
Natural Gas Consumption (m3n/hour) Ave.24.5 Ave.29 Ave.39.6 Ave.52.8
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes

The Contractor shall deploy an expert incinerator operator, fully equipped with all required tools and equipment, to support the client in un-packing, installation, and commissioning of the different sizes of incinerator units. 
The operator will be provided on a day-rate reimbursable basis. The bidder must specify the minimum scope of work in terms of operator working days and travel days. 
Rates for these to be provided on the financial offer form.
All associated fittings and connections to enable full functionality shall be completed by the bidder in line with the manufacturer’s 
instructions; including but not limited to piping, electrical and stack connections, foundations, anchorage to foundations, etc., as applicable
“Handover of the unit
The Contractor shall hand over ownership and control of each size of unit to the client after the first 5 days of supervised operation. 
The handover process shall include a detailed inspection and completion of a checklist and statement of operability.
“Decommissioning, overhaul and repacking of the unit
Based upon a potential need for an incinerator unit to be moved to a new location the contractor will outline the key steps through a 
clear written procedure and direct demonstration by the contracted operator for the decommissioning and repacking of the units, so this can be achieved.

 

HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification.
Medical Waste Incinerator & Auto Roll Air Filter(Air Purification)

 
Mobile: +86-138139 31455(WhatsApp)

Website: www.hiclover.com 
Email:     [email protected]       
Email:    [email protected]    

What are the objectives of incineration?

What are the objectives of incineration?
Incineration plants produce heat and power from waste, reduce waste disposal to landfills, and discharge 
harmful emissions and bottom ash. The objective of the incineration plant is to maximize desirable outputs 
(heat and power) and minimize undesirable outputs (emissions and bottom ash).
 
What is incinerators used in hospitals?
Medical incinerators are designed safely to dispose of harmful materials at high temperatures. The process 
ensures no harmful gases are released into the environment. Medical waste incinerators have scrubbers to 
clean the polluted gases and other particulate matter.
Which is better landfill or incineration?
Its director Jacob Hayler told us: “It is better to recover energy from non-recyclable waste through (incineration), than send it to landfill.” … Mr Hayler says that overall greenhouse 
gas emissions from incineration are lower than from landfill.
How does incineration affect our environment?
Pollutants emitted by incinerators that appear to have the potential to cause the largest health effects are 
particulate matter, lead, mercury, and dioxins and furans. However, there is wide variation in the contributions 
that incinerators can make to environmental concentrations of those contaminants.


 

 

 
Nanjing Clover Medical Technology Co.,Ltd.
temperature required for body parts incineration
incinerator for clinical
methods of waste management
haat incinerator india
contact number for hazardous waste management companies in kumasi
https www pvc org en p pvc incineration dioxins
disposal of clinical waste
Suitably designed pollution control devices such as scrubbers, filters or electrostatic precipitators, shall be 
installed/retrofitted with the incinerator to achieve emission limits.”
“Each unit shall include a complete vertical exhaust and stack system, including the following features:
• Steel construction.
• Refractory lining in the lower section.
• The exit height of the stack shall be not less than a range of 3-12 metres above ground level depending on 
the capacity of the incinerator unit. 
• The diameter of the stack shall be selected by the Contractor to deliver an exhaust exit velocity of not less 
than 10 metres per second vertically upwards when at full scale operation.
• An emission stack sampling port shall be included immediately above the secondary chamber.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Burn Rate (Average) 10-20 kg/hour 20-30 kg/hour 30-50 kg/hour 50-100 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.75Kw 0.83Kw 0.99Kw 1.2Kw
Diesel Oil Consumption (kg/hour) Ave.8.4 Ave.10.9 Ave.13.3 Ave.16.9
Natural Gas Consumption (m3n/hour) Ave.10.1 Ave.13 Ave.16 Ave.20.2
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Items/Model TS100(PLC) TS150(PLC) TS300(PLC) TS500(PLC)
Burn Rate (Average) 100-150 kg/hour 150-200 kg/hour 300-400 kg/hour 500-600 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 1200L 1500L 2000L 3000L
Internal Dimensions 120x100x100cm 150x100x100cm 170x120x100cm 210x120x120cm
Secondary Chamber 600L 750L 1000L 1500L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 1.38Kw 1.69Kw 2.57Kw 4.88Kw
Diesel Oil Consumption (kg/hour) Ave.20.4 Ave.24.2 Ave.33 Ave.44
Natural Gas Consumption (m3n/hour) Ave.
24.5
Ave.29 Ave.39.6 Ave.52.8
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes

4.5.2 If the Contractor is not the original manufacturer of the goods, the Contractor shall provide UNOPS with the benefit of 
all manufacturers’ warranties in addition to any other warranties required to be provided under the Contract;
4.5.3 The goods are of the quality, quantity and description required by the Contract, including when subjected to conditions 
prevailing in the place of final destination;
The goods are free from any right of claim by any third-party, including claims of infringement of any 4.5.4intellectual property
 rights, including, but not limited to, patents, copyright and trade secrets;
4.5.5 The goods are new and unused;
4.5.6 All warranties will remain fully valid following any delivery of the goods and for a period of not less than one (1) year following 
acceptance of the goods by UNOPS in accordance with the Contract;
4.5.7 During any period in which the Contractor’s warranties are effective, upon notice by UNOPS that the goods do not conform to 
he requirements of the Contract, the Contractor shall promptly and at its own expense correct such non-conformities or, in case of its inability to do so, replace the defective goods with goods of the same or better quality or, at its own 
cost, remove the defective goods and fully reimburse UNOPS for the purchase price paid for the defective goods; and,
4.5.8 The Contractor shall remain responsive to the needs of UNOPS for any services that may be required in connection 
with any of the Contractor’s warranties under the Contract.

 

HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification.
Medical Waste Incinerator & Auto Roll Air Filter(Air Purification)

 
Mobile: +86-138139 31455(WhatsApp)

Website: www.hiclover.com 
Email:     [email protected]       
Email:    [email protected]    

What is the main advantage of incineration?

What is the main advantage of incineration?
Incineration plays a vital role in making waste management easier and more efficient. 
Incineration can burn up to 90% of the total waste generated and sometimes even more. However, 
landfills only allow organic decomposition without making much difference, and non-organic waste keeps accumulating.
What materials can be incinerated?
A material commonly associated with waste incineration is municipal solid waste (MSW). 
This type of waste is typically general waste such as household waste, food waste, cardboard, 
and paper. All of these are safe to incinerate.
What are the types of waste?
There are 5 types of waste, do you know them all?
    Liquid Waste. Liquid waste is commonly found both in households as well as in industries. …
    Solid Rubbish. Solid rubbish can include a variety of items found in your household along with 
commercial and industrial locations. …
    Organic Waste. …
    Recyclable Rubbish. …
    Hazardous Waste.
Which waste is highly infectious?
Infectious waste: waste contaminated with blood and other bodily fluids (e.g. from discarded 
diagnostic samples), cultures and stocks of infectious agents from laboratory work (e.g. waste from 
autopsies and infected animals from laboratories), or waste from patients with infections (e.g. swabs, 
bandages and disposable 

waste management disposal pit latrine incinerators and rubbish pit
electrial incnirator for hospital waste
incinerators for corpse
incenerators for sale
inciratorमीन्स इन हिंदी
waste incinerator
incineration cost quantities
what is incineration of waste
safety waste incinerator

 

 
 
Nanjing Clover Medical Technology Co.,Ltd.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Burn Rate (Average) 10-20 kg/hour 20-30 kg/hour 30-50 kg/hour 50-100 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.75Kw 0.83Kw 0.99Kw 1.2Kw
Diesel Oil Consumption (kg/hour) Ave.8.4 Ave.10.9 Ave.13.3 Ave.16.9
Natural Gas Consumption (m3n/hour) Ave.10.1 Ave.13 Ave.16 Ave.20.2
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Items/Model TS100(PLC) TS150(PLC) TS300(PLC) TS500(PLC)
Burn Rate (Average) 100-150 kg/hour 150-200 kg/hour 300-400 kg/hour 500-600 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 1200L 1500L 2000L 3000L
Internal Dimensions 120x100x100cm 150x100x100cm 170x120x100cm 210x120x120cm
Secondary Chamber 600L 750L 1000L 1500L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 1.38Kw 1.69Kw 2.57Kw 4.88Kw
Diesel Oil Consumption (kg/hour) Ave.20.4 Ave.24.2 Ave.33 Ave.44
Natural Gas Consumption (m3n/hour) Ave.24.5 Ave.29 Ave.39.6 Ave.52.8
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes

 
 

The secondary chamber must comply with the following minimum criteria:
“• Heavy steel construction
• An excess air and high temperature operational mode.
• Sufficient size and appropriate geometry to achieve a gas temperature of at least 1000 Celsius for
 a retention time of at least 2 seconds when pre-heated and correctly operated.
• Sufficient forced air inflow and airflow and fuel supply controls to ensure an exhaust gas oxygen 
content range of 6-12% at all times. 
• Hot face refractory concrete-ceramic suitable for thermal shock up to 1400 Celsius and abrasion. 
Minimum thickness 150mm. 
• Cold face refractory lining of calcium silicate or superior material, minimum thickness 100mm. 
• Refractory lining of all the ducts shall be done with refractory castings. Superior quality ceramic 
wool shall be used at all hot duct flanges and expansion joints
• An electrically powered fan forced air supply, with the capacity for variation by the operator.
• One or more fuel burners designed to use diesel fuel type 2 (vehicle standard) equipped with a spark igniter.  
• A digital thermometer with connected to an electronic datalogger. The thermometer shall be 
located on the chamber wall away from the fuel burner.

 

HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification.
Medical Waste Incinerator & Auto Roll Air Filter(Air Purification)

 
Mobile: +86-138139 31455(WhatsApp)

Website: www.hiclover.com 
Email:     [email protected]       
Email:    [email protected]    

What is called incineration?

What is called incineration?
Incineration is a waste treatment process that involves the combustion of substances contained in 
waste materials. Industrial plants for waste incineration are commonly referred to as waste-to-energy facilities. … Incineration of waste materials converts the waste into ash, flue gas and heat.
 
What is incineration waste management?
In its most basic form, it is the destruction of something, especially waste material, by burning. 
Incineration is a thermo-decomposition process where the components present in the waste stream are ionized into 
harmless elements at a higher temperature in the presence of oxygen.
What type of waste is incinerated?
In incineration applications, the fuel is predominately waste (although fossil fuels may be co-fired) and the oxygen source is air. Combustion produces many of the same stable end products, 
whether the material burned is natural gas, coal, wood, gasoline, municipal solid waste, hazardous waste, 
or medical waste.
 
Which is an example of incineration?
For example, hospitals and research facilities generally use incinerators to dispose of biological tissues, 
blood-contaminated materials, and other medical wastes such as disposable hypodermic needles and tubing.
 
Are incinerators safe?
What’s more, incinerators release more toxic pollution than coal-fired power plants per unit of energy. 
To make the same amount of energy as a coal power plant, 
waste incinerators release: 28 times as much dioxin (a known carcinogen); 5 times as much carbon 
monoxide (a poisonous gas known as the “silent killer”);


 

 
 
Nanjing Clover Medical Technology Co.,Ltd.

< td class=et10 style="FONT-SIZE: 12pt; BORDER-TOP: rgb(0,0,0) 0.5pt solid; FONT-FAMILY: 'Trebuchet MS'; BORDER-RIGHT: rgb(0,0,0) 0.5pt solid; VERTICAL-ALIGN: middle; WHITE-SPACE: nowrap; BORDER-BOTTOM: rgb(0,0,0) 0.5pt solid; TEXT-ALIGN: center; PADDING-TOP: 1px; PADDING-LEFT: 1px; BORDER-LEFT: rgb(0,0,0) 0.5pt solid; PADDING-RIGHT: 1px" x:str="">Manual

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Burn Rate (Average) 10-20 kg/hour 20-30 kg/hour 30-50 kg/hour 50-100 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.75Kw 0.83Kw 0.99Kw 1.2Kw
Diesel Oil Consumption (kg/hour) Ave.8.4 Ave.10.9 Ave.13.3 Ave.16.9
Natural Gas Consumption (m3n/hour) Ave.10.1 Ave.13 Ave.16 Ave.20.2
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Items/Model TS100(PLC) TS150(PLC) TS300(PLC) TS500(PLC)
Burn Rate (Average) 100-150 kg/hour 150-200 kg/hour 300-400 kg/hour 500-600 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 1200L 1500L 2000L 3000L
Internal Dimensions 120x100x100cm 150x100x100cm 170x120x100cm 210x120x120cm
Secondary Chamber 600L 750L 1000L 1500L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 1.38Kw 1.69Kw 2.57Kw 4.88Kw
Diesel Oil Consumption (kg/hour) Ave.20.4 Ave.24.2 Ave.33 Ave.44
Natural Gas Consumption (m3n/hour) Ave.24.5 Ave.29 Ave.39.6 Ave.52.8
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes

“The operator will proceed to undertake the following duties:
• Initial supervision of the operation of each type of incinerator on a full-time basis for 5 working days, observing and recording each unit’s performance.
Development of an operating protocol for the client’s nominated staff to use whilst operating the unit. 
• Practical training of the client’s nominated personnel, in the operation and routine maintenance of the unit.
• Assessing the volume and types of waste awaiting incineration and developing an operating schedule for the client. 
• All equipment manuals shall be provided in English and in French.

• Fixed hearth geometry and starved air gasification operational mode. 
• Hot face refractory concrete-ceramic suitable for thermal shock up to 1400 Celsius and abrasion. Minimum thickness 150mm. 
• Cold face refractory lining of calcium silicate or superior material, minimum thickness 100mm. 
• Refractory lining of all the ducts shall be done with refractory castings. Superior quality ceramic wool shall be used at all hot duct flanges and expansion joints.
• Multiple electric ignition fuel burners designed to use automotive diesel fuel.
• Flame of the primary burner shall be oriented towards the center of the unit which does not impinge directly on the refractory floor or wall. The secondary burner shall be positioned in such a way that the flue gas passes through the flame. 
• The unit shall prevent leakage of the hot flue gas and any backfire. 
• An electrically powered fan forced air supply, with the capacity for variation by the operator.
• Digital thermometers connected to electronic dataloggers. The thermometers shall be located on the chamber walls away from the fuel burner.

 
 

HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification.
Medical Waste Incinerator & Auto Roll Air Filter(Air Purification)

 
Mobile: +86-138139 31455(WhatsApp)

Website: www.hiclover.com 
Email:     [email protected]       
Email:    [email protected]    

What are three disadvantages of incinerators?

How much fuel does an incinerator use?
Most fuel-assisted incinerators with a capacity to destroy 100 to 150 kilograms of waste per day consume 5 to 8 liters per hour of fuel (4 to 6.5 kilograms of gas)
 
What are three disadvantages of incinerators?
Disadvantages of Waste Incineration
    It is Expensive. The installation of an incineration plant is an expensive process. …
    Pollutes the Environment. …
    Damaging Public Health. …
    The Possibility of Long-term Problems. …
    Ash Waste Can Potentially Harm People and the Environment. …
    Environmental Racism.
smart ash incinerator
incinerator
diesel incinerator south africa
package medical waste incinerator
 
How much does it cost to run an incinerator?
Cost of incineration plant by formula
According to the formula, the cost of a 40,000 tpa plant is $41 million, or $1,026 per ton of annual capacity. A Medium-sized 250,000 tpa plant should cost $169 million, or $680 per ton of annual capacity. These numbers give us the first estimation of how much waste-to-energy is.
 
How hot is an incinerator?
Thermal destruction of most organic compounds occurs between 590/C and 650/C (1100/F and 1200/F). Most hazardous waste incinerators are operated at 980/C to 1200/C (1800/F to 2200/F) to ensure nearly complete destruction of the organics in the waste (AWMA, 1992).
Why incinerators are the most expensive form of waste disposal?
Incineration is generally the most expensive form of waste disposal because incin- erators require a lot of energy to operate. Incinerators also need pollution-control devices and need to be carefully monitored so that hazardous gases and particles are not released into the air.


 

 
 
Nanjing Clover Medical Technology Co.,Ltd.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Burn Rate (Average) 10-20 kg/hour 20-30 kg/hour 30-50 kg/hour 50-100 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.75Kw 0.83Kw 0.99Kw 1.2Kw
Diesel Oil Consumption (kg/hour) Ave.8.4 Ave.10.9 Ave.13.3 Ave.16.9
Natural Gas Consumption (m3n/hour) Ave.10.1 Ave.13 Ave.16 Ave.20.2
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Items/Model TS100(PLC) TS150(PLC) TS300(PLC) TS500(PLC)
Burn Rate (Average) 100-150 kg/hour 150-200 kg/hour 300-400 kg/hour 500-600 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 1200L 1500L 2000
L
3000L
Internal Dimensions 120x100x100cm 150x100x100cm 170x120x100cm 210x120x120cm
Secondary Chamber 600L 750L 1000L 1500L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 1.38Kw 1.69Kw 2.57Kw 4.88Kw
Diesel Oil Consumption (kg/hour) Ave.20.4 Ave.24.2 Ave.33 Ave.44
Natural Gas Consumption (m3n/hour) Ave.24.5 Ave.29 Ave.39.6 Ave.52.8
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes

• An electrically powered fan forced air supply, with the capacity for variation by the operator.
• One or more fuel burners designed to use diesel fuel type 2 (vehicle standard) equipped with a spark igniter.  
• A digital thermometer with connected to an electronic datalogger. The thermometer shall be located on the chamber wall away from the fuel burner.

Team compositions and tools/equipment list/description shall be detailed in the assembly, disassembly and Packing Manuals.  Provision for the use of video weblinks (in English with French and Arabic subtitles) showing the assembly process and, separately, the disassembly process is required.  Manuals are to be produced in English and French. YES/NO
The Contractor shall deploy an expert incinerator operator, fully equipped with all required tools and equipment, to support the client in un-packing, installation, and commissioning of the different sizes of incinerator units.  YES/NO
The operator will be provided on a day-rate reimbursable basis. The bidder must specify the minimum scope of work in terms of operator working days and travel days. Rates for these to be provided on the financial offer form. YES/NO
All associated fittings and connections to enable full functionality shall be completed by the bidder in line with the manufacturer’s instructions; including but not limited to piping, electrical and stack connections, foundations, anchorage to foundations, etc., as applicable

 
 

HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification.
Medical Waste Incinerator & Auto Roll Air Filter(Air Purification)

 
Mobile: +86-138139 31455(WhatsApp)

Website: www.hiclover.com 
Email:     [email protected]       
Email:    [email protected]    

Waste Incinerator vs pet crematory

a.) incinerator for waste. VS cremator for animalsanimal-cremation
b.) incineration to be ash and clean it. VS cremation and collect ash into pet cremation urns.pet-cremation-urns
c.) waste stack disorderly.VS pet in chamber individual.
d.) waste material complicated. VS pet is body.
e.) waste incineration is public affairs. VS pet cremation is personal business more.265_00066_23SEPT.jpg
f.) waste incinerator with small-large scale capacity. VS pet cremation with regual pet size or weight
g.) waste incinerator feeding door small or big. VS pet cremator feeding door match with pet size
h.) waste material with or without fat. VS pet body with fat.cremation-ash
i.) waste incinerator with or without exchange feeding door. VS pet cremator better with exchange feeding door.pet-cremation-in-incinerator-chamber