Tag: English

Melt blown Production Line 400mm and 1600mm and ES Fiber Production Line and N95 Mask Machine and Disposable Mask Machine

1. N95 and Disposable Mask Machine

 

2. 400mm and 1600mm Melt blown Production Line

3. ES Fiber Production Line

 

 

 

N95 Face Mask Machine Production Line

Melt blown Production Line

 

A.)Optional Ability: 1600mm

Performance: 95-97percent

FOB Term Cost: USD per pair

Cost Legitimate: 5days.

Ave.60 Days prepared for shipping.

In stock Price: USD per pair

 

 

B.)Optional Capacity: 400mm

Performance: 40-50%.

FOB Term Cost: USD per pair

Cost Legitimate: 5days.

Ave.20 Days prepared for shipping.

Payment: TT 70 percent In advance, TT 30 percent before render factory

Shipping: 1*20′ container per pair, Ave. 2000Kgs.

 

Main Parts: Extruder, mold, winder, oven, ultrasonic

Daily Capacity:100-150Kgs/24Hours

Screw extruder:100-150Kgs

Motor power: 15KW frequency conversion speed regulation Reducer speed ratio: 1:10 or 1:16 restricted length to diameter ratio: 30: 1 Screw diameter: 50mm Winding machine diameter: £ 630mm Winding machine drive motor power: 0.55kw speed ratio of winder drive reducer (if any): 1:71 Air heater power: 15kw Power of vacuum calciner: 12kw The size of vacuum calciner: 500 × 300 × 200 Ultrasonic power: 1800, frequency 28kHZ Ultrasonic sink size: 800 × 300 × 250

 

 



HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-04-20

New Courtice incinerator Strikes further delays

CLARINGTON — Clarington’s brand new energy-from-waste facility is going to be delayed a second time because the boilers aren’t operating correctly and the continuing startup period may cost Durham Region an extra $1 million.

“I would rather see it delayed and performed right than hurried,” said Clarington Mayor Adrian Foster.

The Durham York Energy Centre centre, situated in Courtice, has been scheduled to be fully operational on Dec. 14, 2014. Currently the Durham York Energy Centre is not expected to be in full working order before the past quarter of 2015.

The significant systems of the EFW facility are analyzed. The boiler temperature is large enough to the combustion process however the steam temperature is not high enough, and officials aren’t certain what the issue is, says Durham’s works commissioner, Cliff Curtis.

The steam temperature needs to be large enough to drive the turbine-generator. If the steam is too trendy it may damage the turbine.

“It is like running a car with oil,” said Mr. Curtis.

Covanta, the company building and operating the facility for Durham and York regions, has taken the boilers down for alterations, based on Mr. Curtis. It is expected to take three weeks to the repairs and alterations. Afterward there’ll be a four-week presentation period, followed with a 30-day approval test.

“We’re not getting the temperature we expected out of this boiler. “It is Covanta’s difficulty to deliver us the product that plays the way they said, so they’re going to select the time they require.”

The delay means additional consultant costs for building management, legal advice and baseline ambient air monitoring. A Durham Region works report said Durham’s share of the extra costs is $1 million, which can be provided from a temporary draw the solid waste management reserve fund.

“What’s the last price going to look like?” “There are definitely issues with getting it started out”

Since Jan. 16, Durham has been charging Covanta a $10,000-a-day overdue fee for each and every day that the EFW facility is not fully operational. The bill has been delivered to Covanta, however, it hasn’t been paid yet, according to Mr. Curtis. It was a part of a testing phase before the centre opens fully.

Durham cancelled landfill contracts and started sending garbage into the Courtice centre. Some garbage was burnt in the EFW plant during the evaluation phase, without generating power to the grid. Covanta has also been sending the trash to its incinerator in New York state, or landfills in the Niagara area.

Until the EFW facility is ready to go, the Region only pays Covanta half price of the agreed upon per-tonne fee. But, Durham is not earning any money before the plant is fully operational and promoting power back on the grid.

“We’re still on funding.

The plant building is arriving in slightly under budget, according to the works commissioner.

There are a few loose ends that might end up costing Durham Region more money. There’s still disagreement with former property owners on the value of this property expropriated for the facility, and a ruling is not expected until fall of next year. The final price for the utility building and connection costs is expected in coming months. The baseline ambient air monitoring runs till the EFW facility is operational, so the delay in launching means a continuing monitoring price.

“There’s some small cost over-runs on a few of the smaller things but normally we are financially on track to bring this in on funding and we look forward to having it online at the end of the calendar year,” said Mr. Curtis. A vital part of the financial situation for your energy-from-waste facility depends on it generating electrical energy revenue.

HOW THIS IMPACTS YOU

The Durham York Energy Centre is designed to process up to 140,000 tonnes of waste each year, and generate 17.5 gross megawatts of renewable energy — enough to power between 10,000 and 12,000 homes. A key part of the economic case for the energy-from-waste facility depends on it generating electrical power revenue.

from: http://www.durhamregion.com/news-story/5682601-new-courtice-incinerator-hits-further-delays/

New Courtice incinerator hits further Flaws

CLARINGTON — Clarington’s brand new energy-from-waste facility will probably be delayed a second time because the boilers are not functioning properly and the ongoing startup period could cost Durham Region an extra $1 million.

“I’d rather see it delayed and performed right than hurried,” explained Clarington Mayor Adrian Foster.

The Durham York Energy Centre facility, located in Courtice, was scheduled to be completely operational on Dec. 14, 2014. Now the Durham York Energy Centre is not predicted to be in full working order until the past quarter of 2015.

The significant systems of the EFW facility are analyzed. The boiler temperature is high enough for the combustion process however the steam temperature isn’t high enough, and officials are not certain what the problem is, states Durham’s works commissioner, Cliff Curtis.

The steam temperature needs to be high enough to drive the turbine-generator. If the steam is too cool it can harm the turbine.

“It is like running a car with oil,” said Mr. Curtis.

Covanta, the company building and operating the facility for Durham and York regions, has taken the boilers down for alterations, based on Mr. Curtis. It is likely to take three weeks for the repairs and alterations. Then there’ll be a four-week presentation period, followed by a 30-day approval test.

“We’re not getting the temperature we expected from the boiler. Once we get up the temperature, I believe everything will fall into place,” said Mr. Curtis. “It is Covanta’s difficulty to provide us the product that performs the way they said, so they’re going to take the time they need.”

The delay means added consultant costs for construction management, legal advice and baseline ambient air observation. A Durham Region works report said Durham’s share of the extra costs is $1 million, which can be offered by a temporary draw on the good waste management reserve fund.

“What’s the last cost going to look like?” “There are definitely issues with getting it started out”

Since Jan. 16, Durham has been charging Covanta a $10,000-a-day late fee for every day the EFW facility is not fully operational. The invoice has been sent to Covanta, however, it has not been paid yet, according to Mr. Curtis. It was part of a testing stage before the facility opens completely.

Durham cancelled landfill contracts and began sending crap into the Courtice facility. Some garbage was burned at the EFW plant throughout the evaluation phase, without producing power to the grid.

Until the EFW facility is up and running, the Region only pays Covanta half cost of the agreed upon per-tonne charge. However, Durham isn’t making any money until the plant is fully operational and promoting electricity back onto the grid.

“We’re still on budget. I’d rather be getting power sales on the grid,” said Mr. Curtis.

There are a few loose ends that could end up costing Durham Region more money. There is still disagreement with former property owners on the value of the property expropriated for the facility, and a ruling is not expected until fall of next year. The final cost for the utility construction and link prices is anticipated in coming months. The baseline ambient air observation runs till the EFW facility is operational, so the delay in opening means an ongoing monitoring cost.

“There is some minor cost over-runs on a few of the smaller items but normally we are financially on course to bring this on budget and we look forward to having it online by the end of the calendar year,” said Mr. Curtis.

HOW THIS IMPACTS YOU

The Durham York Energy Centre is designed to process around 140,000 tonnes of waste every year, and generate 17.5 gross megawatts of renewable energy — sufficient to electricity between 10,000 and 12,000 houses. A key part of the economic case for your energy-from-waste facility depends on it creating electric power revenue.

The Durham York Energy Centre is designed to process up to 140,000 tonnes of waste each year, and generate 17.5 gross megawatts of renewable energy — enough to power between 10,000 and 12,000 homes. A key part of the economic case for the energy-from-waste facility depends on it generating electrical power revenue.

from: http://www.durhamregion.com/news-story/5682601-new-courtice-incinerator-hits-further-delays/

Animal Carcass Incinerator

Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

Key Attributes:  * All versions with Dual combustion room.  * Stainless Steel chimney/stack, long lifetime. *based on order  * High fever, long lifetime of incinerator.  * Free or minimal installation onsite.  * High burn rate, from 10kgs to 500kgs per hourto 6ton daily.  * PLC Control Plane. *based on order  * New Design for pet animal cremation enterprise.  * One year guarantee on incinerator and components in stock. 

Currently we provide different collection for local customer requirements and design updated incinerator with our leading technology. Animal iacinerator, creature incincerator pricing, creature incineration, creature incineration emerging technologu, creature incineration equipment in china, creature incineration gear Prices, The updated design characteristic of our range of incinerators create them among the most cost effective in the world.

Items Specification
YD Model YD-30 / YD-50 / YD-100 / YD-150 / YD-200 / YD-300 / YD-500 / YD-600
Main Product List Primary Combustion Chamber
Secondary Combustion Chamber
Mix Combustion Chamber
Smoke Filter Chamber
Incinerator Common Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

Incinerator

Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combined Water Treatment
Export Markets:Global

Additional Info.

Trademark:clover

Product Description

Items Specification
Model TS10(PLC) / TS20(PLC) / TS30(PLC) / TS50(PLC) / TS100(PLC)
Main Product List Double Combustion Chamber
Smoke Filter Chamber
PLC Mode Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

Nanjing Clover Medical Technology Co., Ltd..

Incinerator

Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:CLOVER
Origin:Nanjing
Production Capacity:1000 Sets Per Year

Product Description

2011 year is an important base for us. We reach developed country market and stabilize old customers. Our incinerator usage in Southeast Asia, Central Asia, Europe, small scale garbage incinerator, small scale gas incinerator, small scale incenaration, scale incineration, small scale incinerator cost, small scale incinerator layouts, Middle East, Africa and Australia, etc.. Clover Incinerator has become among the famous and biggest incinerator supplier all over the world. 

Product Main Application:  1. Medical waste incineration treatment.  2. Pet/Animal cremation enterprise.  3.

We can supply different design & model incinerator products for different market request. Our large potential incinerator(300/500kgs per hour) accept by customers and marketplace finally.

Incinerator A1500

Basic Info.

Model NO.:A1500
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

Key Features:  * All versions with Dual combustion room.  * Stainless Steel chimney/stack, long lifetime. *based on order  * High temperature, long lifetime of incinerator.  * Free or minimal installation on site.  * High speed, from 10kgs to 500kgs per hour, up to 6ton per day.  *based on order  New Design for pet animal cremation enterprise.  * One year warranty on incinerator and components in stock.

Items/Model A360 A600 A900 A1200
Burning Rate *animal 20 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 60 kgs/Hr.
Feed Capacity *animal 30 kgs 50 kgs 80 kgs 100 kgs
Equipment Weight 2300 kgs 3000 kgs 4000 kgs 4300 kgs
Primary Chamber (Liters) 360 600 900 1200
Secondary Chamber (Liters) 200 200 300 500
External Dimensions (cm) 145x90x175 175 x 100 x 180 200x160x230 220x180x360
Internal Dimensions (cm) 100x60x60 130 x 70 x 65 120x90x85 130x100x90
Oil Tank(Liters) 200 200 300 300
Door Opening (cm) 48 x 60 50 x 60 62 x 80 55 x 80
Chimney (M) 5 5 5 10
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chmaber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree
2nd. Chmaber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree

Medical Incinerator

Basic Info.

Export Markets:Global

Additional Info.

Trademark:clover

Product Description

Nanjing Clover Medical Technology Co., Ltd. is a leading waste incinerator Maker in China.

Key Features:  * All models with Dual combustion room.  * Stainless Steel chimney/stack, long life. *according to order  * High temperature, long life of incinerator.  * Free or minimum installation onsite.  * High speed, from 10kgs to 500kgs per hour, up to 6ton daily.  *according to order  * New Design for pet animal cremation enterprise.  * One year warranty on incinerator and parts in stock. 

Program Scope:  1. Hospital& practice: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine.  2. 3. Community & Sea Port & Station: Municipal Solid Waste, etc.  4.

Items/Model YD-10C YD-20C YD-30C YD-50C
Burning Rate (kgs/Hour) 10 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 50 kgs/Hr.
Feed Capacity (kgs) 40 kgs 40 kgs 50 kgs 80 kgs
Equipment Weight 1200 kgs 1200 kgs 1800 kgs 2200 kgs
Primary Chamber (Liters) 200 200 250 400
Secondary Chamber (Liters) 140 140 140 140
External Dimensions (cm) 170x140x160 170x140x160 170x140x190 180x160x200
Internal Dimensions (cm) 55x55x65 55x55x65 55x55x85 70x70x85
Oil Tank(Liters) 50 100 100 150
Door Opening (cm) 38 x 48 38 x 48 38 x 48 45×55
Chimney (M) 5 5 5 5
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

Incinerators – Two

Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:CLOVER
Origin:Nanjing
Production Capacity:1000 Sets Per Year

Product Description

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree
2nd. Chamber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

Nanjing Clover Medical Technology Co., Ltd..

Small a Animal Crematory Equipment Prices

Basic Info.

Model NO.:small incinerators for sell
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Product Description

How you are able to find reasonable incinerator for your local site?  Incinerator isn’t a inexpensive equipment, normally the little scale model’s cost around $5, 000usd per unit and large scale model’s price greater than $50, 000usd each unit. Thus, before purchase one unit incinerator, you have to make clear following items:  A, burn what? Incinerator is a incineration equipment, function is flame waste. So what kind of waste that you would like to treatment?  B, little or large? This based on the waste output every day or the waste volume per feed , such as animal dimensions.  C, fuel? Incinerator use gas or oil fuel, generally, gas fuel is cheaper than oil and insenerator dual chamber, insinerator plc, insinerator sampah, installation on high-temperature pyrolysis burning medical and biowaste china, the smoke cleaner than oil fuel model. However, some neighborhood site don’t have gasoline supply system.  Along with other technology items, like electricity (220v, 380v), waste feed doorway type, incinerator construction, etc..

A Model animal crematory burning speed from 20-400kgs each hour. Heavy duty combustion chamber and suit for large animal cremation.  Residency time 2.0 sec. In place combustion chamber. Virtually smoke and smell free. 

Smoke Filter Chamber with filter brick, Virtually smoke and smell free after burning. 

Italy original gas or oil burner, quality dependable. It suit for diesel oil, natural gas, LPG gas. 

User guider, complete installation and performance document for client.

Items/Model A1500 A2400 A4000 A5500
Burning Rate *animal 90 kgs/Hr. 150 kgs/Hr. 200 kgs/Hr. 400 kgs/Hr.
Feed Capacity *animal 120 kgs 200 kgs 300 kgs 500 kgs
Equipment Weight 7000 kgs 8300 kgs 13000 kgs 16500 kgs
Picture  
Primary Chamber (Liters) 1500 2400 4000 5500
Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 240x170x380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 150x100x96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 500 500 500 500
Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES