Gas Fired Incinerator



Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:clover

Product Description

Principle of the Incinerator equipment is incineration/combustion/burn. Generally, the function is waste treatment for Solid waste, Liquid waste, Gas waste, etc. 
The main body is one combustion chamber (at least), Refractory line or firebrick, Insulation materials and the outer plate. Ignition element is external oil or gas burner. The burner can be running until incinerator usd, incinerator vietnam, incinerator waste, incinerator waste chamber, incinerator waste diesel, incinerator water filter, incinerator website, waste burnout but for some waste like plastic, paper (sometime, mix coal with waste before feeding), they can combustion itself after Ignition. During combustion, burner has a fan itself for Oxygen supply and also protect burner avoid heat damage from combustion chamber. And, there a external fan blow air into combustion chamber. The Exhaust gas blow out after combustion. 
Considering Environmental Protection requirements and rules, almost all incinerator have secondary combustion chamber (after-burn, post-combustion), even if third combustion chamber. The secondary burner burn the Exhaust gas from primary combustion chamber, this technology make sure sufficient combustion, few black smoke and smell. 
The updated incinerator technology focus on Exhaust gas treatment to remove Hazardous material and other function from incinerator, like heat recovery (waste to energy), save fuel cost, PLC Automation operation. 
In some Developed countries, some new waste treatment method like High-temperature cooking, waste carbonization, crushing sterilization technology is instead of incineration technology.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800–1000 degree 800–1000 degree 800–1000 degree 800–1000 degree 800–1000 degree
2nd. Chamber Temperature 1000-1200 degree 1000-1200 degree 1000-1200 degree 1000-1200 degree 1000-1200 degree
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

incinerador doméstico

Los documentos que se enviarán de la siguiente manera;

  • Acreditaciones de fabricantes
  • Informe de prueba para demostrar el nivel CERO de emisiones nocivas proporcionado como muestras de otras instalaciones
  • Informe de prueba para demostrar la esterilidad alcanzada en el nivel 6log a 10 que se proporcionará al momento de la puesta en servicio y la validación

La propuesta técnica incluye:

  • El hospital debe proporcionar el espacio necesario: edificio e infraestructura, suministro de vapor de energía suficiente y

conexión hasta la línea de agua y alcantarillado de la habitación

  • Preparación de la sala: la preparación, renovación y modificación de la sala es responsabilidad del proveedor
  • El proveedor debe presentar el dibujo necesario que muestre los requisitos de espacio (tamaño de la habitación (LxWxH) dimensiones de

procesadores y equipos auxiliares

  • El proveedor debe dar la propuesta del requerimiento total de energía de toda la unidad y sobre el cual el hospital

Asegurar la fuente de alimentación. Sin embargo, las conexiones dentro de la sala son responsabilidad del proveedor.

  • La conexión / accesorios forman el procesador y los equipos auxiliares a la línea de agua y alcantarillado son los proveedores.

responsabilidad.

  • Una propuesta de capacitación detallada que incluya la duración de la capacitación del personal sobre cómo operar y mantener el procesador.
  • Un programa de mantenimiento detallado.
  • Lista de repuestos y accesorios necesarios para el mantenimiento del sistema

Garantía y servicios posventa:

  • El período de garantía será mínimo de 03 años o el ofrecido por el fabricante que venga más tarde.
  • El período de garantía se contará a partir de la fecha de entrega de la máquina al usuario en funcionamiento.

condición, es decir, fecha de comisión.

  • En el período de garantía, el proveedor debe proporcionar todos los servicios de mantenimiento y reparación.
  • El tiempo de incumplimiento no se contará en el período de garantía.
  • El proveedor debe garantizar al menos 10 años de servicio de respaldo (incluido el período de garantía).
  • El trabajo de reparación / mantenimiento debe realizarse dentro de las 72 horas posteriores a la solicitud del usuario.

Estándar de calidad: el certificado CE / FDA del artículo ofrecido debe enviarse con la oferta.

  • Para la verificación del certificado el licitante deberá presentar lo siguiente:
  1. i) Dirección postal del emisor del certificado.
  2. ii) Sitio web, dirección de correo electrónico y número de teléfono y fax del emisor.
  • La oferta no responderá si:
  1. i) No se puede contactar al emisor del certificado
  2. ii) El emisor no autentifica el certificado dentro de la validez de la oferta.

iii) El emisor confirma que el certificado presentado es defectuoso en términos de autenticidad o validez.

Biomedical Waste Burner, 10-15 KG.

The first is a small
20kg/per hr incinerator for a small-medium sized hospital, and the
second is a 500kg per/hr incinerator for a company planning to start a
incineration service in Lahore.Burn Rate : >200 kg per hour
Average fuel consumption : ~29 kg per hour ( Or lesser)
Gas Retention in Secondary Chamber : 2 secs
Temperature Monitoring : Yes
Average Ash Residue : 3%Medical waste management practises here are sub-standard. I have come across your small scale medical waste management units.Biomedical Waste Incinerator, 10-15 kg
Manufacturer:
Brand:
Type / Model:
Country of Origin:
Description of Function
The Biomedical Waste Incinerator is used for Incineration of each type of Biomedical Waste.
The Disposal of such Biomedical waste is a very important as it is a dangerous wastes for
human life, and It is only possible with a perfect incinerator.
Operational Requirements
It shall be operated by manual and automated mode.
The combustion efficiency (CE) shall be at least 99.00%.
The combustion efficiency is computed as follows:
C.E.= __%CO2______ x 100
%CO2 + %CO
Emission Standards: Lower emission rates are preferred.
Parameters                   Concentration in mg/Nm3 (12% CO2 correction
Max total dust              30mg/m3
Max Sulphur Dioxide      200mg/m3
Max Nitrogen dioxide    400mg/m3
Max Carbon                     100mg/m3
Monoxide
Minimum stack height shall be 30 metres above ground.
Volatile organic compounds in ash shall not be more than 0.01%.
System Configuration
Biomedical Waste Incinerator, complete unit.
Technical Specifications
Incinerator:
It shall be Electrical or Diesel Fired Incinerator or Controlled Air & pyrolytic.
Type of Waste: Biomedical Waste
It shall have burning capacity 10-15 kg/hr.
Fuel: Diesel
Burner: Monoblock fully automatic burners.
Temperature: Primary Chamber 800 ± 50 oC, Secondary Chamber 1050 ± 50 oC.
Type of Waste: Biomedical waste with moisture content up to 85%.
Destruction Efficiency: 99%.
It shall have separate digital display of temperature for both chambers.
It shall have provision for measuring primary & secondary chamber temperatures using external
thermo coupler.
Secondary chamber gas residence time shall be minimum 1 second at 1050 oC.
Primary Chamber:
Type: Static Solid Hearth
Material of Construction: Mild Steel, 5mm thick
Refractory thickness: approx.115mm thick
Material: Refractory bricks confirming to international standard.
Temperature resistance: 1400 oC
Insulation thickness: approx.115mm thick
Material: Insulation bricks confirming to international standard.
Waste Charging: Manual & Automatic waste charging.
Ash Removal: Manual/automatic
Secondary Chamber:
Type : Static Solid Hearth
Material of Construction: Mild Steel, 5mm thick
Refractory thickness: approx.115mm thick
Material: Refractory bricks confirming to international standard.
Temperature resistance: 1400 oC.
Insulation thickness: approx.115mm
Material: Insulation bricks confirming to international standard.
Waste Charging: Manual & Automatic waste charging.
Emergency Stack:
Type: cylindrical, top mounted on venturi ejector.
Material of Construction: Mild Steel, 3mm thick.
Refractory: 75mm thick castable.
Insulation: 25mm thick castable.
Quencher:
Material of construction of outer body: Mild Steel refractory lined from inside.
Shall have water circulation system with centrifugal pump.
It shall have to reduce flue gas temperature before venturi scrubber.
Shall provide pump motor of suitable capacity.
Air Pollution Control Device – Venturi Scrubber
Type: High pressure jet type.
MOC: Stainless steel – 316L.
Temperature at the outlet: 78-80 oC
Scrubbing Media: Water with 5% caustic
Re- Circulation Pump for Venturi Scrubber
Type: Centrifugal
Application: PP/SS
Piping : PPR
Droplet Separator & Re-Circulation Tank (Integral)
Type: Cyclonic
Application: To separate water droplets from flue gases
Material of Construction: Mild Steel Rubber lined 3mm thick
I.D. Fan:
Type: High pressure centrifugal
Material of Construction: Stainless steel 304, impeller and mild steel rubber lined casting
Drive: Bel
Combustion Fan:
Type: Centrifugal
Modulation: Manual damper control
Material of Construction: Mild Steel
Drive: Direct drive
Burners:
No. of burners: 2 Nos. (1 No. in Primary Chamber and 1No. in Secondary Chamber)
Type: Monoblock fully automatic
Fuel: Diesel
Fuel Oil Storage Tank:
Shall provide suitable capacity of oil storage tank.
Material of Construction: Mild steel.
Facility for visual checking of fuel shall be there.
It shall have diesel consumption monitoring system.
It shall come with diesel oil level indicator, piping with valves & N.R. valve.
Control Panel:
Type: Manual & Automated PLC based control panel with printer & recording device.
Material of Construction: CRCA sheet
It shall have digital temperature controller.
Epoxy powder coated washable paint finish.
It shall have audio-visual alarm system.
Chimney of 30 meters Height:
Material of Construction: Mild Steel
It shall be self-supporting type.
Height shall be 30 meters from ground level.
Paint The chimney is painted externally with two coats of heat resistant aluminum paint
Shall provide ladder till the top.
It shall have 3mm thick rubber lining from inside for protection.
It shall come with aviation lamp, lightening arrestor, stack, drain, inspection platform, sampling
port.
Consumption certificate:
The bidder must submit diesel consumption for a daily operation of 6 hours.
Turnkey:
Prices offered shall be inclusive of all civil works, electrical requirements including cabling and
switches required for installation & commissioning of the equipment.
Bidder shall submit detail drawings, design, and layout plan of civil works.
The bidder shall submit the details of BOQ of civil and electrical works.
Accessories, spares and consumables
All standard accessories, consumables and parts required to operate the equipment, including
all standard tools and cleaning and lubrication materials, to be included in the offer. Bidders
must specify the quantity of every item included in their offer (including items not specified
above).
Operating Environment
The system offered shall be designed to store and to operate normally under the conditions of
the purchaser’s country. The conditions include Power Supply, Climate, Temperature,
Humidity, etc.
Power supply: 220-240 VAC, 50Hz single phase/400 – 420 VAC, 50Hz three phase as
appropriate fitted with appropriate plug. The power cable must be at least 3 meter in length.
Standards and Safety Requirements
It shall have approval of “Pollution Control Board” of purchaser’s country.
All mandatory approvals required for the installation and operation of incinerator shall be done
by the bidder.
Must submit ISO 9001 AND
CE or USFDA approved product certificate.
User Training
Must provide user training (including how to use and maintain the equipment).
Warranty
Comprehensive warranty for 2 years after acceptance.
Maintenance Service during Warranty Period
During the warranty period supplier must ensure preventive maintenance along with
corrective/breakdown maintenance whenever required.
Installation and Commissioning
The bidder must arrange for the equipment to be installed and commissioned by certified or
qualified personnel; any prerequisites for installation to be communicated to the purchaser in
advance, in detail.
Documentation
User (Operating) manual in English.
Service (Technical / Maintenance) manual in English
List of important spare parts and accessories with their part number and costing.
Certificate of calibration and inspection from factory.

крошечный мусоросжигатель для медицинских учреждений

ИНСИНЕРАТОР ОТХОДОВ

– 150 кг / час

– Соответствует правилам ЕС, Директиве 2000/76 / EC

– Тип топлива: Дизель

– Простое управление и обслуживание

– Температуры:

850 ° C для бытовых отходов

1000 ° C для медицинских отходов

1100 ° C для опасных отходов, содержащих галогенизированные органические вещества с содержанием хлора или его соединений. Мусоросжигатель со средней производительностью горения 20-30 кг / час, и он должен использовать дизельное топливо или отработанное моторное масло, МЕДИЦИНСКИЕ ИНСИНЕРАТОРЫ, ГЕРМЕТИЧНОСТЬ: 3 ТОННЫ. малогабаритная установка для сжигания медицинских отходов – для наших клиентов (больниц)

hiclover incinerator 100-150kgs per hour

Model

YD-100

Image

Burning Rate

100-150 kgs/hour

Key Combustion Chamber

2000 Liters

Second Combustion Chamber

500 Liters

Feed Setting

Handbook

Voltage

220V/380V

Power

2.5 Kw

Gas Kind

Diesel Oil

Heater

Italy Original

Oil Intake (Diesel Oil)

Average 28 kg/hour

Gas Usage (Gas)

***

Inner Dimensions

180x115x98 centimeters (primary chamber)

External Dimensions

270x185x280cm (without chimney)

Temperature Display

Yes

Oil Tank Capacity( if oil fuel)

200 Liters

Door Opening

55 x 80cm

Chimney Length

6.0 Meters

Smokeshaft Kind

Steel

Equipment Gross Weight

9000 kgs

Procedure Technical Specs

Primary Chamber Temperature Level

800 ℃–– -1000 ℃

Secondary Chamber Temperature Level

1000 ℃ -1200 ℃

Residency Time

2.0 Sec.

Burning Efficiency

> 98%

Waste Lower Calorific Power

3500Kcal


HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-22

Calentador YD-30 para Australia

Disposición del calentador YD-30 para el cliente de Melbourne en Australia.

Artículos / Modelo
YD-30

Tasa de combustión (kg / hora).
30 kg / hora

Capacidad de alimentación (kgs).
60 kgs.

Peso de las herramientas.
2300 kgs.

Cámara principal (litros).
360.

2da Cámara (Litros).
200.

Dimensiones exteriores (cm).
145x90x175.

Medidas interiores (centímetros).
100x60x60.

Tanque de aceite (litros).
200.

Apertura de puerta (centímetros).
48 x 60.

Eje de humo (M).
5.

Tipo de chimenea.
Acero inoxidable.

Cámara añadida.
INDUDABLEMENTE.

Cámara de mezcla-combustión.
POR SUPUESTO.

Cámara de filtro de humo.
DEFINITIVAMENTE.

Combustible de combustión.
Gas de petróleo.

Tiempo de residencia.
2,0 seg.

Seguimiento del nivel de temperatura.
SI.

Primero. Grado de temperatura de Chmaber.
800 ℃ –– – – 1000 ℃.

Segundo. Nivel de temperatura Chmaber.
1000 ℃ -1200 ℃.

Ambiental médico  

Incineradores de residuos
Incinerador de desechos médicos
Cremación de animales domésticos
Residuo sólido   Incinerador

Tel: + 86-25-8461 0201
Móvil: + 86-13813931455 (whatsapp / wechat)
Sitio web: www.hiclover.com
Correo electrónico: [correo electrónico protegido]
Correo electrónico: [correo electrónico protegido]
Tecnología médica Co., Ltd. del trébol de Nanjing

установка для сжигания отходов медицинских учреждений в контейнерах

Одно требование 40 ′ ′ – контейнерная горелка, и вы также понимаете, что вы можете помочь нам с покупкой того же самого. Вид или применение отходов: Общие, а также для медицины

Способность кг / час: от 75 до 350
Медицинское учреждение, а также лабораторные инструменты.

Один из наших уважаемых потребителей заинтересован в приобретении горелки для медицинских отходов в соответствии со следующими характеристиками:

Сжигатель мусора для медицинских учреждений
Производительность: 50 кг / час
Совершенно новый общий рабочий блок
Горелки: Двойные (газовые и дизельные).
Контейнер 20 футов с мусоросжигательной установкой для плавления твердых отходов, в том числе с соблюдением основных требований:

1. ИНСИНЕРАТОР.
2. ИСКРОГНИТЕЛЬ.
3. ДЫМОХОДНАЯ КОЛПА / ВЫХЛОПНАЯ ТРУБА.
4. ДИЗЕЛЬНОЕ МАСЛО DAYTANK 400 Л WEB.
5. КОМПЛЕКСНАЯ ПОЖАРНАЯ РАБОТА С СИСТЕМОЙ.
6. РУКОВОДСТВО ПОЛЬЗОВАТЕЛЯ.
7. ДОПОЛНИТЕЛЬНЫЕ ЗАПЧАСТИ НА 1 ГОД ЭКСПЛУАТАЦИИ.
установка для сжигания медицинских отходов от 2,5 до 3 кубометров, а также производительность от 60 до 100 кг в час.

Animal Corpse Incineration Furnace



Basic Info.

Export Markets:Global

Additional Info.

Trademark:clover

Product Description

First, for the medical waste from hospital, the pyrolytic incinerators is best treatment up to now. Pyrolytic technology can kill the virus, pollution control. 
Second, for human body, pet animal, in many countries and regions, we desire to cremation them. This is the ceremony in the process of society development, and ceremonies to commemorate the disappearance of life. 

As above two reason but not only above, we still use incinerators. 

How you can find reasonable incinerator for your local site? 
Incinerator is not a cheap equipment, generally the small scale model's price around $5, 000USD per unit and large scale model's w2e pet, waste anathomics incinerator, waste burner china any fuel, waste clinic incinerator manufacturers, waste gas incinerator manufacturer, waste incineration, price more than $50, 000USD per unit. So, before purchase one unit incinerator, you have to make clear following items: 
A, burn what? Incinerator is a incineration equipment, function is fire waste. So what kind of waste you want to treatment? 
B, small or large? This according to the waste output every day or the waste volume per feed time, like animal size. 
C, fuel? Incinerator use oil or gas fuel, generally, gas fuel is cheaper than oil and the smoke cleaner than oil fuel model. But some local site don't have gas supply system. 
And other technology items, like power(220V, 380V), waste feed door type, incinerator structure, etc.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

Big General waste burner Burn Price as much as 250kg per hr

Items/Model

TS300( PLC)

Principle

Waste Incineration Treatment

Burn Price

Standard 250 kg/hour

Control Mode

PLC( Programmable Logic Controller Incinerator)

Combustion Chamber

2000L

Interior Dimensions

170x120x100cm

Second Chamber

1000L

Smoke Filter Chamber

Yes

Feed Setting

Handbook

Voltage

220V

Power

2.5 Kw

Oil Intake (kg/hour)

Average 28( DO)

Gas Intake (m3/hour)

***

Temperature Level Monitor

Digital Display

Temperature Defense

Yes

Oil Storage Tank

1000L

Feed Door

80x60cm

Smokeshaft

10Meter

Smokeshaft Kind

Stainless Steel

1st. Chamber Temperature Level

800 ℃–– -1000 ℃

2nd. Chamber Temperature

1000 ℃ -1200 ℃

Residency Time

2.0 Sec.

Gross Weight

11000kg

External Dimensions

400x210x300cm( without smokeshaft)

HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-22