Archive: July 14, 2022

Newsletter – incinerator

Newsletter – incinerator

Google
incinerator
Medical Waste Incinerators 2020年6月27日
www.imcha.net
Nanjing Clover Medical Technology Co.,Ltd.
Tel: +86-13813931455(WhatsApp)
Website: www.hiclover.com
Add: Gangjia Zhihui Industrial Area, Xin Gangwan Rd. Liuhe, Nanjing, China 211500
HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification. Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
TWO district MPs have opposed plans for a controversial waste-to-energy plant in Keighley over air quality concerns. Robbie Moore (Keighley and …
Facebook Twitter 标记为不相关
Beddington Farmlands is an area adjacent to the Beddington Incinerator, known for many years as a birdwatching site. It is being developed as a …
Facebook Twitter 标记为不相关
查看更多结果 | Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
发送反馈
Newsletter
|
RSS 以RSS Feed的形式接收此快讯

 

DIESEL FIRED INCINERATOR, WITH 1000 LTR FUEL TANK AND 6M CHIMNEY

DIESEL FIRED INCINERATOR, WITH 1000 LTR FUEL TANK AND 6M CHIMNEY

Items/Model

TS250(PLC)

Picture

Principle

Waste Incineration Treatment

Burn Rate

Average 250 kg/hour

Feed Capacity

Average 400kg/feeding

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

2000L

Internal Dimensions

210x88x110cm

Secondary Chamber

1000L

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

220V

Power

2.0Kw

Oil Consumption (kg/hour)

Average 24.2(DO)

Gas Consumption (m3/hour)

***

Temperature Monitor

Digital Display

Temperature Protection

Yes

Oil Tank

1000L

Feed Door

2.04 x 1.06 M

Chimney

3Meter

Chimney Type

Stainless Steel

1st. Chamber Temperature

800–-1000

2nd. Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Gross Weight

9000kg

External Dimensions

3.00mx1.60mx3.00m (without chimney)

Nanjing Clover Medical Technology Co.,Ltd.
Tel: +86-13813931455(WhatsApp)
Website: www.hiclover.com
Add: Gangjia Zhihui Industrial Area, Xin Gangwan Rd. Liuhe, Nanjing, China 211500

HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification. Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)

INCINERATION IS A WASTE TREATMENT PROCESS THAT INVOLVES THE COMBUSTION OF ORGANIC SUBSTANCES CONTAINED IN WASTE MATERIALS. INCINERATION AND OTHER HIGH-TEMPERATURE WASTE TREATMENT SYSTEMS ARE DESCRIBED AS “THERMAL TREATMENT”. INCINERATION OF WASTE MATERIALS CONVERTS THE WASTE INTO ASH, FLUE GAS AND HEAT. THE ASH IS MOSTLY FORMED BY THE INORGANIC CONSTITUENTS OF THE WASTE AND MAY TAKE THE FORM OF SOLID LUMPS OR POWDER.

TWO (2) YEAR MAINTENANCE SPARES PACKAGE FOR LINE ITEM 2 X OIL FIRED BURNER

2 X CEMENT REPAIR KIT (25KG)

2 X THERMOCOUPLE

Nanjing Clover Medical Technology Co.,Ltd.
Tel: +86-13813931455(WhatsApp)
Website: www.hiclover.com
Add: Gangjia Zhihui Industrial Area, Xin Gangwan Rd. Liuhe, Nanjing, China 211500

HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification. Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)

2 X FIRE ROPE (1M)

2 X HT MASTIC (PER INCINERATOR)

1 X PPE KIT


HICLOVER – Medical Environmental 


 
WWW.HICLOVER.COM
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-06-27

Nanjing Clover Medical Technology Co.,Ltd.
Tel: +86-13813931455(WhatsApp)
Website: www.hiclover.com
Add: Gangjia Zhihui Industrial Area, Xin Gangwan Rd. Liuhe, Nanjing, China 211500

HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification. Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)

 

General specifications of a 100 kg/hr three combustion Chambers Incinerator

General specifications of a 100 kg/hr three combustion Chambers Incinerator

Nanjing Clover Medical Technology Co.,Ltd.
Tel: +86-13813931455(WhatsApp)
Website: www.hiclover.com
Add: Gangjia Zhihui Industrial Area, Xin Gangwan Rd. Liuhe, Nanjing, China 211500

HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification. Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)

General specifications of a 100 kg/hr incinerator
No. Description Parameter value  
  model   HICLOVER YD100
1 Machine working mode Oil + Power Oil + Power
2 Voltage 220V �C 3 phase or 1 phase 220V 1P
3 Oil consumption (lit/hr) Average 25-32 lit/hr/chamber Average 33Liters/hour/total incinerator 3 burners
6 Incineration rate 100 kg/hr = 400-600 kg/8hr average 100kgs per hour
7 Feed mode Manual manual
8 Primary combustion rate 1000 lit 1080 liters
9 Secondary combustion rate 240 lit 207 Liters
10 Tertiary combustion rate 416 lit 452 liters
11 Combustion chamber material High temp. resistant concrete High temp. resistant concrete
12 Internal dimensions (1st chamber) 100*100*100 cm (l*w*h) = 1000 lit 120*100*90cm(l*w*h) = 1080 lit
13 Internal dimensions (2nd  chamber) 40*40*150 cm = 240 lit Diameter 42*150cm=207 Liters
14 Internal dimensions (3rd  chamber) 40*40*260 cm = 416 lit Diameter 60*160cm=452 Liters
15 External dimensions 300*155*200 cm (l*w*h) 220*160*370 cm (l*w*h)
16 Door opening 90*90 cm 90*90 cm
17 Additional air fan 1 fan (on the door) 1 fan (on the door)
18 Fuel type Diesel oil/ Diesel oil
19 Burner Brand: Radiator or Hofmat Italy Baltur
20 Chimney length 3-4 meters 5 Meters
21 Chimney type and material H-type stainless steel, or High temp. resistant concrete 1 Meter High temp. resistant concrete +4 Meter Stainless steel
22 Smoke and smell filter Yes, two stages. Dry Scrubber 2 stages
23 Temperature monitor Yes, (for 1st and 3rd chambers) Yes, (all 3 chambers)
24 Temperature control Optional yes
25 Oil tank 500 lit needed. yes
26 Burning efficiency >98% yes
27 1st chamber temperature 300-700 oC 800-1000 oC
28 2nd chamber temperature 500-1000 oC 1000-1200 oC
29 3rd chamber temperature 800-1200 oC 1000-1300 oC
30 Smoke residency time >2 sec. >2 sec.
31 Gross weight 5-8 tons average 6.5 Ton
32 No. of Burners 3 3

HICLOVER – Medical Environmental 


 
WWW.HICLOVER.COM
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-06-27

 

Newsletter – medical waste

Newsletter – medical waste

Google
medical waste
Medical Waste Incinerators 2020年6月27日
www.imcha.net
Nanjing Clover Medical Technology Co.,Ltd.
Tel: +86-13813931455(WhatsApp)
Website: www.hiclover.com
Add: Gangjia Zhihui Industrial Area, Xin Gangwan Rd. Liuhe, Nanjing, China 211500
HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification. Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
… but the icky factor makes it more difficult to deal with PPE due to our perceptions and ignorance regarding the management of medical waste.
Facebook Twitter 标记为不相关
查看更多结果 | Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
Newsletter
|
RSS 以RSS Feed的形式接收此快讯
发送反馈

 

Newsletter – medical waste

Newsletter – medical waste

Google
medical waste
Medical Waste Incinerators 2020年6月27日
www.imcha.net
Nanjing Clover Medical Technology Co.,Ltd.
Tel: +86-13813931455(WhatsApp)
Website: www.hiclover.com
Add: Gangjia Zhihui Industrial Area, Xin Gangwan Rd. Liuhe, Nanjing, China 211500
HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification. Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
Bio waste comes primarily out of hospitals as well as Covid Care Centres and Dedicated Covid Health Care Centres. It includes laboratory waste, gloves …
Facebook Twitter 标记为不相关
查看更多结果 | Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
发送反馈
Newsletter
|
RSS 以RSS Feed的形式接收此快讯

 

Newsletter – incinerator

Newsletter – incinerator

Google
incinerator
Medical Waste Incinerators 2020年6月27日
www.imcha.net
Nanjing Clover Medical Technology Co.,Ltd.
Tel: +86-13813931455(WhatsApp)
Website: www.hiclover.com
Add: Gangjia Zhihui Industrial Area, Xin Gangwan Rd. Liuhe, Nanjing, China 211500
HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification. Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
But a leading anti-incineration campaigner says he fears the plan is a short term measure until it is possible for rubbish to be burned even closer to home …
Facebook Twitter 标记为不相关
查看更多结果 | Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
Newsletter
|
RSS 以RSS Feed的形式接收此快讯
发送反馈

 

Newsletter – medical waste

Newsletter – medical waste

Google
medical waste
Medical Waste Incinerators 2020年6月26日
www.imcha.net
Nanjing Clover Medical Technology Co.,Ltd.
Tel: +86-13813931455(WhatsApp)
Website: www.hiclover.com
Add: Gangjia Zhihui Industrial Area, Xin Gangwan Rd. Liuhe, Nanjing, China 211500
HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification. Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
A new research study has been presented by Precision Market Reports (PMR) after a comprehensive analysis on MEDICAL WASTE MANAGEMENT …
Facebook Twitter 标记为不相关
查看更多结果 | Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
Newsletter
|
RSS 以RSS Feed的形式接收此快讯
发送反馈

 

Newsletter – medical waste

Newsletter – medical waste

Google
medical waste
Medical Waste Incinerators 2020年6月26日
www.imcha.net
Nanjing Clover Medical Technology Co.,Ltd.
Tel: +86-13813931455(WhatsApp)
Website: www.hiclover.com
Add: Gangjia Zhihui Industrial Area, Xin Gangwan Rd. Liuhe, Nanjing, China 211500
HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification. Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
Medical waste, such as disposable gloves and gowns, is inevitable and necessary as people adopt precautionary measures to prevent transmission.
Facebook Twitter 标记为不相关
Chemical and industrial wastes. Agricultural incineration. Sewage incineration. Building wastes. Ashes and medical waste incineration. Regions …
Facebook Twitter 标记为不相关
查看更多结果 | Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
发送反馈
Newsletter
|
RSS 以RSS Feed的形式接收此快讯

 

Newsletter – incinerator

Newsletter – incinerator

Google
incinerator
Medical Waste Incinerators 2020年6月26日
www.imcha.net
Nanjing Clover Medical Technology Co.,Ltd.
Tel: +86-13813931455(WhatsApp)
Website: www.hiclover.com
Add: Gangjia Zhihui Industrial Area, Xin Gangwan Rd. Liuhe, Nanjing, China 211500
HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification. Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
The Incinerator market analysis is provided for the international markets including development trends, competitive landscape analysis, and key …
Facebook Twitter 标记为不相关
查看更多结果 | Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
Newsletter
|
RSS 以RSS Feed的形式接收此快讯
发送反馈

 

Sudan Medical waste Therapy Strategy


•    A burn rate of 25 – 30kg/hr.
•    Consists of two chambers to ensure significant reduction of emissions and be capable of temperatures in the range of 800-1000˚c.
•    Incinerator must be of a low maintenance design, be diesel fuelled and need no more than 15 amp 220-250 V power. KW consumption per hour should be stated.
(1)  What  are  main  differences  between  medical  incinerators:    YD-10C  and  TS10(PLC)?
(2)  After  combustion,  the  medical  waste  becomes  smoke?  Without  smell?  No  pollution?
(3)  What  should  we  do  to  release  the  smoke?    Prepare  a  pipe  to  direct  the  smoke  to  factory  outside?
(4)  Any  operation  guide  for  reference,  we  worry  that  it’s  difficult  to  operate?
•    The incinerator should also be able to run off a generator.
•    The incinerator should have option of tank and should use no more than 12L of diesel fuel per hour to burn 25- 30kg of waste.options for medical waste incineration for Kabul, Afghanistan
•    Design must be such to minimize risk to operators and have a simple start sequence to minimize operator training and skills
•    Solid waste reductions in the range of 90 – 97% should be routinely achieved.a central thermal treatment station in the city of Khartoum (9 million inhabitants) we started with two units of autoclave that treat up to 18 tons a day so far, and looking forward to add an incineration plant/s to serve for medical, pharmaceutical, and hazardous waste.