HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification. Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
INCINERATION IS A WASTE TREATMENT PROCESS THAT INVOLVES THE COMBUSTION OF ORGANIC SUBSTANCES CONTAINED IN WASTE MATERIALS. INCINERATION AND OTHER HIGH-TEMPERATURE WASTE TREATMENT SYSTEMS ARE DESCRIBED AS “THERMAL TREATMENT”. INCINERATION OF WASTE MATERIALS CONVERTS THE WASTE INTO ASH, FLUE GAS AND HEAT. THE ASH IS MOSTLY FORMED BY THE INORGANIC CONSTITUENTS OF THE WASTE AND MAY TAKE THE FORM OF SOLID LUMPS OR POWDER.
TWO (2) YEAR MAINTENANCE SPARES PACKAGE FOR LINE ITEM 2 X OIL FIRED BURNER
Bio waste comes primarily out of hospitals as well as Covid Care Centres and Dedicated Covid Health Care Centres. It includes laboratory waste, gloves …
But a leading anti-incineration campaigner says he fears the plan is a short term measure until it is possible for rubbish to be burned even closer to home …
• A burn rate of 25 – 30kg/hr.
• Consists of two chambers to ensure significant reduction of emissions and be capable of temperatures in the range of 800-1000˚c.
• Incinerator must be of a low maintenance design, be diesel fuelled and need no more than 15 amp 220-250 V power. KW consumption per hour should be stated.
(1) What are main differences between medical incinerators: YD-10C and TS10(PLC)?
(2) After combustion, the medical waste becomes smoke? Without smell? No pollution?
(3) What should we do to release the smoke? Prepare a pipe to direct the smoke to factory outside?
(4) Any operation guide for reference, we worry that it’s difficult to operate?
• The incinerator should also be able to run off a generator.
• The incinerator should have option of tank and should use no more than 12L of diesel fuel per hour to burn 25- 30kg of waste.options for medical waste incineration for Kabul, Afghanistan
• Design must be such to minimize risk to operators and have a simple start sequence to minimize operator training and skills
• Solid waste reductions in the range of 90 – 97% should be routinely achieved.a central thermal treatment station in the city of Khartoum (9 million inhabitants) we started with two units of autoclave that treat up to 18 tons a day so far, and looking forward to add an incineration plant/s to serve for medical, pharmaceutical, and hazardous waste.