TECHNICAL INCINERATORS SPECIFICATIONS FOR 2 hospitals in Kenya

TECHNICAL INCINERATORS SPECIFICATIONS FOR 2 hospitals

 

INTRODUCTION

  • All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal notice No. 121 of 29th September 2006
  • The capacity of the incinerator required should be to the specifications with a capacity to burn 100kgs/Hr
  • The incinerator shall be run on a 3-phase power supply (mains)
  • For the technical evaluation, not only the treatment plant but the entire system will be considered.  It will be the responsibility of the Bidder to supply a full system, including all eventually additionally necessary secondary systems and additional equipment.
  • The system offered shall be designed to operate normally under the conditions of the purchaser’s country. The conditions include Power Supply, Climate, Temperature, Humidity, etc.
  • The Bidder must provide a warranty for one year.
  • All text, parameter etc. on all control operating interfaces as well as on information displays and on print-outs shall be in English language.
  • The Bidder is responsible for all permits and approvals for importation. The Bidder shall provide all the necessary documentation in order to facilitate the legal requirements for the installation and putting into use of the equipment.
  • Period of Execution is 90 days from contract signature for delivery to site and completion of all verification operations required for the issuance of provisional acceptance.
  • Representatives of the Contracting Authority and the Beneficiary, together with the Bidder’s representative, shall carry out the controls, testing and initial approval for provisional and final acceptance as.  The provisional and final acceptance shall take place at the final destination.
  • After-Sales Service: The Bidder is required to ensure that a maintenance, service and repair centre, which is authorised by the Manufacturer, and which is able to rapidly supply genuine spare parts and consumables recommended by the Manufacturer is available throughout the one year warranty period. In fulfillment of this requirement with their offer Bidders must submit a statement signed by a representative of the manufacturer:
    • Providing the name and address of its authorised maintenance, service and repair centre,
    • Confirming that this authorised maintenance, service and repair centre is able to rapidly supply genuine spare parts and the consumables recommended by the Manufacturer; and

 

  • The Bidder will be responsible to deliver and install all to be supplied equipment at to be set up waste handling areas in the Republic of Kenya. The Bidder shall deliver a time schedule over the complete construction and assembling period. The delivery and installation time must be agreed between bidders, target Hospital and the Contracting Authority. The treatment plant must arrive pre-assembled. The Bidder shall ensure that all parts of the plant transported by sea shall not be shipped as “deck cargo”.

 

  • It is expected that the Bidder cooperates closely with the contractor for the new waste handling building/area and will make available all needed technical information, drawing, etc. to the contractor.

 

  • The Bidder shall supply and install the incinerator with the following attached specifications

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

           
TECHNICAL INCINERATORS SPECIFICATIONS FOR EAPHLNP
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerators to Nema standards        
  The following are the incinerator specifications :-        
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste        
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
  Carried Forward To Collection Page.        
 

 

 

NOTE: WE REQUIRE TWO INCINERATORS. ONE        
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

The tank should be connected to the incinerator at a higher level to enable free-flow of diesel from the tank to the incinerator. The connecting pipe must be a black pipe of approved gauge and diameter. Include other accompanying accessories and fittings

Item 1    
C Installation & commissioning works        
D Positioning of Incinerator: –

Provide lifting gears as forklift, gantry, rollers, and lifting jacks and position incinerator.

Item 1    
E Connect burners to fuel supply. No. 2    
F Chimney Installation:        
 G Composition of the chimney: –

Provide a chimney with scrubber (for filtration)

Provide lifting gear to hoist, erect and mount chimney, and provide supports slings as necessary. Allow for cutting of tree branches to facilitate the exercise.

The chimney shall be painted with approved heat resistant paint after installation.

Item. 1    
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1    
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EVALUATION CRITERIA

Evaluation shall be carried out in four stages namely preliminary examination of documents for conformance with mandatory requirements, technical evaluation, site visit and commercial evaluation.

Stage One: Preliminary Examination

– Preliminary Evaluation under special condition of the tender. These are mandatory requirements.

This shall include confirmation that a bidder has complied with the special condition of tender above.

Failure to meet any one of the above requirements stated in the special conditions of the contract shall lead to automatic disqualification.

Stage Two: TECHNICAL EVALUATION (70 MARKS)

 

ITEM DESCRIPTION UNIT QTY MARKS ALLOCATED   MARKS RECEIVED  
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerator to Nema standards        
 

 

The following are the incinerator specifications :-        
           
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste     35  
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

The tank should be connected to the incinerator at a higher level to enable free-flow of diesel from the tank to the incinerator. The connecting pipe must be a black pipe of approved gauge and diameter. Include other accompanying accessories and fittings

Item 1 20  
C Installation & commissioning works        
D Positioning of Incinerator: –

Provide lifting gears as forklift, gantry, rollers, and lifting jacks and position incinerator.

Item 1 10  
E Connect burners to fuel supply. No. 2 5  
F Chimney Installation:        
 G Composition of the chimney: –

Provide a chimney with scrubber (for filtration)

Provide lifting gear to hoist, erect and mount chimney, and provide supports slings as necessary. Allow for cutting of tree branches to facilitate the exercise.

The chimney shall be painted with approved heat resistant paint after installation.

Item. 1 10  
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1 10  
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3 10  
  TOTAL      

100

 

 

Pass mark for technical evaluation is 70/100 marks

 

Stage Three: Site Visit

The evaluation committee will visit the premises of the bidders who are responsive to technical  evaluation stage to verify the authenticity of statutory document submitted; ascertain the accuracy of the information given in the tender documents, assess firm’s capacity, location, among others.

The Tenderer will be automatically disqualified where false or fraudulent Information is found to have been given.

 

Stage 4 Commercial Evaluation

Bids that pass the above three (3) stages shall be compared on the basis of prices / cost quoted and the lowest priced will be considered the lowest evaluated bid and subsequently recommended for award. Prevailing market prices will be used to determine the price responsiveness of the bidders.

 


SECTION V – SCHEDULE OF REQUIREMENTS

 

ITEM

NO

ITEM DESCRIPTION UNIT QTY. REQUIRED UNIT PRICE (KHS) REMARKS
1. Supply, Delivery, installation and commissioning of Incinerator in  

 

 

NO

 

 

 

 

 

 

1

   
2. Supply, Delivery, installation and commissioning of Incinerator  

 

 

NO

 

 

 

 

 

 

1

   

 

 

 

 

Signature of tenderer

 

Note: In case of discrepancy between unit price and total, the unit price shall prevail.

 

SECTION VI – STANDARD FORMS

 

  1. Form of tender
  2. Contract form
  3. Confidential Questionnaire form
  4. Tender security form
  5. Performance security form
  6. Bank guarantee for advance payment
  7. Declaration form

 

 

 

 

Incinerador de agujas (destructores de agujas y jeringas) y micro incinerador para residuos de COVID 19

Incinerador de agujas (destructores de agujas y jeringas) y micro incinerador para residuos de COVID 19.



Solución HICLOVER para combatir COVID-19, incinerador de desechos médicos
Tel: + 86-25-8461 0201
Móvil: + 86-13813931455 (whatsapp / wechat)
Sitio web: http://www.hiclover.com/  
Correo electrónico: [correo electrónico protegido]
Correo electrónico: [correo electrónico protegido]
  
Tecnología médica Co., Ltd. del trébol de Nanjing

21/07/2020

LPG Incinerator

Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:clover

Product Description

Principle of the Incinerator equipment is incineration/combustion/burn. Generally, the function is waste treatment for Solid waste, Liquid waste, Gas waste, etc. 
The main body is one combustion chamber (at least), Refractory line or firebrick, Insulation materials and the outer plate. Ignition element is external oil or gas burner. The burner can be running until waste burnout but for some waste like plastic, paper (sometime, mix coal with waste before feeding), they can combustion itself after Ignition. During combustion, burner is china in a debaye over dioxin emission from waste incineration, is incineration cheap, italian incinerator manufacturer, kenya waste incinerator, has a fan itself for Oxygen supply and also protect burner avoid heat damage from combustion chamber. And, there a external fan blow air into combustion chamber. The Exhaust gas blow out after combustion. 
Considering Environmental Protection requirements and rules, almost all incinerator have secondary combustion chamber (after-burn, post-combustion), even if third combustion chamber. The secondary burner burn the Exhaust gas from primary combustion chamber, this technology make sure sufficient combustion, few black smoke and smell. 
The updated incinerator technology focus on Exhaust gas treatment to remove Hazardous material and other function from incinerator, like heat recovery (waste to energy), save fuel cost, PLC Automation operation. 
In some Developed countries, some new waste treatment method like High-temperature cooking, waste carbonization, crushing sterilization technology is instead of incineration technology.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800–1000 degree 800–1000 degree 800–1000 degree 800–1000 degree 800–1000 degree
2nd. Chamber Temperature 1000-1200 degree 1000-1200 degree 1000-1200 degree 1000-1200 degree 1000-1200 degree
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

Heater YD-100 for Iraq


There are 03 sets Design YD-100 circulation to Iraq between year 2013 to 2014. The heater use for neighborhood a number of structure as well as construction sites in addition to all gas kind is diesel oil.

Items/Model YD-100
Burning Rate (kgs/Hour) 100 kgs/Hr.
Feed Capacity (kgs) 200 kgs
Equipment Weight 5300 kgs
Primary Chamber (Liters) 1200
Secondary Chamber (Liters) 500
External Dimensions (cm) 220x180x360
Internal Dimensions (cm) 130x100x90
Oil Tank(Liters) 300
Door Opening (cm) 55 x 80
Chimney (M) 10
Chimney Type Stainless Steel
Secondary Chamber  YES
Mix-Combustion Chamber YES
Smoke Filter Chamber YES
Combustion Fuel Oil/Gas
Residency Time 2.0 Sec.
Temperature Monitoring YES
1st. Chmaber Temperature 800–1000
2nd. Chmaber Temperature 1000-1200
Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.


Waste Incineration Treatment BURNING PRICE 100-150kgs per hr HICLOVER TS150

Animal diseases, new virus tension and spread of transmittable conditions are only some of the consequences of improper pet waste treatment. Incineration is the way forward for Bio-secure garbage disposal. Contemporary incineration is considered a most efficient option for considerable threat reduction in pet waste management.

General waste is an undesirable refuse product or substance. It might consist of materials from region or home activities (metropolitan, domestic or camp waste) or from industrial activities (manufacturing, mining or farming). Waste incineration nuclear power plant, pet burner, garbage burners, Pet Burner

Worldwide, the issue of waste accumulation is getting to harmful percentages. Landfill alternatives are showing more and more weaknesses and also are ending up being incredibly pricey. They aren’t an efficient service. As a natural process, nature is changing land fill waste right into very hazardous issue.

Hazardous Waste Incinerators

Basic Info.

Export Markets:Global

Additional Info.

Trademark:clover

Product Description

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

We, Clover Medical Limited, Located in China mainland.

fabricants d'incinérateurs

1. PORTÉE DES TRAVAUX Les travaux spécifiés dans le contrat comprendront.
1. Fournir, installer et mettre en service un incinérateur conformément aux spécifications techniques
2. Provision pour le respect de l’OSHA et des autres exigences statutaires relatives à la santé et à la sécurité des travailleurs pendant l’exécution des travaux couverts dans le présent appel d’offres.
3. Évaluation et préparation et construction d’un hangar d’incinérateur standard avec une salle de stockage des déchets (voir la conception)

4. Fourniture de manuels et de dessins d’exploitation et d’entretien avec le calendrier et les instructions d’entretien.

5. Réservoir de stockage de mazout – Acier doux, capacité de 1500 litres

6. Formation sur site pour le personnel d’exploitation et de maintenance.

IMPORTANT
fabricants d’incinérateurs Afin de permettre à l’Employeur d’entreprendre une évaluation concluante de l’offre, les soumissionnaires sont invités à soumettre avec leurs offres les spécifications détaillées, les dessins et les catalogues avec les instructions de mise en service et d’entretien de l’incinérateur qu’ils ont l’intention de fournir, d’installer et de mettre en service. Les soumissionnaires qui ne se conforment pas pleinement à cette exigence verront leur offre rejetée. 2. SPÉCIFICATIONS TECHNIQUES DE L’INCINÉRATEUR REQUIS

2.1 Description générale

La centrale doit avoir quatre sections distinctes qui démontrent trois principes de turbulence, de temps de séjour et de rétention de température. Les sections réglementées peuvent inclure, mais sans s’y limiter:
1. Plan d’ensemble de l’usine
2. Chambre d’alimentation / chargement
3. Chambre de combustion primaire
4. Épurateurs de particules
5. Épurateurs de gaz acides.
6. La cheminée / cheminée.
7. Capacité minimale de la chambre primaire = 0,18 mètre cube
8. Taux de combustion (taux d’incinération des déchets) = au moins 20 kg par heure
9. Doit avoir une porte de chargement à contrepoids pleine largeur permettant un accès facile à la chambre principale pour le chargement et le retrait des cendres.
Fourniture, installation et mise en service d’un incinérateur dans les Hydros de l’Est [Page 28

2.2 Alimentation et chargement
Une alimentation mécanique hygiénique contrôlée qui n’influence pas négativement la température de l’air dans les chambres primaire et secondaire de l’incinérateur doit être utilisée.
2.3 Chambre de combustion primaire.

a) Cette chambre doit être équipée de brûleurs utilisant un combustible à faible teneur en soufre.
b) La chambre doit garantir une température de sortie minimale de 850 degrés centigrades.

2.4 Chambre de combustion secondaire (après le brûleur)

a) Doit être équipé de brûleurs utilisant un combustible à faible teneur en soufre.
b) Assurez-vous que l’alimentation en air secondaire est contrôlée.
c) Assurez-vous que le temps de séjour n’est pas inférieur à deux secondes.
d) Assurez-vous que la température du gaz mesurée contre la paroi intérieure de la chambre secondaire et non dans la zone de flamme n’est pas inférieure à 1100 degrés centigrades.
e) Assurez-vous que la teneur en oxygène émis des gaz émis n’est pas inférieure à 11%
f) S’assurer que les températures de combustion primaire et secondaire sont maintenues jusqu’à ce que tous les déchets soient complètement brûlés.

2.5 Éliminateurs de particules

Un collecteur de particules mécanique doit être incorporé après la chambre de combustion secondaire pour l’élimination des particules polluantes entraînées dans le flux de gaz de combustion. Les collecteurs de particules peuvent comprendre l’un quelconque des éléments suivants ou une combinaison de ceux-ci:
a) Séparateur cyclone
b) précipitateurs électrostatiques
c) Filtres en tissu
2.6 Cheminée / pile

l) La cheminée doit avoir une hauteur minimale de 10 mètres au-dessus du niveau du sol et dégager le point le plus élevé du bâtiment d’au moins 3 mètres pour tous les toits. La topographie et la hauteur des bâtiments adjacents dans un rayon de 50 mètres doivent être prises en compte.
m) La cheminée doit être visible pour l’opérateur depuis la zone d’alimentation.
n) La vitesse de sortie minimale doit être de 10 mètres par seconde et au moins deux fois la vitesse du vent environnant (vitesse d’efflux = vitesse du vent x 2), la valeur la plus élevée étant retenue pour garantir l’absence de lavage vers le bas des gaz sortants.
o) Le point de mesure des émissions doit être fourni.

2.7 Instrumentation

a) Un instrument de détermination de la température de la paroi intérieure et non de la température de la flamme du brûleur doit être fourni pour les chambres primaires et secondaires.
b) Une alarme sonore et visible doit être installée pour avertir l’opérateur lorsque la température de la chambre secondaire descend en dessous de la température requise.
c) Un compteur / enregistreur de monoxyde de carbone et d’oxygène doit être fourni

d) Un densimètre / enregistreur de fumée devrait être fourni.
e) Un compteur / enregistreur de particules solides devrait être fourni.
f) Tout autre instrument jugé nécessaire.

2.9 Limites d’émission

a) L’efficacité de combustion (CE) doit être d’au moins 99,00% où CE =% de dioxyde de carbone x 100 / [% de dioxyde de carbone + monoxyde de carbone]
b) La température de la chambre primaire doit être de 800 +/- 50 degrés centigrades
c) Le temps de séjour du gaz dans la chambre secondaire doit être d’au moins 1 seconde à 1050 +/- 50 degrés centigrades avec 3% d’oxygène dans le gaz de cheminée.
d) L’opacité de la fumée ne doit pas dépasser 20% vue à 50 mètres à l’œil nu.
e) Toutes les émissions dans l’air autres que la vapeur ou la vapeur d’eau doivent être inodores et exemptes de brouillard, de fumée et de gouttelettes.
f) Une efficacité de destruction et d’élimination (DRE) de 99,99% pour chaque principal constituant organique dangereux (POHC) dans l’alimentation des déchets où DRE [(Win – Wout) / Win] x 100 où Win = taux d’alimentation massique du POHC dans les déchets flux alimenté à l’incinérateur et Wout = taux d’émission massique de POHC dans la cheminée avant le rejet dans l’atmosphère.
g) La concentration moyenne de dioxines et de furanes dans l’émission ne doit pas dépasser 80 mg / m3 de dioxines et furanes totaux si elle est mesurée pendant une période de 6 à 16 heures.

– La surveillance technique manuelle est livrée avec le matériel avec toutes les explications des pannes et des résolutions
Capacité / île: 4000 kg / jour; 25000 kg / jour; 31000 kg / jour; 48000 kg / jour

Température de combustion – plus de 12000C

Deux chambres – minimum

Émissions – dioxine et métaux lourds – mieux que le protocole de Kyoto

Système de surveillance des émissions

Élimination des déchets – directement du chemin des déchets à l’incinérateur

Beijing BOE

2019-05-16 Pencapaian dan Kes262 paparan

Penapis udara penggulungan automatik BOE BOE

Nama Projek: Penapis Udara Roller Blind Automatik BOE BOE

Pengenalan Projek: Penapis utama bahagian depan udara segar

Masa Pengambilan: 2015.5, 2016.8

Syarikat terkemuka di dunia dalam bidang paparan semikonduktor

Pakar industri dalam penyelesaian paparan serba boleh

BOE Technology Group Co., Ltd. (BOE) ditubuhkan pada bulan April 1993. Perniagaan utamanya merangkumi peranti paparan, sistem pintar, dan perkhidmatan kesihatan. Ia merupakan penyedia teknologi, produk dan perkhidmatan Internet of Things. Produk digunakan secara meluas dalam telefon bimbit, komputer tablet, komputer notebook, monitor, TV, kenderaan, paparan maklumat digital, penjagaan kesihatan, aplikasi kewangan, peranti yang boleh dipakai dan bidang lain.
BOE mematuhi konsep inovatif “teknologi terkemuka, debut global, dan penciptaan bersama nilai”. Pada tahun 2015, kadar liputan produk pertama di dunia adalah 39%, jumlah tahunan permohonan paten baru adalah 6,156, dan jumlah paten yang boleh digunakan melebihi 40,000, berada di kedudukan teratas dalam industri global. Sebagai tambahan, bahagian pasaran panel telefon bimbit dan tablet PC BOE berada di kedudukan pertama di dunia.
Pada masa ini, BOE mempunyai barisan pengeluaran TFT-LCD generasi ke-5 dan ke-8 di Beijing, barisan pengeluaran TFT-LCD generasi ke-4,5 di Chengdu, barisan pengeluaran TFT-LCD generasi ke-6 dan barisan pengeluaran TFT-LCD generasi ke-8 di Hefei, dan barisan pengeluaran TFT-LCD generasi ke-5 di Ordos. 7 barisan pengeluaran termasuk barisan pengeluaran AMOLED, barisan pengeluaran TFT-LCD generasi ke-8 Chongqing, dan satu barisan pengeluaran AMOLED generasi ke-6 Chengdu dalam pembinaan, satu TFT generasi ke-8 Fuzhou -Lini pengeluaran LGD dalam pembinaan, dan satu barisan generasi tertinggi global yang sedang dibina -Lini pengeluaran TFT-LCD generasi ke-10 di Hefei.
BOE mempunyai banyak pangkalan pembuatan di Beijing, Chengdu di Sichuan, Hefei di Anhui, Ordos di Mongolia Dalam, Chongqing, Gu’an di Hebei, Suzhou di Jiangsu, Xiamen di Fujian dan tempat-tempat lain, dan sistem pemasaran dan perkhidmatannya meliputi wilayah global utama seperti Eropah, Amerika, dan Asia.

Lebih banyak URL kandungan: www.ecolead.cn Tel: 025-57138032

Newsletter – incinerator

Newsletter – incinerator

Google
incinerator
Medical Waste Incinerators 2020年2月4日
www.imcha.net
Nanjing Clover Medical Technology Co.,Ltd.
Tel: +86-13813931455(WhatsApp)
Website: www.hiclover.com
Add: Gangjia Zhihui Industrial Area, Xin Gangwan Rd. Liuhe, Nanjing, China 211500
HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification. Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
EAST LIVERPOOL — East Liverpool residents are no closer to answers regarding a hazardous waste incinerator than they were six months ago.
Facebook Twitter 标记为不相关
Health Minister Carvin Malone said the device — whose function is to filter the noxious fumes being emitted from government’s incinerator in …
Facebook Twitter 标记为不相关
查看更多结果 | Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
发送反馈
Newsletter
|
RSS 以RSS Feed的形式接收此快讯

 

江蘇任天食品公司於我司採購的雙吹風淋室順利交貨

2019年05月18日 公司新聞 394 views

風淋室在食品冷鏈物流和食品保鮮存儲行業的應用-江蘇任天農業科技股份有限公司

風淋室,風淋房,吹淋房,風淋門,浴塵室、吹淋室…設計方案,可以按實際需要拼裝成各種長度的風淋尺,1400標準技術參數風淋室: 
項目 單人雙吹風淋室 雙人雙吹流風淋室 多人雙吹流風淋室
外形尺寸(W×D×H)(mm) 1400×1000×2180 1400×2000×2180 1400×3000×2180
內部尺寸(W×D×H)(mm) 790×930×1910 790×1930×1910 790×2930×1910
適合人數 1-2人 2-4人 3-6人

江蘇任天農業科技股份有限公司(以下簡稱“任天科技”)於2015年成立,坐落在有“六 朝古都”之稱的江蘇南京,是以國內外領先的“鮮活微凍保鮮技術”(以下簡稱“鮮凍技術”)為核心價值,以產業基地、健康食品產業園、保健產業投資為核心業 務,致力於將鮮凍技術運用於產業,推動農業科技發展的實體企業。

作為農業科技企業,任天和中國農業科學院、中國農業大學、中國農民大學、北京農學院等國 內多家專業科研機構、院校形成戰略合作夥伴關係,並成立了自己的農業科學研究院和鮮活微凍保鮮技術研發中心。科技創新領域持續投入的成果,是任天科技成功 發明了國際領先國內獨創的“鮮凍技術”核心科技,在食品保鮮技術、冷鏈物流等領域擁有核心競爭力。

在食品產業鏈中,保鮮環節直接關係到食品安全。任天科技所擁有的專利——“鮮凍技術”攻 克了保鮮的難題,解決了食品既鮮美又長久保存的問題,在國際上獲得了至高的評價。“鮮凍技術”的原理是使被凍食品內細胞膜不被凍裂,生物體處在微凍狀態, 從而保存生命體。具體是採用高科技生物技術,在鮮凍機中模擬可控的快速降溫的自然環境,研究生物體在低溫情況下的冰結晶狀態,應用新發明的純天然成分的鮮 凍液,對被凍的鮮果蔬菜肉類採用創新的凍結曲線,在鮮凍液中直接凍結,使產品的溫度達到零下七度不結冰。

如此,經鮮活微凍的果蔬、水產、肉類食品,經長時間儲藏、運輸后,仍能保持鮮活品質,解決了農產品流通、加工、銷售等環節的安全保鮮問題。作為任天科技的核心技術,“鮮凍技術”達到了目前食品保鮮領域的國際領先水平。

更多內容 網址: www.ecolead.cn 電話: 025-57138032