Documents to be submitted as following ;

  • Fabricators accreditations
  • Test report to prove ZERO harmful emission level provided as samples form other installations
  • Test report to prove sterility achieved at 6log to 10 level to be provided upon commissioning report and validation.

 

Technical proposal include:

  • The hospital should provide the necessary space: building & infrastructure, sufficient power steam supply and

connection up to room water & sewage line to the room

  • Room preparation: preparation, Renovation & Modification of the room is suppliers responsibility
  • The supplier should submit the necessary drawing showing space requirements ( room size (LxWxH) dimensions of

processors & ancillary equipment

  • Supplier must give the proposal of the total power requirement of the whole unit and on which the hospital will

ensure the power supply. However connections inside the room is suppliers responsibility

  • The connection/fittings form the processor and ancillary equipment to water and sewage line is suppliers

responsibility.

  • A detailed training proposal including the duration of staff training on how to operate and maintain the processor
  • A detailed maintenance schedule.
  • List of spare parts and accessories required for maintenance of the system

 

Warranty & After Sales Services:

  • Warranty period will be minimum 03 years or as offered by the manufacturer which comes later.
  • Warranty period will be counted from the date of handing over of machine over of machine to the user in functioning

condition i.e date of commission.

  • In warranty period supplier have to provided all maintenance & repair services.
  • Breach time will not be counted in warranty period.
  • At least 10 years back up service (including warranty period) has to be ensured by the supplier.
  • The repair/maintenance work should be carried out within 72 hours after getting request for such from the user.

 

Quality standard: CE/FDA certificate of the offered item must be submitted with the offer.

  • For verification of the certificate bidder must submit the following :
  1. i) Mailing address of the issuer of the certificate.
  2. ii) Website, Email address & Fax & Telephone Number of the issuer.
  • The bid will be non-responsive if:
  1. i) The certificate issuer can not be reached
  2. ii) The issuer fails to authentic the certificate within the bid validity

iii)   The issuer confirms that the submitted certificate is defective in terms of authenticity or validity.

Heater YD-100 for Iraq



There are 03 sets Design YD-100 circulation to Iraq between year 2013 to 2014. The heater use for neighborhood a number of structure as well as construction sites in addition to all gas kind is diesel oil.

Items/Model YD-100
Burning Rate (kgs/Hour) 100 kgs/Hr.
Feed Capacity (kgs) 200 kgs
Equipment Weight 5300 kgs
Primary Chamber (Liters) 1200
Secondary Chamber (Liters) 500
External Dimensions (cm) 220x180x360
Internal Dimensions (cm) 130x100x90
Oil Tank(Liters) 300
Door Opening (cm) 55 x 80
Chimney (M) 10
Chimney Type Stainless Steel
Secondary Chamber  YES
Mix-Combustion Chamber YES
Smoke Filter Chamber YES
Combustion Fuel Oil/Gas
Residency Time 2.0 Sec.
Temperature Monitoring YES
1st. Chmaber Temperature 800–1000
2nd. Chmaber Temperature 1000-1200
Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.


TECHNICAL INCINERATORS SPECIFICATIONS FOR 2 hospitals in Kenya

TECHNICAL INCINERATORS SPECIFICATIONS FOR 2 hospitals

 

INTRODUCTION

  • All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal notice No. 121 of 29th September 2006
  • The capacity of the incinerator required should be to the specifications with a capacity to burn 100kgs/Hr
  • The incinerator shall be run on a 3-phase power supply (mains)
  • For the technical evaluation, not only the treatment plant but the entire system will be considered.  It will be the responsibility of the Bidder to supply a full system, including all eventually additionally necessary secondary systems and additional equipment.
  • The system offered shall be designed to operate normally under the conditions of the purchaser’s country. The conditions include Power Supply, Climate, Temperature, Humidity, etc.
  • The Bidder must provide a warranty for one year.
  • All text, parameter etc. on all control operating interfaces as well as on information displays and on print-outs shall be in English language.
  • The Bidder is responsible for all permits and approvals for importation. The Bidder shall provide all the necessary documentation in order to facilitate the legal requirements for the installation and putting into use of the equipment.
  • Period of Execution is 90 days from contract signature for delivery to site and completion of all verification operations required for the issuance of provisional acceptance.
  • Representatives of the Contracting Authority and the Beneficiary, together with the Bidder’s representative, shall carry out the controls, testing and initial approval for provisional and final acceptance as.  The provisional and final acceptance shall take place at the final destination.
  • After-Sales Service: The Bidder is required to ensure that a maintenance, service and repair centre, which is authorised by the Manufacturer, and which is able to rapidly supply genuine spare parts and consumables recommended by the Manufacturer is available throughout the one year warranty period. In fulfillment of this requirement with their offer Bidders must submit a statement signed by a representative of the manufacturer:
    • Providing the name and address of its authorised maintenance, service and repair centre,
    • Confirming that this authorised maintenance, service and repair centre is able to rapidly supply genuine spare parts and the consumables recommended by the Manufacturer; and

 

  • The Bidder will be responsible to deliver and install all to be supplied equipment at to be set up waste handling areas in the Republic of Kenya. The Bidder shall deliver a time schedule over the complete construction and assembling period. The delivery and installation time must be agreed between bidders, target Hospital and the Contracting Authority. The treatment plant must arrive pre-assembled. The Bidder shall ensure that all parts of the plant transported by sea shall not be shipped as “deck cargo”.

 

  • It is expected that the Bidder cooperates closely with the contractor for the new waste handling building/area and will make available all needed technical information, drawing, etc. to the contractor.

 

  • The Bidder shall supply and install the incinerator with the following attached specifications

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

           
TECHNICAL INCINERATORS SPECIFICATIONS FOR EAPHLNP
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerators to Nema standards        
  The following are the incinerator specifications :-        
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste        
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
  Carried Forward To Collection Page.        
 

 

 

NOTE: WE REQUIRE TWO INCINERATORS. ONE        
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

The tank should be connected to the incinerator at a higher level to enable free-flow of diesel from the tank to the incinerator. The connecting pipe must be a black pipe of approved gauge and diameter. Include other accompanying accessories and fittings

Item 1    
C Installation & commissioning works        
D Positioning of Incinerator: –

Provide lifting gears as forklift, gantry, rollers, and lifting jacks and position incinerator.

Item 1    
E Connect burners to fuel supply. No. 2    
F Chimney Installation:        
 G Composition of the chimney: –

Provide a chimney with scrubber (for filtration)

Provide lifting gear to hoist, erect and mount chimney, and provide supports slings as necessary. Allow for cutting of tree branches to facilitate the exercise.

The chimney shall be painted with approved heat resistant paint after installation.

Item. 1    
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1    
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EVALUATION CRITERIA

Evaluation shall be carried out in four stages namely preliminary examination of documents for conformance with mandatory requirements, technical evaluation, site visit and commercial evaluation.

Stage One: Preliminary Examination

– Preliminary Evaluation under special condition of the tender. These are mandatory requirements.

This shall include confirmation that a bidder has complied with the special condition of tender above.

Failure to meet any one of the above requirements stated in the special conditions of the contract shall lead to automatic disqualification.

Stage Two: TECHNICAL EVALUATION (70 MARKS)

 

ITEM DESCRIPTION UNIT QTY MARKS ALLOCATED   MARKS RECEIVED  
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerator to Nema standards        
 

 

The following are the incinerator specifications :-        
           
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste     35  
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

The tank should be connected to the incinerator at a higher level to enable free-flow of diesel from the tank to the incinerator. The connecting pipe must be a black pipe of approved gauge and diameter. Include other accompanying accessories and fittings

Item 1 20  
C Installation & commissioning works        
D Positioning of Incinerator: –

Provide lifting gears as forklift, gantry, rollers, and lifting jacks and position incinerator.

Item 1 10  
E Connect burners to fuel supply. No. 2 5  
F Chimney Installation:        
 G Composition of the chimney: –

Provide a chimney with scrubber (for filtration)

Provide lifting gear to hoist, erect and mount chimney, and provide supports slings as necessary. Allow for cutting of tree branches to facilitate the exercise.

The chimney shall be painted with approved heat resistant paint after installation.

Item. 1 10  
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1 10  
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3 10  
  TOTAL      

100

 

 

Pass mark for technical evaluation is 70/100 marks

 

Stage Three: Site Visit

The evaluation committee will visit the premises of the bidders who are responsive to technical  evaluation stage to verify the authenticity of statutory document submitted; ascertain the accuracy of the information given in the tender documents, assess firm’s capacity, location, among others.

The Tenderer will be automatically disqualified where false or fraudulent Information is found to have been given.

 

Stage 4 Commercial Evaluation

Bids that pass the above three (3) stages shall be compared on the basis of prices / cost quoted and the lowest priced will be considered the lowest evaluated bid and subsequently recommended for award. Prevailing market prices will be used to determine the price responsiveness of the bidders.

 


SECTION V – SCHEDULE OF REQUIREMENTS

 

ITEM

NO

ITEM DESCRIPTION UNIT QTY. REQUIRED UNIT PRICE (KHS) REMARKS
1. Supply, Delivery, installation and commissioning of Incinerator in  

 

 

NO

 

 

 

 

 

 

1

   
2. Supply, Delivery, installation and commissioning of Incinerator  

 

 

NO

 

 

 

 

 

 

1

   

 

 

 

 

Signature of tenderer

 

Note: In case of discrepancy between unit price and total, the unit price shall prevail.

 

SECTION VI – STANDARD FORMS

 

  1. Form of tender
  2. Contract form
  3. Confidential Questionnaire form
  4. Tender security form
  5. Performance security form
  6. Bank guarantee for advance payment
  7. Declaration form

 

 

 

 

Burner YD-500 for Vietnam



We finish this project in year 2010 to 2011 and also distribution to Hochiminh port, Vietnam with 1×× 40′ feet open leading full container.

Items/Model YD-500
Burning Rate (kgs/Hour) 500 kgs/Hr.
Feed Capacity (kgs) 800 kgs
Equipment Weight 13000 kgs
Primary Chamber (Liters) 4000
Secondary Chamber (Liters) 1500
External Dimensions (cm) 320x220x460
Internal Dimensions (cm) 257x147x108
Oil Tank(Liters) 500
Door Opening (cm) 108 x 128
Chimney (M) 14
Chimney Type Stainless Steel
Secondary Chamber  YES
Mix-Combustion Chamber YES
Smoke Filter Chamber YES
Combustion Fuel Oil/Gas
Residency Time 2.0 Sec.
Temperature Monitoring YES
1st. Chmaber Temperature 800–1000
2nd. Chmaber Temperature 1000-1200

Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.


A MOBILE MEDICAL WASTE INCINERATORS



Key Product Checklist

Main Burning Chamber

Additional Combustion Chamber

Mix-Combustion Chamber

Smoke Filter Chamber

Incinerator Control Circumstance

Smokeshaft:5.0 Meters *( upgrade to Stainless Steel, cost-free cost)

Italy oil burner: 02 collections

Oil Storage Tank: 150Liters

Mobile Trailer for Incinerator

















Version

YD-50C

Burning Price (kgs/Hour)

Typical 20-50 kgs/hour

Feed Ability (kgs)

Typical 80 kgs/feeding

Instruments Weight

2500 kgs( Burner)

Primary Chamber (Liters)

400

2nd Chamber (Liters)

140

Outside Dimensions (centimeters)

180x160x200

Inner Dimensions (centimeters)

70x70x85

Oil Tank( Liters)

150

Door Opening (centimeters)

45×× × × 55

Chimney (M)

5

Smokeshaft Kind

Stainless Steel

Additional Chamber

YES

Mix-Combustion Chamber

YES

Smoke Filter Chamber

YES

Combustion Fuel

Oil

Residency Time

2.0 Sec.

Temperature Degree Keeping An Eye On

YES

1st.

800 ℃–– -1000 ℃

2nd. Chamber Temperature

1000 ℃ -1200 ℃

Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.


smart ash incinerator

(G) Technical Specifications of Spore tester Features and Specifications :

  • It is an auto reader for Bacillus Stearothermophilus to test the spore discharge after treatment (sterilization) of

the waste.

  • should be a very Accurate, reliable and easy-to-use units for reading rapid readout biological indicators (RRBI) for

steam sterilizer

  • Automatically reads indicator results.
  • There should be red plus (+) light to indicate sterilization failure and a green negative (-) light to confirm that

the sterilization conditions have been met.

  • Audible alarm in case of positive result detected and RRBI is removed from the reader before final results have been

detected.

  • There should also be a Buzzen alarm OFF button.
  • The unit should be maintenance-free equipment and there should not be any light bulbs to replace for maintenance.
  • At least 12 Incubation/reader wells
  • A crushing well
  • Digital display
  • A press-button by pressing which the incubation time remaining for each individual incubation/reader well that

contains a RRBI will be displayed.

  • Power: 220 VAC, 50Hz

 

Accessories to be included;

  • Samples/kits-100 pcs

Family pet incinerator for pig ranch Typical 100 kgs per human resources



Model

A1500 (customer made design)

Interior Measurements

150 x 100 x 96cm

Suitable For Family Pet

Feline – – – – yes

– Pet pet dog – yes

– Pig – yes

Cow – no

Secret Thing Listing

Primary Combustion Chamber

Second Burning Chamber

Mix-Combustion Chamber

Damp Scrubber( Laundering Tower)( Optional Part)

Incinerator Control Circumstance

Smokeshaft:10.0 Meters *( upgrade to Stainless-steel, cost-free cost)

Italy oil heating unit: 03 sets

Oil Container: 500Liters

Optional Component

Movable system & & & & Vehicle. Door and additionally Independent air supply system at lower













Burning Price

Regular 100 kgs/hour

Feed Capacity

Requirement 150 kgs/feeding

Key Combustion Chamber

1500 Liters

Second Burning Chamber

500 Litres

Mix Combustion Chamber

Yes

Smoke Filter Chamber

Yes( Damp Scrubber) (optional)

Feed Establishing

Manual

Voltage

380V

Gas Kind

Diesel Oil

Heater

Italy Original

Oil Consumption (Diesel Oil)

Typical 53 kg/hour

Gas Usage (Natural Gas)

***

Inner Measurements

150 x 100 x 96cm (key chamber)

Exterior Dimensions

240 x 170 x 380cm (without chimney)

Temperature Level Degree Present

Yes

Oil Tank Capacity( if oil gas)

500 Litres

Door Opening

90 x 80cm

Smokeshaft Dimension

10.0 Meters

Smokeshaft Kind

Stainless-steel

Devices Gross Weight

9000 kgs

Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.


3 Chamber Incinerator

Primary chamber:
Heavy duty mild steel casing, High quality Refractory lining and insulation 01 x natural gas ignition burners (automatic)  01 x temperature sensor points with complete internal fans.
Secondary Chamber:
Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas burners (automatic) with complete 01 internal fans. 02 Sec gas residence times.
Third Chamber:
Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas ignition burners (automatic) with complete internal fans. 02 Sec gas residence time.
Integrated dual flu gas washer:

Resultant gasses passed through dual gas filtration system for maximum clean emission. It is also equipped with chain filters.
Chimney:
Heavy duty 5mm or more stainless steel casing mild steel casing.
Stack cap/spark arrestors.
Control Panel:
a.Temperature Monitoring with 4 digit display.
b.Thermostat control device for burner (fuel saver)
c.Temperature control 0-12 hours.
d.Integral fan timer control

incinerator manufacturers

GOODS:  ONE INCINERATORS IN ACCORDANCE WITH THE   SUPPLIER’    
REQUIREMENT     S OWN    
        PROPOSED    
           
        SPECIFICA    
        TION/      
        CONFIRM    
        ATION    
        SPECS    
  Height from base: 11m and if there are buildings within 30m of the          
  incinerator, chimney must extend at least 3m above the apexes of all          
  the roofs of such buildings            
  Diameter of chimney at top: 430mm          
  Weight of stack: ± 500kg            
  case and stack be painted with 400 °C heat resistant black paint          
  Burners            
  1st chamber 850 oC -900oC            
  2nd chamber 1000oC            
  Variable speed combustion air blowers          
  Primary chamber volume ±1.05 cubic metres          
  Mixing chamber volume ±0.30 cubic meters          
  Settling chamber volume ±0.89 cubic meters          
  Weight excluding chimney ±6 400kg at manufacture          
  Firing tools supplied: Hoe, poker and rake          
  Dimensions            
  Length ±2 125mm            
  Width ±1 890mm            
  Height  ±2 125mm            
  Extra width for burners ±1 000mm          
  Loading door opening 610mm×540mm          
  Hearth area ±1.19 square metres          
  Description of grate/hearth: A full hearth to be supplied to prevent          
  contaminated  liquids  from  flowing  into  ash  pit  without  being          
  incinerated            
  Compliance with South African Atmospheric Pollution Prevention          
  Act No. 45 of 1965 or equivalent air pollution standard          
  Documents to be supplied : Operations and maintenance manual and          
  standard operating procedures (SOPs)          
  Emission controls:            
  heated refractory screen            
  Low velocity grit settling chamber          
  Stainless steel arrester screen            
  Refractory material: alumina content ≥49% and thickness average          
  102mm            
  Bake out: to be done over 2-3 days          
  Materials of construction            
  Case: 5mm mild steel            
  Bracing: heavy angle and channel          
  Hearth: 1550 °C            
  Ashing door: high grade cast iron          
  Loading door 5mm mild steel lined with 1550 °C castable general          
  purpose high strength, high abrasion resistant monolithic refractory          
  concrete            
    36        

3 Chamber Incinerator

Primary chamber:
Heavy duty mild steel casing, High quality Refractory lining and insulation 01 x natural gas ignition burners (automatic)  01 x temperature sensor points with complete internal fans.
Secondary Chamber:
Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas burners (automatic) with complete 01 internal fans. 02 Sec gas residence times.
Third Chamber:
Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas ignition burners (automatic) with complete internal fans. 02 Sec gas residence time.
Integrated dual flu gas washer:

Resultant gasses passed through dual gas filtration system for maximum clean emission. It is also equipped with chain filters.
Chimney:
Heavy duty 5mm or more stainless steel casing mild steel casing.
Stack cap/spark arrestors.
Control Panel:
a.Temperature Monitoring with 4 digit display.
b.Thermostat control device for burner (fuel saver)
c.Temperature control 0-12 hours.
d.Integral fan timer control