health center burner design



INCINERATEUR DE DECHETS HOSPITALIER health center incinerator format

SPECS TECHNIQUES.
Capacité harmful de 55 Kg/h jour de déchets hospitaliers avec un p?. c. i jusqu’ à 3.200 Kcal/Kg
1) Kind de déchet

hospitalier
2) Pouvoir calorifique inférieur 3.200 kcal/kg
3) Humidité 20%.
4) Teneur en cendres et/ou inertes 8%.
5) Capacité harmful nominale 55 kg/h.
6) Quantity chambre de burning 1,65 m3.
7) Amount chambre postcombustion 2.1 m3.
8) Temps transportation des fumées en message burning/ sec.

13) Flammable prévu Gasoil.
14) Br?leur en chambre de combustion nbr?: 1.
15) Br?leur en chambre de postcombustion nbr?: 2

CONSTITTUTION DE L’APPAREIL.
1. CHARGEMENT.
Système de chargement hydraulique afin de pouvoir battery charger le 4 en toute sécurité même durant child fonctionnement et

aussi assurer la puissance devastating globale de 450 kg/j?
Le système comprend?:.
1-1Trémie de chargement de forme parallélépipédique de 0,5 m3 de volume, réalisée en t?le d’acier, bridés sur la paroi

frontale de la chambre de burning et munie d’un couvercle à charnières actionné par vérin hydraulique?.
Dimensions?:.
oLongueur 1200 mm.
oHauteur 700 mm.
oLargeur 600.
1-2Un poussoir hydraulique assurera le chargement de la chambre de combustion.
1-3 Une porte de chargement de la chambre de combustion constituée d’une guillotine à vérin hydraulique revêtue

de réfractaire.
1-4Un main hydraulique put piloter tous les vérins de commande, comprenant?: réservoir, pompe, électrovannes et

tuyauteries

2. CHAMBRE DE COMBUSTION PRIMAIRE

2-1- Le bati est une structure métallique cylindrique revêtue intérieurement d’une couche d’isolant et d’une

couche de réfractaire.
2-2-Volume intérieur?: 1,65 m3.
2-3-Aménagement.
? portillon de décharge des cendres?: frontal?; monté sur double charnière et revêtu de réfractaire avec hublot

d’inspection.
? La connexion à la chambre de chargement est revêtue de réfractaire.
? La connexion de la chambre de combustion et de la chambre de article combustion est revêtue de réfractaire.
? Setup des bruleurs.
? Setup du système de circulation de l’air comburant.
? Installment des sondes de mesure de la température.
? Le bac de récolte des cendres est en acier au carbone sur roulettes, équipé de racloir métallique permettant

l’évacuation manuelle des cendres.
3. BRULEUR DE LA CHAMBRE DE COMBUSQTION.
Un bruleur de kind à une flamme à l’air soufflé, alimenté the same level gasoil, équipé des dispositifs de sécurité Puissance

thermique installée 165 KW.
4. AIR COMBURANT.
Le système de distribution et dosage de l’air primaire en chambre de burning comprend?:.
? Ventilateur centrifuge.
? Canalisations de distribution air.
? Systéme de circulation d’air à 2 canaux.
? Soupape de régulation de l’air motorisé selon les phases de cycle de fonctionnement et de la température

5. CHAMBRE DE POST BURNING.
5-1- Chambre de article burning est installée au dessus du foyer de combustion, elle est constituée d’un

cylindre métallique revêtu intérieurement d’une couche d’ isolant et d’une couche de matériaux réfractaires.
5-2- Volume intérieur?: 2,1 m3.
Est dimensionnée put pouvoir garantir un temperatures de fumée de 2 secondes à 1100 ° C avec un pourcentage d’oxygène libre

d’au moins 6 %.
5-3 -Accessoires.
? Trappe de visite boulonnée frontal put permettre l’inspection périodique.
? La intermediary à la chambre de burning est tapissée de réfractaire.
? Setup les br?leurs.
? Installation des sondes de mesure température.
6. MANUFACTURING DE L’AIR COMBURANT DE LA CHAMBRE DE POST COMBUSTION.
? Ventilateur centrifuge.
? Tuyauteries de distribution d’air.
? Série de vannes de circulation d’air.
? Soupape de régulation de l’air soufflé asservi par la sonde du débit d’ oxygène

7. BRULEUR DE LA CHAMBRE DE MESSAGE COMBUSTION.
Sont prévus 2 br?leurs du type à l’air soufflé au gasoil équipés des dispositifs de sécurité.
A la mise en route du four les deux br?leurs sont allumés pour assurer la température minimale d’au moins 1100 ° C?;

ils restent en marche successivement pour maintenir la température constante.
Puissance thermique installée (290 + 350) KW.

8. CHEMINEE D’EVACUATION.
Constitué the same level un avenue métallique vertical de 8 m de long installée au-dessus de la chambre de COMPUTER, diamètre 630 mm

en t?le d’acier au carbone avec garnissage intérieur en réfractaire

9. ARMOIRE ELECTRIQUE DE COMMANDE ET GUIDELINE.
Composée de?:.
? Circuit 380 V- 50 HZ-3 stages.
? Voyant sous stress.
? Commande d’arrêt général.
? Voyant état des bruleurs.
? Affichage des températures des deux chambres.
? Minuterie des temps des cycles.
? Une variation des vitesses des ventilateurs.
? Le tableau et les cablages sont prévus aux règles CEI avec security IP 55.
? Microprocesseur put le contr?le et la régulation des températures, ainsi que les cycles d’opération.
? Cablages réalisés selon les règles CEI.

10. INSTRUMENTATION DE CONTROLE ET DE MESURAGE CONTINU.
Les dispositifs suivants sont prévus?:.
1) Thermocouples pour la mesure de la température en chambre de combustion? et postcombustion, à la sortie de

l’échangeur dans la area d’entrée du filtre.
2) Système de mesure de la concentration d’oxygène dans les fumées humides a la sortie de la chambre de postcombustion

constitué de?:.
? Sonde de mesure de l’oxygène à l’oxyde de zirconium.
? Pompe à la membrane.
? débitmètre



family pet dog incinerator up for sale



1. Capability of damage in weight: 60 Kg/h.
2. It should be able to run very little less than 10 hours/day
3. This burner needs to have the ability to destroy all combustible wastes created by healthcare facilities, unique centers, research laboratories, institutes, and so forth.
4. Style Requirements: Kinds A, B, C, D, as well as E of clinical waste
5.” PYROLYTIC” burning, by taking care of the gasification of waste.
6. The burner needs to remain clear of the release of black smoke as well as likewise fantastic dust, throughout the loadings.
7. It must have the capacity to minimize the volume of wastes by 98%.
8. It should certainly be able to hold discharge in the 2nd shed with gas house of not much less than 2 secs.
9. The incineration must be entirely without noticeable smoke in addition to upseting odours.
The minimized calorific power (L.C.P) of this waste will be 3,500 kcal/kg
? The Temperature levels of burning: Minimum will be 850oC as well as likewise max 1400oC
?
The Quantity of the burning chamber: 1.200 L.
13. The Measurement of the door for filling in cm: 70 × 70.
14. Heater procedure need to be Automatic On/Off.
15. Fuel: diesel.
16. The company needs to supply needed details for the best of the installment.
This heater with “PYROLYTIC” burning need to have:.
17. A burning chamber of waste:.
* Totally restricted door for the hands-on loading of waste. The loading must be Manual, Set Lots.
* A heater of lighting which the usage is restricted to the ignition of waste.
* Frontage of loading with door seals boosted on joints, wheel of screw plug, versatile joint, as well as also loading protecting out of refractory.



medical incinerators



* scientific burners, The insulation of the burning chamber require to be made up of refractory bricks, having a.
high web content of aluminium and likewise protects bricks in order to make sure a minimum temperature level on.
the outdoors sheet metal.
* Structure of the refractory;

? Refractory concrete:.
?. Density: ≥ 100 mm.
?. Nature: 42% of Al203.
? Safeguard in coarse panels:.
?. Thickness: ≥ 75 mm.
? Nature: Calcium silicate.
* Heating unit of lighting of waste, with gas, typical mono-bloc casting leading diving fire, lights and also security of electronic ignition, long-term ventilation, electromagnetic sluice entrance of regulation as well as also separating valve.
* Plate of burning in Carborundum, preventing the taking care of glass and slags.

18. A chamber of message combustion of gases.
* A heater of burning of gases,.
* A device of shot of air permitting a total recombustion of gases,.
* A gadget of air inlet of cooling of waste gases,.
* A sheath of emptying of the gases burnt.
* Carcass in strong sheet steel with assistance of web link.
* Structure of the refractory;.
? Refractory concrete:.
? Density: ≥ 150 mm.
?
* Framework of the refractory;



healthcare facility incinerator



* Burner with gas, mono-bloc spreading helping kind with straight fire, lights as well as safety and safety of digital ignition, long-term ventilation, electro-magnetic sluice gate of plan and dividing shutoff.
* An additional shot of air to ensure excellent oxygen material.
19. A control box guaranteeing the overall cycle of burning.

20. Fan:
* Electro-ventilator dispersing the second air, the regulation of the air flow being completed by shutoffs and sticking to the control of the automated cycle.
21. Controls as well as plans:
Control box watertight to dust, containing:

* A switch breaker for each and every engine (ventilators and additionally heating units).
* A timer with adjustable temporization for the law of each heater.
* A regulatory authority with watch for the temperature level of burning.
* A regulative authority with watch for the temperature level of postcombustion.
* Electric box.

21. The de- ashing has to be performed in the bottom of the burning chamber or the deashing requirement to be Automatic or manual collection de ashing.
22. Improve Filtering system: Scruber to be mentionned as optional
23. Exhaust Standards Conformity: BS 3316 or équivalent requirement
23. Capability to deal with Plastic: Very little less than 40% by weight
24. CE Production Conformity: BS EN 746-2-1997
22. The provider needs to provide collections of additional parts of very first severity as well as consumable of the incinerator.
23. The established heater should birth a one year guarantee.
24. The representative will perforn an onsite installment of the heater.
25. The technical training of motorists will certainly need to be provided and likewise provided by an expert from
the production facility; it will include also preventative and medical upkeep, as well as making use of equipment, etc

NB.: Civil jobs as well as any kind of kind of various other related services for the configuration as well as likewise training of drivers need to be included in the burner’s price.
Spec for the shelter of the burner: Residence of the burner extensive in deal (your residence have to have centers for hand cleansing and likewise firefighting).
This product as well as also tools have to include in the shed of the heater: foundation in debris rock, privacy roofing versus humudity; altitude with block of 20 cm (bloc concrete), continuing lintel (linteau) in boosted concrete; steel framework (charpente en steel); roofing covering in sheet B.C.A. 28 BG (Toiture en t?le), steel rain gutter, hygienic setup (laundry container, soakway pit of 20 m of deepness); ash pit of 30 m3, electrical configuration; concrete piece for handling the heater; chanel for discharge of rain water or drainage, cord mesh for oygenation up the lintel; smooth rougtcasting of walls (inside as well as outdoors); plinth with cement; 2 steel doors; email paints inside as well as likewise latex paints outside your residence on wall surfaces and also on doors; roofing restriction (planche de rive); steps for this specification will absolutely depend upon the measurement of the burner which will identify the dimension of the shed of the incinerator., etc



incinerator china

oElectro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and

following the control of the automatic cycle.

Controls and regulations:

Control box watertight to dust, including:

 

A switch circuit breaker for each engine (ventilators and burners).

A timer with adjustable temporization for the regulation of each burner.

A regulator with digital watching for the temperature of combustion.

A regulator with digital watching for the temperature of post combustion.

Electric box

The incinerator shall be suitable to completely burn the sludge without the need to mix or blend it with any other

fuel. The incinerator shall be designed to meet the latest design criteria for minimization of smoke emission. The

incinerator shall also be used to burn both liquid and solid wastes simultaneously.

Supply, installation and testing of medical waste incinerator with a capacity of 75 kilograms / hour, operated by LPG

and including all accessories with chimney in accordance with the technical specifications and public health

regulations

(MEDICAL INCINERATORS)

Heavy Duty Steel Casing With Heat Retention Fiber

Design Air/ Gas Floe Access to Provide 2-Seconds Gas Retention Time

1x Diesel Fired ignition Burner with Thermostatic On-Off Temperature Control

Particulate/ Gas Combustion at 850C And Above

Zero Smoke or Odor Emissions At 850C And Above

 

 

Chimney

 

Stainless Steel Chimney Section (1 Meter)

Stainless Steel Stack Cap

Wastes That Can be Melted or Blazed



waste itself, running problems in the shed chamber (i.e. temperature degree, holding time as well as likewise disturbance) and also

motorist capability. Waste having chlorinated materials (i.e. chlorinated

solvents and plastics, PVC piping, lumber treated with pentachlorophenol or PCB-amended paint, aquatic driftwood)

should be divided from different other waste as their burning will absolutely result in the de novo advancement as well as exhaust of numerous

dioxin as well as furan substances. Various other waste that requires to not be lost unless utilizing particularly created

incinerators consist of made usage of lubricating oil, hydrocarbon contaminated soil, biomedical waste, sewer sludge or any kind of kind of

other waste especially restricted by the Department of Environment.

solvents and plastics, PVC piping, timber treated with pentachlorophenol or PCB-amended paint, marine driftwood)

must be separated from various other waste as their burning will certainly result in the de novo development as well as exhaust of various

dioxin and furan compounds. Waste including mercury (i.e. batteries, thermostats as well as fluorescent light bulbs) as well as

various other hefty metals (i.e. lead acid batteries, timber treated with lead paint) should not be burned as the mercury

as well as heavy steels will not be ruined. Other waste that needs to not be shed unless using specially developed

incinerators consist of made use of lubricating oil, hydrocarbon contaminated soil, biomedical waste, sewer sludge or any kind of

other waste specifically prohibited by the Division of Environment.

Table 2 supplies a listing of typical wastes that can be shed and those that call for special factor to consider and

therapy. Note that open burning and incineration are recognized as separate columns in the table which

various restrictions apply relying on which approach is used. In general, much more restrictions relate to the

different techniques of open burning because of the incomplete combustion achieved. Fewer restrictions put on

incineration as a result of the operator’s capability to control the burning procedure.

Non-combustible products such as steel and also glass do not burn as well as will certainly rob warmth away from waste that can be

ruined by burning. Flammable waste needs to always be separated from non-combustible waste prior to being filled

into the melt chamber.



mobile burner



  1. Petrol: diesel
  1. Consumption: 8-10liter/hour
  1. Capacity: to cremate (carrion and spoils) 350-400kg/hour
  1. Temperature: 900-1350?C
  1. Operation temperature: -30~40?C
  1. Incinerator weight: 1800-2000 kg
  1. Volume: 0.70-0.80m/cube
  1. Exterior dimension: 1.4-1.6*1.0-1.15m (L*W)

A heater stands for a complete service to the problem of disposal of all clinical facility waste kinds. The fluid fuel

is diesel. The burner ought to meet the setup requirements. Expected Technical specifications

The burner will be totally self included. incinerators that are stainless

steel with destruction rate of 15kg per hr. bactch lots of 10-15kg of

waste in addition to average temperature degree of 8500 degress c.



china medical incinerator

the following containerized incinerators. (Kitchen and accommodation and grey water and black water plant removing waste) we need incinerator is each function separate are all in one incinerator we need informed. Plant we installing for our accommodation barge used in an offshore marine construction project. 200 People would be accommodated onboard.
WASTE INCINERATORS RECOMMENDATIONS

china medical incinerator Capability
?Incinerate minimum 80kg/hr X 12 hrs per day
?Disposal of both non-hazardous and hazardous waste streams (per waste inventory)
?Mobile Unit (Skid mounted preference with lifting points)
Design/Specifications
?Incinerators must have a secondary combustion chamber with a minimum temperature range of 900c
?Liquid waste streams shall be incinerated by an appropriate liquid injection system
?The incinerators will be installed with visual alarms to alert operations of low temperature in the secondary chamber
Operating Environment and Ambient Conditions

The Incinerators package shall be designed to operate under the following conditions:
?Average Daily Max/Min June Temperature, 21-39°C
?Average Daily Max/Min January Temperature, 2-12°C.
Medical waste incinerator,
approx. 0.4 cubic metres,
diesel fuel / mains power operated,
thermostatic temperature control,
programmable cycle

china incinerator

Stack size shall be in accordance with the manufacturer’s recommendations. Stacks shall be the forced-air type and

 

completely self-supporting and unattached to nearby structures. As a minimum, stack heights shall minimize

 

downwash of stack emissions due to aerodynamic influences from nearby structures and be calculated in accordance

 

with DoD 4715.05-G, Overseas Environmental Baseline Guidance Document. Stacks shall be provided with

 

corrosion-resistant steel weather caps.”

 

 

 

A control box ensuring the complete cycle of combustion.

china animal cremation

The panel shall comprise of a compartment for the connection of power and control cables. Passage for power cables and

control cables shall be made by the bottom part of the switchboard.

 

 

 

 

The drawer shall be locked in the isolated position by padlocks.

 

1.Two systems are required to be installed in the south of the Kingdom of Saudi Arabia. The two systems will be used by

custom authority to burn different kinds of drugs. All need equipment must be provided.

2.Warrantee:  booth systems must be provided with 3 years warrantee from the date of acceptance. All needed spare

parts, preventative maintenance repair and corrective maintenance must be included in the cost and provided to the

customer.

3.All needed electric and water connections must be provided.

4.Both systems must be of high quality and must be environmental friendly.

5.The capacity of each system should be up to 100 kg/hr.

6.The system must have automatic feeding.

7.Each system must consists of two burning  rooms, one primary room for burning the drug and another room for burning

the gases  that emit as a result of primary burning.

8.The oven must be made of steel that is rust resistance and with thickness not less than 6 mm.

9.Each system must be of high efficient in burning different kinds of drugs, and should have 99.9% efficiency for

burning organic materials.

10.Waste products should not exceed 5%.

11.System must have automatic ignition system.

12.System should use diesel (HSD) as fuel and should not consume more than  8 to 10 lt/hr .

13.Each system should be provided with fuel tank  of size adequate to operate the system for one full day.

14.The temperature in the primary room should be 850 C ± 50 C. the system should also be capable to operate up to 1050

C ± 50 C. the system should be capable of continues operation and should be provided with cement layer insulator with

adequate thickness.

15.Oven should be provided with heat insulator to allow easy operation.

16.Gas should remain in the secondary room for not more than 1.5 second.

17.The primary burning room  should have at least 2 burners.

18.The secondary burning room should have one burner.

  1. Each system should have doors for ash, exit for air to the chimney and windows to allow looking inside and for

maintenance.

20.Each system should have filtering system for gas processing with 2 tanks using ordinary water. Each water tank

should have capacity of 1000 lt and should be fixed to the system and provided with water level indicator.

21.Each system should have special technology for separating waist products and humidity after gas processing.

22.Each system should have cooling capability after operation.

23.Each system m should be provided with exhaust pipe with 250 mm diameter and 10 m high. The base of the exhaust

system should be 1000 mm. The exhaust pipe should be 6 mm and should be provide with heat insulator.  The exhaust

system should be provided with pressure indicator. It should also provide with ladder and Lightning Arrestor.

24.Electric power: should be 220 volt, 3 phase, 60 Hz, and the motor should not be less than 15 HP.

25.Each system should be provided with control panel and indicators and needed safety equipment and alarm systems. The

control panel should show at least temperature in both the primary and secondary rooms and injectors of the filters and

load.

26.Each system should be provided with alarm system for any breakdown or defect of any component of the system.

27.The following personal protective tools must be provide:

a.Heat resistant garments for 20 persons.