emissions Directive 2000/76/EC
– 150 KG/HR
– Compliant with EU rules, Directive 2000/76/EC
– Fuel type: Diesel
– Easy management and maintenance
– Temperatures:
850 deg C for municipal waste
1000 deg C for medical waste
1100 deg C for dangerous waste containing halogenated organic substances with content of chlorine or its compounds.
Needs and specs for the process of supply, installation, operation and also ensure the three incinerators for burning and incineration of medications as well as additionally unsafe substances for customizeds division
Free 3 years warranty for incinerators from shipment day. Additionally of free of charge additional parts ensure letter should stand for one decade from completion day of assurance.
Electric device ought to be delivered with service guidebook in English
Electric ability requirement to be 380-220 v 60 Hz for all devices
Offered time asap
Validity of deal ought to be very little less than 6 months
In scenario of order, we require two certifications of beginning that should be stamped from Saudi consular workplace in your country
Business payment (accredited from Chamber of Business).
Two preliminary costs.
Send an individual to repair as well as enlighten our personnel for 5 people in each area.
Send your handbooks for installment systems.
Awaiting your excellent reply.
Please use details for the adhering to,.
1-Technical explanation includes technological requirements, range of work, the demands of the procedure as well as also maintenance.
2- Technical explanation for solution technicians training and heating unit motorists.
3- Pamphlets of oven with all the called for specs
The deal expense should consist of the following;-.
1. Educating for experts as well as additionally vehicle drivers for a period very little less than two days at each web site and offer trainees educating certificates.
Documents need to consist of all the info such as pamphlets, technical resources, operating, upkeep manuals, in addition to handouts taking care of the key-board.
2- Letter from the provider to offer 3 years service warranty for incinerators from delivery day. In addition of complimentary extra components ensure letter ought to stand for one decade from the end day of assurance.
3- Offer certification that the incinerators are environmentally friendly as well as additionally attach proof that environmental administration business in the country of Origin as well as likewise your product must be discharges cost-free as a result of the level of level of sensitivity of its international air ports.
4-copmany needs to devoted delivery, procedure, and likewise setup within 60 days from the date of website tasks detection.
5- Train 5 individuals for 2 days for each and every and also every tool for a period of 2 days for safety, procedure, and installment. Supply qualifications.
GARANTEE.
Materials running in addition to emergency circumstance upkeep additionally offers entirely complimentary spare parts for 3 from the beginning day of the task. The company requires to make regular upkeep every 3 months in addition to raise the upkeep report to the administration of public problem as well as likewise Maintenance.
The business needs to make all the maintenance work also adjustment of the control and protection devices as well as also filterings system/ filters cleanse insulation.
– Isolation of losing area: the area in between the wall surfaces have to be of the “stainless-steel”. – Incinerators have actually to be fitted with a control board of the electronic methods to keep an eye on all the necessary indicators of activation techniques, as well as start-up as well as switch off so as to be divided inside a steel box with the existence of the following:.
Alarm system Sensor in the event of (accidents “heater” or filtration gadget or heat leakage or interior connections as well as electric wiring).
Screens for the temperature degree of the areas.
Aerosols Filter indicators/ monitors.
Location temperature degree sensors.
Indicators for heating systems in addition to index overload.
– Supplying fire extinguisher for each web site with a capacity of 10 kg at least
We have a 70 bed clinical center in namibia. There is a potential of getting clients from numerous other regional physicians.
Can you please provide me with some information regarding these type of incinerators (little array). It will absolutely be solitary use of each pet seperately.Initially we are preparing to start this Pilot Job with the National Medical center, to persuade the Ministry Officials as well as on its success to take this task to the Teaching Hospitals, Location and also Base Hospitals in the Country.municipality demand 4 crematory device for bodies. I need some information regarding price, kine of power for activation, hazardous exhaust, The incinerator we are looking need to be with the advantages of Cozy recycling system, usage of hot water, and also so on.
incineration Heating system for shedding patalogical (such as human cells or blood) as west
The weight of this west products is 700 kg per month and likewise we require an isolated heater
Without fume in addition to any type of sort of damaging gas
. INCINERATOR REQUIREMENTS
# Recap Spec
1 Burning Capacity – – – – 400 kg/time and also need to not be much less than 300 kg/time. Maximum burning time require to be 6 times/day
2 Smokeshaft outside diameter – – – – 300 to 400 mm
3 Fan power – – – Need to not exceed 1.1 kw
4 Voltage – – – – 220V
5 Oil intake – – – Have to not exceed 14kg/h
6 Feeding door diagonal measurement (mm) – – – – Not much less than 500mm 7 Incineration Temperature. (⁰ C) – – – – 800 or over 8 Exhaust
Carbon Monoxide – – – – Have to not exceed 100 mg/m3
SO2 – – Need to not exceed 400 mg/m3
HF – – – – (Hydrogen fluoride) Must not exceed 9.0 mg/m3
NO2 – – – – Must not go beyond 500 mg/m3
Smoke dirt – – – – Need to not go beyond 100 mg/m3
9 Elevation of the Burner – – – – Very little less than 10m over ground level
10 Manufacturer’s Solution warranty – – – – Not much less than 1 year
11 Electrical Link – – – – From closest blood circulation box using 25mm2 electric cord and additionally all pertinent links and circuitry
51.No Features $_pecific tions
1 (Incinerator)
Type of waste for disposal Animal body parts,other biomedical waste,organs dung, bedding materials,plant p缸ts and food itemsι
Incinerators for conversion of waste to fine,white sterile
ash with no visible smoke or odour
2. Load capacity 300 – 4∞Kg (maximum)
3. Bum capacity 100 Kgjhr (minimum)
4 Fuel Diesel (LDOjHSD)
5. Type of Bumer operation Automatic diesel fired
6. Primary chamber Solid hearth
Dense refractory concrete lining
Operating temeeralure of 850 土 50 deg C or more
7. Secondary chamber Slid heath
Dense refractory concrete lining
Opera恤19 temperature of 1∞o deg C or more
8. Temperature control Digital temperature control and display
Temperature monitoring and thermostatic control
9. Power supply 220V for control Box
10 Size Compact design preferred
11. Opening lid Large top open归g lid (Approx . 700 mm x 500mm) for
easy loading
12. Fuel tank 100-150 L
13. Civil works, installation and
comnuss!Onmg lndusive of civil works (brick wall incinerator house
with a shutter door,CGI sheet roofing) according to 由e
model of the incinerator.
lnstallation and commissioning of the incinerators including hiring of heavy machineries requ让ed at the time of instalIation .
Electric power supply line to light incinerator house as well as to control box of the incinerator
Onsite demonstrationjperformance test and adequate training of staff on the use of incinerators.
Warranty of one year from the date of commissioning. Separate Annual Maintenance Contract would be drawn with the supplier at a later stage.
14. Catalogue Catalogue containing detail pictures and spec迁ications
of the quoted incinerator must be included in the
bidding document
Automatic loading as well as filling up with capacity of 10 to 12 lots daily working with gas treatment methods as well as gas fuel as well as additionally should abide by the European Standards.the Federal Government Health Care Center for Medical Waste Burner with the sticking to Requirements. they are having basic wastes like cells, plastic containers etc, wastes stemming from work camps, to be incinerated, they require, 50kg/hr burner
MEDICAL WASTE INCINERATOR.our healthcare facility produce 40 kg daily from all waste product
–– – – Ability: 1000 kg/h
–– – – Kind waste
––: hazardous waste – – Other needs: Automatic waste filling system as well as exhaust therapy system.
1. Ability: 100kgs per batch
2. Temperature
I. Primary Chamber 600- 800
ii. Secondary chamber 850- 1500
3. Consumption per set: 3.2 humans resources.
4. Gas intake: 7 litres per set. Incinerator with the capacity of treating in between 300 & & & & 500 kgs fitted with the wet scrubber system.complete Heater with a capacity of 500kgs/ hr with a wet scrubber tool. a 10-20Kg per hr of residential waste? I would like to recognize what is the minimum capacity burner you have in circumstances we need something smaller?a Waste Burner of 500 Metric Tonne per day burning ability as I am in ownership of a massive quantity of mixed/municipal waste (4/5 million tonnes) of the following cosmetics (52% natural, 12% plastic, 16% paper, 6% metal, 4% glass and also 10% various other). The EU codes of the waste are as abide by: 20 03 01, 19 12 10 and also 19 12 12.
Amongst the important making a decision facets of the possible supplier is the power usage of the technique, showed either per human resources or daily and likewise I would absolutely value if such information can be made available.
medical waste incinerator options in addition to expenses for 100 bed/ 500 bed/ 1000 bed/ 3000 bed health care facilities.
– – – – Assumption: basic medical facility beds 50%, procedure beds 50% for the 100 bed health center situation, while this
ratio is 30-70% for the other scenarios
–– – – international criteria as well as additionally waste manufacturings presumptions ought to use
INCINERATOR, DIESEL.
CAPABILITY: Burner 150 kg/hr.
Sorts of wastes being utilized: GENERAL WASTE.Polyester, polypropylene, polystyrene, plastic acetate plastic, synthetic
plastics,
all-natural rubber, artificial rubber, polyurethane sheet, and also difficult films, solids as well as also
– – – – fragments that can be quickly prepared – – – Points that conveniently deteriorate such as paper, wood, natural leather and rubbish – – – Chemical waste solids as well as also fluids, waste oil as well as additionally numerous other difficult-to-handle things
The devices will absolutely be certified for procedure from PME after passing site investigations.Manual lots double chamber
burner for scientific waste to melt 50kg/hr on consistent treatment, with Key temperature level approximately
800degC minimum as well as 1200degC and even extra in the Added chamber, full with payment door, Ash door, Air as well as check out
ports, supporting air system with adjustable dampers, burners and also heater control system and also ignition system, the entire to
satisfy NEMA needs along with numerous other international needs. Здравствуйте! Меня интересует пе
чь для сжигания медицинских отходов инсинератор на 300 кг и 500 кг. Ж
ду ответа. Стоимость и доставка до г.Алматы Казахстан
The technological details we respect are:
–– – – Capacity( burning ability of waste per human resources). 150kg/hour. Burner with 300l waste chamber
–– – – Build products, 5mm Excellent high quality light steel building; 100 mm superb quality refractory cellular lining.
–– – – High Temperature paint finish.we have 2 health centers, even more afterwards 20 dental expert workplaces, and also over 50 physician workplaces.
would certainly it be feasible to give us information on the ability of burner we need
on this island.
–– – – Approximately 150 KG/Hrs. heater to dispose our daily routine death for this size of the cattle ranch.1. can the
100kg/hr melt strong waste/hazardous waste like run out paints, waste oil or chemicals.
BURNER FOR SMALL ANIMALS ABOUT 70-
100 KGR/PER TIME
2.
instance the burner will be running for 10 hrs day-to-day shows the oil use will be ~ 140 Litres or also a lot more? Do you have actually put up shelters?Installation of waste disposal system (biomedical) 500kg capability layout, MP 500
scientific burner.
2. It has to have the capacity to run not much less than 10 hours/day 3. This incinerator must have the capability to wreck all flammable wastes produced by medical centers, special facilities,
labs, institutes, and so on
4. Design Demands: Kinds A, B, C, D, as well as E of professional waste 5.” PYROLYTIC” burning, by regulating the gasification of waste.
6. The incinerator has to remain clear of the launch of black smoke as well as great dust, (Electric) throughout the loadings.
7. It should have the ability to lower the quantity of wastes by 98%.
8. It should be able to hold exhaust in the 2nd thaw with gas house of not less than 2 secs.
9. The incineration should be entirely lacking visible smoke in addition to offending smells.
10. – Message combustion: >> 1100oC.
The Internal size of the Smokeshaft: Ø 400 as well as its altitude: 8 m.
12. The Volume of the burning chamber: 1.200 L.
13.
14. Heater procedure need to be Automatic On/Off.
15. Gas: diesel.
16. The supplier has to provide essential information for the greatest of the installment.
This heater with “PYROLYTIC” burning need to have: 17. A burning chamber of waste:.
* Faultlessly tight door for the hand-operated loading of waste. The loading needs to be Guidebook, Set Loads.
* A heater of illumination which the usage is restricted to the ignition of waste.
* Frontage of filling with door seals risen on joints, wheel of screw plug, adaptable joint, as well as packaging shielding
out of refractory.
* The insulation of the burning chamber should certainly be comprised of refractory blocks, having a high material of aluminium
as well as also insulates bricks in order to make sure a minimum temperature level on the outdoors sheet steel.
– Refractory concrete:
. Nature: 42% of Al203.
– Shield in coarse panels:.
– Thickness: ≥ 75 mm.
– Nature: Calcium silicate. * Heater of lights of waste, with gas, typical mono-bloc spreading directing diving flame, lights as well as security of
electronic ignition, irreparable air circulation, electro-magnetic sluice gateway of law along with dividing shutoff.
* Plate of combustion in Carborundum, staying free from the dealing with of glass and slags.
18. A chamber of post burning of gases.
* A burner of burning of gases,.
* A tool of injection of air permitting a general re-combustion of gases,.
* A device of air inlet of cooling of waste gases,.
* A sheath of discharge of the gases sweltered.
* Carcass in solid sheet steel with support of link.
* Make-up of the refractory;.
– – Refractory concrete:.
Thickness: ≥ 150 mm.
Nature: 65% of Al203.
– – Safeguard in fibrous panel:.
Thickness: ≥ 85 mm.
Nature: Calcium.
* Heating system with gas, mono-bloc spreading assisting type with straight fire, lights in addition to safety of digital
ignition, lasting air circulation, electro-magnetic sluice entryway of guideline and isolating valve.
* A second shot of air to guarantee exceptional oxygen web content.
19. A control box making certain the complete cycle of burning.
20. Follower:.
* Electro-ventilator distributing the second air, the plan of the air flow being executed by valves and also
following the control of the automatic cycle.
21. Controls along with plans:.
Control box watertight to dust, consisting of:
* A switch breaker for every single engine (ventilators and also heaters).
* A timer with flexible temporization for the legislation of each heater.
* A regulator with digital watching for the temperature of burning.
* A regulative authority with expect the temperature level of article burning.
* Electric box.
21. The de- ashing needs to be performed in lowest level of the burning chamber or the deashing need to be Automatic or hands-on
established de ashing.
22. Process Filtering system: Scrubber to be mentioned as optional.
23. Discharge Specifications Conformity: BS 3316 or similar need.
23. Capability to treat Plastic: Very little less than 40% by weight.
24. CE Production Conformity: BS EN 746-2-1997.
22. The carrier needs to provide sets of extra components of initial necessity in addition to palatable of the heater.
23. The installed incinerator needs to birth a one year guarantee.
24. The provider will execute an onsite installation of the burner.
25. The technical training of vehicle drivers will absolutely need to be offered as well as additionally provided by an expert.
from the manufacturing facility; it will include medicinal as well as likewise preventative maintenance, as well as using tool, etc
CAPABILITY: Burner 150 kg/hr.
Kinds of wastes being used: GENERAL WASTE.Polyester, polypropylene, polystyrene, plastic acetate plastic, synthetic
plastics,
– – – Chemical waste solids as well as likewise liquids, waste oil and also numerous other difficult-to-handle items
The tools will absolutely be accredited for procedure from PME after passing website investigations.Manual tons double chamber
burner for clinical waste to melt 50kg/hr on consistent treatment, with Key temperature level roughly
800degC minimum as well as 1200degC or even extra in the Extra chamber, complete with invoicing door, Ash door, Air as well as check out
ports, complementary air system with adjustable dampers, burners and heater control system and also ignition device, the entire to
satisfy NEMA needs as well as various other international requirements. BURNER FOR SMALL ANIMALS ABOUT 70-
100 KGR/PER TIME
2. Do you have erected shelters?Installation of waste disposal system (biomedical) 500kg capacity design, MP 500
medical burner.
* A switch breaker for every engine (ventilators and also burners).
* A timer with flexible temporization for the law of each burner.
* A regulator with digital watching for the temperature of burning.
* A regulatory authority with watch for the temperature of blog post combustion.
* Electric box.
21. The de- ashing needs to be carried out in all-time low of the burning chamber or the deashing should be Automatic or hands-on
set de ashing.
22. Process Filtering system: Scrubber to be stated as optional.
23. Discharge Specifications Conformity: BS 3316 or comparable requirement.
23. Ability to treat Plastic: Not much less than 40% by weight.
24. CE Manufacturing Conformity: BS EN 746-2-1997.
22. The provider has to give batches of spare parts of first urgency as well as consumable of the burner.
23. The mounted incinerator should birth a one year warranty.
24. The provider will perform an onsite installment of the incinerator.
25. The technological training of drivers will certainly have to be offered and also provided by a professional.
from the factory; it will consist of medicinal and also preventive upkeep, and using device, etc
ADVANCED PYROLYTIC MEDICAL WASTE BURNER
1. Ability of damages in weight: 60 Kg/h.
2. It needs to have the capability to run very little less than 10 hours/day
3. This burner needs to have the capability to destroy all flammable wastes generated by health centers,
personal facilities, lab, institutes, etc……… ….
4. Layout Specification: Types A, B, C, D, along with E of medical waste.
5. PYROLYTIC” burning, by managing the gasification of waste.
6. The burner needs to prevent the launch of black smoke in addition to fine dust, (Electric) during the.
loadings.
7. It ought to have the ability to reduce the quantity of wastes by 98%.
8. It should be able to hold exhaust in the 2nd shed with gas residence of not much less than 2 secs.
9. The incineration should be completely lacking visible smoke along with annoying odours.
– The Temperature degrees of combustion: Minimum will certainly be 850 ° C as well as likewise max 1400 ° C. – – Message combustion: > > 1100 ° C.
11. The Inner size of the Smokeshaft: Ø 400 as well as its altitude: 8 m.
12. The Quantity of the combustion chamber: 1.200 L.
13.
14. Heating system procedure need to be Automatic On/Off.
15. Fuel: diesel.
16. The supplier needs to offer needed details for the absolute best of the installment This incinerator.
with “PYROLYTIC” combustion ought to have:.
17. A burning chamber of waste:.
* Flawlessly tight door for the hand-operated loading of waste. The filling should certainly be Manual, Establish.
Tons.
* A heating unit of illumination which the usage is restricted to the ignition of waste.
* Frontage of filling with door seals increased on hinges, wheel of screw plug, adaptable joint, as well as also.
packing protecting out of refractor.-.
* The insulation of the burning chamber must be made up of refractory bricks,.
having a high material of aluminium and also guards obstructs in order to make sure a minimum.
temperature level outside sheet steel.
* Framework of the refractory;
– – Refractory concrete:.
> > Thickness: > > 100 mm”.
– > > Nature: 42% of A1203.
– Safeguard in coarse panels:.
> > Thickness: > > 75 mm.
> > Nature: Calcium silicate. * Heating system of illumination of waste, with gas, conventional mono-bloc spreading leading plunging.
flame, illumination as well as likewise safety and safety and security of electronic ignition, irreversible air flow, electro-magnetic sluice.
gateway of regulation as well as separating valve.
* Plate of burning in Carborundum, avoiding the dealing with of glass along with slags.
18. A chamber of write-up burning of gases.
* A heater of burning of gases,.
* A gadget of shot of air permitting a total recombustion of gases,.
* A gadget of air inlet of cooling of waste gases,.
* A sheath of emptying of the gases charred.
* Carcass in solid sheet steel with aid of connection.
* Framework of the refractory;.
– – Refractory concrete:.
> > Thickness: > > 150 mm.
>> Nature: 65% of A1203.
– – Shield in fibrous panel:.
>> Thickness: > > 85 mm.
>> Nature: Calcium.
* Heating unit with gas, mono-bloc dispersing guiding kind with straight fire, lighting as well as likewise security of.
digital ignition, long-term ventilation, electromagnetic sluice entryway of guideline and likewise dividing.
shutoff.
19.
20.
* Electro-ventilator spreading the additional air, the standard of the air circulation being.
accomplished by valves along with adhering to the control of the automated cycle.
21. Controls along with guidelines:.
Control box watertight to dirt, including:.
* A button breaker for every single engine (heaters and ventilators).
* A timer with adjustable temporization for the policy of each heating unit.
* A regulator with watch for the temperature degree of combustion,.
* A regulatory authority with look for the temperature of postcombustion.
* Electric box.
21. The de- ashing needs to be done in lowest level of the burning chamber or the deashing.
Improve Filtering system: Scruber to be mentionned as optional
23. Release Criteria Conformity: BS 3316 or similar standard
23. Capability to deal with Plastic: Not a lot less than 40% by weight
24.
burner.
23. The set up burner has to birth a one year guarantee.
The provider will certainly perforn an onsite installment of the heater.
25.
manufacturing facility; it will absolutely consist of medical along with preventive maintenance, and also using tools, etc
NB.; Civil jobs as well as any kind of various other pertinent options for the installation along with training of drivers require to be included in the heater’s rate.
Needs for the shelter of the burner:
Residence of the incinerator thorough in offer (your residence have to have toilet as well as hand cleaning facilities as well as likewise firefighting). The measurement of the shelter shall gauge 4 meter by 6 meter and will be provided with appropriate air ventilation.
This material along with equipment should include in the shed of the heater: structure in debris rock, isolation roofing covering versus humudity; elevation with block of 20 centimeters (bloc concrete), proceeding lintel (linteau) in strengthened concrete; steel framework (charpente en steel); roofing covering in sheet B.C.A. 28 BG
23. Release Requirement Compliance: BS 3316 or similar standard
23. Capability to treat Plastic: Not a lot less than 40% by weight
Our interest is for disposing mainly cytotoxic waste, particularly out of date or out of specs cytotoxic medicines. Numerous other wastes for which we want to obtain rid of in enhancement to the cytotoxic waste includes obsolete or out of specs psychotropic pharmaceuticals (however not constantly narcotics), sharps (needles) and also so on.
It is in addition really important for us to recognize if the device is certified to deal with cytotoxic waste as well as also the characteristics as well as disposal of therapy deposits.
The quantity of disposal is about 100 kg per day as minimum. Bigger capabilities approximately 500-600 kg/d are likewise of terrific interest to us. Hence, please send us your proposition for both aforementioned day-to-day abilities.