Central Australia’s animal graveyard

The figure was revealed in the Alice Springs regional waste management facility report for October.

The dead pet you asked the vet to dispose of will end up buried in landfill, in most places across the country, and Alice Springs is no different.

“It’s a combination of horses, dogs, cats, pigs, any animal that dies,” said Alice Springs council technical services director Greg Buxton. “Road kill, kangaroos and that, the rangers pick them up, and you’ve got to dispose of them somewhere hygienic. So we put them at the back of landfill.”

The facility is on track to exceed last year’s total, with 3.7 tonnes deposited in the first quarter of this financial year.

Mr Buxton said most regional councils across the country dispose of dead animals in landfill.

“In the bigger cities they have an incinerator type setting where they cremate them, whereas we don’t have an incinerator here,” he said.

by: http://www.news.com.au/national/northern-territory/central-australias-animal-graveyard/story-fnn3gfdo-1227123002725

HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial 
trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed.
Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures, 
eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal 
for military and civil camps and remote locations where infrastructure is scarce.
Incineration is the most obvious solution for total destruction of municipal waste, avoiding all the direct and indirect risks associated with 
other disposal methods.
Incineration perfectly fits into a trend of treating waste in a safe way, and if possible, at the same place where it was generated to avoid 
cross-contamination risk and to keep waste treatment costs at acceptable level.

WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters

Nanjing Clover Medical Technology Co.,Ltd.

Tel:  +86-25-8461 0201   
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  

Medical Incinerator

Basic Info.

Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

Q: What’s kind of waste can utilize in this equipment?  A: This equipment for medical waste, pet animal, Municipal waste, live squander. Prohibit any volatile and radiation material, liquid waste and gas waste. 

Q: Incinerator Smoke Standard  A: China Government Standard: No. GB18484-2001.  The animal/pet combustion rate around 2/3 of average power. 

Clover incinerator use time per day up to 24 hours. Between each feed/combustion time, there are approximately 0.5-1 hours cooling time and time for feeding waste. Burning incenrator manufactuer, burning medical waste, burning waste chamber, purchase a portable crematorium, purchase a small incinerator, purchase animal cremation systems, Real combustion time per day is about 16 hours. The life of incinerator between 5-10 year based on use. 

Generally, we proposition little laboratory, little clinic use capacity under 20 kgs per hour. When incinerator use in hospital, please calculate the waste output capacity around 2kgs per people each day. If there are 200 sickbed in the hospital, that's mean you need 1 incinerator capacity around 400kgs each day, change to power per hour is approximately 30-40 kgs per hour. According the operation time per day, waste material, budget, development, etc, you may use capacity from 30-50 kgs per hour incinerator.  *How to calculate Animal Cremation Burn Rate: 2/3 of the medical waste. 

Q: Assembly and Testing  A: We supply all documents and incinerators simple to setup and operation. Customer can send people come to our factory to find out operation and installation. Generally, We do not send engineer to local site or even ask. The dispatch cost is additional according to order.  The second combustion chamber: 1000-1200 centi level. 

Q: Incinerator Control Mode  A: Default Control manner is common control case. PLC mode according to model and order. 

Q: Operation and maintenance costs  A: Operation price based on fuel consumption rate and power/staff, etc. 

Annual around $500-$1000USD per year maintenance according version, use situation. 

One individual can service 02 unit incinerators. The team should have basic electrician understanding to operate/inspect/maintaince incinerator/burner/blower based on operation user guider, and know risk of medical waste to safeguard worker self with essential protection component. 

Q: The Residency time in secondary combustion chamber  A: 02 sec.

Q: The Residency time in secondary combustion chamber 
A: 02 sec.

Items/Model YD-10C YD-20C YD-30C YD-50C
Burning Rate (kgs/Hour) 10 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 50 kgs/Hr.
Feed Capacity (kgs) 40 kgs 40 kgs 50 kgs 80 kgs
Equipment Weight 1200 kgs 1200 kgs 1800 kgs 2200 kgs
Primary Chamber (Liters) 200 200 250 400
Secondary Chamber (Liters) 140 140 140 140
External Dimensions (cm) 170x140x160 170x140x160 170x140x190 180x160x200
Internal Dimensions (cm) 55x55x65 55x55x65 55x55x85 70x70x85
Oil Tank(Liters) 50 100 100 150
Door Opening (cm) 38 x 48 38 x 48 38 x 48 45×55
Chimney (M) 5 5 5 5
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

The other day in the waste incineration plant

Recently a dream came true for me. I had the opportunity to participate in a guided tour through the waste incineration plant in Cologne. That may seem strange. Sometimes I catch myself when I get stuck on documentary programs about recycling methods in the (rare) zapping through the TV channels. Obviously this topic fascinates me.

The BVMW (Federal Association of Medium-Sized Enterprises) invited to a lecture on the topic of generation Y. Host and the venue was the waste recycling company in Cologne, AVG, which offered additionally a guided tour through their waste incinerator. Since I am also very interested in the topic Generation Y, I could kill two birds with one stone.
In a small group, we were led by the spokesman of the AVG through the various sections of the waste incineration plant and the procedures were explained in detail. Initially skeptical, because in previous years there was so much negative about this facility (excessive construction costs, lack of capacity), the mood among the participants changed gradually into fascination.

To clarify: It’s just about waste. Not about recycle materials such as paper, plastics, recycled glass or compostable organic waste.

Precision and cleanliness

What I noticed during the tour: In the plant, each step is carefully considered, it is worked with great precision. And even if that sounds paradoxical: it is squeaky clean! Only in the hall where different wastes are mixed on conveyor belts, there is the typical smell of rubbish, but also not as bad as originally expected.

Amazing for me: I did not know that by using residual waste a really large amount of power is generated. And reassuring for me: resources are won even from the last drop: metal, material for road construction, plaster in good quality. The proportion of what is factually left and actually not recycled, seems negligible to low.

From waste to electricity – the process in detail

The residual waste incinerator in Cologne was put into operation in 1998 and is one of the most modern and best facilities in the world. It processes what has landed in the residual waste after the separate collection of private households, as well as the remains of sorting from mixed building and industrial waste.

Much of the waste is shipped by rail. The railway containers are loaded in two waste transfer stations in the city of Cologne and together have a capacity of approximately 250,000 tons per year. The remaining waste is brought by truck.
A special feature of the Cologne residual waste incinerator is the integrated treatment of the waste in a treatment room. Residues from sorting and residues from the domestic and bulky waste are first distributed to the daily waste bunker on separate chambers. The bulky waste is pre-sorted and crushed. Only the non-recoverable components are processed in the incinerator.

The household waste is sorted in a perforated drum to size and then passes on large conveyor belts so-called magnetic seperators. They remove ferrous scrap. A second ferrous metal deposition as well as an automatic non-ferrous deposition take place after combustion.

Even commercial waste residuals are delivered to the Cologne plant. They have been processed previously in external sorting, so they can be added directly to the domestic and bulky waste. The various waste streams are mixed thoroughly, because this homogenization ensures a high quality, a uniform as possible burnout and a good quality ash.
From the huge hall of the conveyor belts the waste enters the so-called residual waste bunker. Here it is stored a while until enough moisture has dissipated, so that it can burn well. By means of permanent temperature and humidity indicators it is controlled, in what condition the waste is. With large gripping cranes the waste is rearranged and finally placed in the kiln. The garbage gripper fill four huge funnels. The waste comes from here in four independently powered boilers that operate around the clock. The waste moves on roller grates through the boiler. And there it burns. At an unimaginable heat of 1,000 to 1,500 degrees Celsius. The respective “new” waste ignites from the already burning garbage. So no additional external energy is required for the combustion process. The combustion takes place after the DC principle: The burning of waste and the waste gases move in the same direction through the “hot flame” at the end of the grate. This procedure ensures that the destruction of pollutants such as dioxins and furans are already done in the combustion chamber.

From waste is made power for 250,000 people

And here is the highlight. The heat produced during combustion is used. On the one hand, to heat the nearby Ford plant. But this is just a nice side effect. The majority of the heat is converted into electricity by generators. And even that much that the power consumption of 250,000 people can be met. The waste incineration plant Cologne is thus basically a power plant and supplies a quarter of the city of Cologne with electricity. That sounds awesome. And since you could get the idea that it is not so bad when so much garbage is produced – as it is used so well …

After combustion bottom ash, hot exhaust gas and residues remain. These substances are largely used again useful: The ash is cooled with water and stored in an ash bunker before it is processed in a bottom ash treatment plant and then utilized in road, landfill and landscaping.
The hot exhaust gas is used for power generation. It heats preheated water to steam, which meets at a temperature of 400 degrees Celsius and a pressure of 40 bar to a turbine. This drives the downstream generator with which is produced electric power. For own use only a small part of the energy is needed. The greater part is given in external power supply networks. The amount of energy generated in the incinerator is enough to power more than 100,000 households.

In the combustion and the subsequent exhaust gas purification residual substances such as dust and salts remain as well as ashes from the boiler. These materials are collected and used as backfill material for the backfilling of salt mine tunnels. Gypsum is also a waste material, which is obtained as a reaction product in the exhaust gas purification and has building material quality.

Emission control: the exhaust gases are almost completely neutralized by the method used at the Cologne incinerator. There is no waste water, as well as the legal requirements are clearly undercut. As a neutral auditor, the county government gets the actual exhaust gas readings permanently by direct line.

Rethinking at waste management companies

After the guided tour, I had the opportunity to talk to the press officer of AVG. In this conversation it became clear how much the thinking has changed in the field of waste management in recent decades and years. While during the 1960s to the 1990s garbage was piled up completely unsorted in landfills and then forgotten, in the new millennium they have recognized the value of the waste. Climate change and CO2 emissions have long pushed as important issues in focus for the residual waste processing. The heat generated during combustion is converted into electricity. Resources are regained, as far as is technically possible. Especially metal, plastics and wood. The recovered plastic from residual waste is used for example as fuel for cement plants.

Waste incineration plant are nowadays equatable to power plants, even if the fuel value is not quite equivalent to the conventional fuels such as coal, oil and gas. As more and more municipalities have come to generate their own electricity by means of residual waste incineration, the major electricity providers get in significant difficulties.

At the end of the tour I was really impressed. That what is put in the residual waste in private households plus the commercial waste is, after all, still god to supply 100,000 households with electricity in Cologne.

And at the same time it’s scary, what incredible tonnes of waste we produce. Yellow and blue ton even come on top of that.

Consumer society provides garbage

Waste incineration plants generating electricity for us and making us less dependent on fossil fuels, are the logical consequence of our consumer society. But incinerators are not built primarily to generate electricity. But to become master of the mountains of waste that we produce continuously as a consumer society. Fortunately, with modern incinerators, a way has been found to make up the stinking problem a clean thing. But the cause, our consumption, is the real problem.

For the operators of the incineration plant, it is essential that enough waste is delivered. Garbage is their product. The more they can get, the better for the system’s capacity. For then it will work cost-effectively, which in turn has a positive impact on the urban garbage fees. Not all incinerators in Germany are so well utilized as in Cologne. Since waste is added from adjacent areas.

But the consumer society provides these masses of garbage. Goods are produced in large quantities, purchased, used or consumed and eventually discarded. The 2aste incineration plant gets food – in 2013 there were 707,000 tons in Cologne. And provides us even with power (282 million kWh in 2013 in Cologne). Actually a perfect cycle, so one might think. If not for this “but” would be. Because our conventional consumption goes at the expense of other countries, to the detriment of the environment, fair working conditions; Resources are wasted, the transport around the globe has impact on the climate, production facilities in the Far East poison the local environment and so on.

Well, I live in Cologne, a big city, where certainly only a small proportion of residents think about trash, disposal or even waste reduction and also practice this. That may be a negative point of view, but I think it is realistic. The average normal citizen does not necessarily ask the question what is actually happening to what he throws away in the course of a year. All the more it is interesting to follow the different paths. My next wish is to visit a recycling plant for plastics.

Waste incineration and waste seperation versus waste prevention

Waste separation was yesterday. The latest approach is waste prevention. In its most distinct version it is called Zero Waste. No waste. So far there are only a few pioneers, whose reports and videos I read and watch with interest. And at the same time I wonder how to implement this in a normal big-city life. It starts with the fact that – even if you use a togo box, which is compostable, then you do not know where to dispose of it along the way. So take it home and put it in the compost bin? Would everybody do that?

I think it’s great if it is possible, to be master of the situation (immense amounts of waste) through a well organized disposal system and beyond even to convert this residual waste to a large extent into energy, ie electricity and heating. There is at least a huge improvement as against the stinking landfill from earlier, in which everything was thrown into a pile and then covered with the cloak of silence. The next step must be, to reduce the amount of waste in total. And this will not be possible just by the civil society. Here politics and economy are asked to create the right framework and to set the practical implementation in motion.

by: http://blog.upcycling-markt.de/en/blog/muellverbrennungsanlange-waste-incineration-plant.html

Kenya: How Toxic and Infectious Medical Waste Is Harming Citizens

A visit to the hospital does not usually reveal what happens at the back. It is here where discarded blood and body tissues and parts from surgeries, pharmaceuticals, medicine bottles — tonnes of hospital waste — go through. In the case of the Kenyatta National Hospital, this could be as much as one tonne a day estimated to be half the medical waste generated in the city. Quite understandably, it is not usually open to the public.

Most of these normally end up in incinerators — the most affordable medical waste disposal method for most hospitals. But a lot of it slips through the system to get us worried.

Incinerating waste at temperatures between 800-1,100 degrees Celsius kills viruses, bacteria and other pathogens but the ash still contains dangerous heavy metals like mercury and cadmium. Best practice dictates that such ash be buried.

But as this writer found out, this is better said than done. Lack of adequate equipment to safely dispose of waste and failure to observe best practices was a common feature in most hospitals visited in this survey.

From releasing dangerous fumes and ash openly to the environment to dumping medical waste together with general waste, the local medical waste management scene still has a long way to go.

Raw medical waste and toxic ash from incinerators ends up in open dumps like Dandora and Eastleigh posing a health risk to thousands of people salvaging plastic and metal for recycling and residents living nearby. Major hospitals like Kenyatta National Hospital which otherwise have good incinerators have run out of grounds to bury toxic ash. Few hospitals have a scrubber system where fumes are filtered to remove potentially toxic gases including dioxins from burning plastic — a common material discarded by hospitals.

A recent report on the global status of waste management ranks Nairobi as one of the worst in waste management. Residents living near Dandora reported a high number of respiratory diseases and were found to have unacceptably high levels of heavy metals like lead in their blood. Dandora dumpsite reeks of heavy metals which can hinder brain development as our independent tests confirmed.

“Most health facilities take ash from their waste to municipal dumpsites directly or through collectors,” says Mary Kinoti, a lecturer on environmental and occupational health at the University of Nairobi.

Walking through the dumpsite opened during the 1970s reveals unlikely materials that end up here. Lying in the pile of an unsightly mix of plastic bags and organic waste, one often finds bloodied gloves, dressing bandages, needles, discarded drugs and a host of other metals tucked away.

From their small quantities, it is easy to conclude that this come from smaller hospitals, clinics and dispensaries not willing to spend on the proper disposal of waste. Level five hospitals, formerly called provincial hospitals like Nakuru, are mostly well equipped with incinerators that can combust pathological waste into water and ashes, says Kinoti.

A peek at the Dandora dumpsite reveals an unsightly mix of plastic, food remains, animal products and all manner of waste the city discards. Every few minutes a truck makes its way through the mountains of garbage the city has accumulated over decades. The steady stream of trucks falls silent at dusk.

But as dark falls, another set, mostly lone trucks hurriedly enter the dumpsite, quickly offload their contents and make their exit, all within a few minutes — well aware of their wrongdoing. A closer look at the dumped material reveals used needles, bloodied bandages, pharmaceuticals and a host of other waste from hospitals. We even found syphilis and HIV test kits.

Early in the morning, a County Government of Nairobi earth mover turns over the waste mixing it with garbage ready to receive the next batch for the day.

Tens of people descend on the site, sorting the garbage with their bare hands. Their interests are different. While some solely focus on milk packets which they wash in a sewage tunnel, others are interested in salvaging metals from the burnings heaps, fuelled by the excessive gas underneath.

Still others are after the food remains which they collect to feed animals — all determined to make a living. A prick from an infected needle and they could end up with serious infections including HIV.

They all seem too aware of the danger, but they have to feed their children, a man, protected only by a pair of gumboots, says.

The National Environmental Management Authority and the County Government of Nairobi did not respond to our enquiries.

Yet the danger of medical waste in the country does not start or end here. Medical facilities try to safely dispose of their waste to various levels of success. A large number incinerate their waste, but lack the prerequisite air pollution control equipment to guard against materials such as sulphur, known collectively as flue materials, getting into the environment.

In such cases, residents living near such facilities are prone to respiratory infections. Dioxins from plastics are known to cause serious respiratory complications and cancer. A study carried out by a Yale University student recently found that high levels of toxic fumes from incinerators rending the air were responsible for respiratory infections among residents living near such facilities.

A recent report detailed the high levels of heavy metals such as lead in vegetables grown and sold in Nairobi. Lead is a dangerous metal that can cause retardation in children. Some farmers in Kinangop were recently in the spotlight for using sewage to grow their crops largely sold in the city.

Incinerators below standard

Dumping of toxic ash is not the sole problem facing the medical waste management scene. The state of equipment is wanting, some dating several decades ago and ill equipped to minimize pollution.

Most public hospital below level five have de Montfort incinerators where temperatures are not controlled and are likely to pollute as they lack scrubber systems. “Unfortunately this type of incinerators are common in district hospitals and health centres,” Kinoti says.

“A wet scrubber is a compartment where the emissions are sprinkled with water to dissolve air pollutants, and what is released to the environment is clean,” Kinoti explains. Workers are also not well protected in mid-level hospitals. Because of the design of the incinerators, medical waste is loaded manually and workers who mostly do not have protective gear are exposed, she says.

A medium size incinerator costs an average of Sh20 million before installation, clearly a high shot for hospitals. Add the high maintenance costs and the fact that these facilities guzzles several thousands of litres of fuel to run per day and you end up with a very high bill.

“But the high cost of incinerators is no excuse for polluting the environment,” says Kinoti. “Hospital waste contains mercury and can produce furans which are very toxic and can cause cancer and acute respiratory diseases,” she says.

Medical facilities which do not have incinerators are required to have contracts with specialised waste disposal companies to handle their waste. For some, this is just an unnecessary hurdle they have to undergo before acquiring a license to operate a hospital. Little is done to comply. A number do not follow through with these requirements posing a huge health risk to the public and the environment.

Hospitals categorize their waste differently for their safe handling during transport, storage, treatment and disposal, says Bernard Runyenje, assistant chief public health officer, Kenyatta National Hospital.

Highly infectious waste are those expected to be containing highly infectious pathogenic organisms such as bacteria and viruses while general waste may consist of office paper. Usually in red packages, infectious waste require special care throughout the process of waste disposal and are supposed to be treated at source. It is not however unusual to find a worker carrying a yellow or red disposal bag without gloves or any other protective gear.

Tissues that decompose quickly such as amputated limbs are disposed of quickly or put under refrigeration. Most of these highly infectious waste — except radioactive waste — should most appropriately end up at the incinerator, Dr Runyenje says. Most African countries use incineration to dispose of medical waste.

According to Dr Runyenje, incineration should be a controlled process and should happen in an enclosure. But he also admits that incinerators in rural areas do not meet these specifications.

A good incinerator should have more than one chamber where waste is burned in the first chamber, so that there is increased temperature in the second chamber and gases can be burned in the third chamber, he says. At the end of the process, most of the waste has been burned to an acceptable level. Clinics and dispensaries often operating in highly populated areas often flout the regulations, openly burning their waste using paraffin and charcoal to avoid the cost of safe disposal. Half burned waste is easy to spot in dumps on roadsides and quite visible in municipal dumpsites.

Incineration however does not get rid of toxic fumes and heavy metals — if anything it can disperse toxic fumes to a wide areas if not done properly. The scrubber system is designed to reduce such pollution but the system is expensive and most hospitals visited do not have it. The gas from the incinerator is passed through fluid to remove any particulate matter — inside a scrubber system. Such gases may include carbon monoxide, carbon dioxide, dioxins and furans which can cause serious diseases such as cancer.

The minimum height of a chimney should be at least 10 feet above the tallest building around to minimise direct exposure to residents. Anything that comes out of the chimney should be dispersed away from nearby buildings.

“Sometimes it is difficult to know what you are emitting to the environment. If you release it directly to human beings, then you expect to have some health issues, whether it is inhalation of carbon monoxide, carbon dioxide, dioxins or furans,” Dr Runyenje says. A high chimney should not however be seen as a replacement for a scrubber system, adds Kinoti. A high chimney only disperses fumes further to residents who may not even be aware of them, she observes.

To many, including waste managers interviewed, ash from incinerators, or any ash for that matter is not harmful — a misplaced notion that could be contributing to its dumping. The truth is that they contain harmful metals like mercury, lead and cadmium as our independent tests confirmed.

Incineration reduces the waste to about 10 per cent of the original volume. But the remaining ash usually contains very high content of heavy metals. How hospitals and waste disposal companies handle this will determine the health of our environment. Such should usually be buried in sanitary landfills to prevent it from leaching to the ground, but this practice appears rare in the country.

Whether through sheer negligence, or lack of space and facilities or reluctance to meet the associated costs, medical waste nevertheless ends up in our environment. When disposed in open ground, heavy metals easily leach to the groundwater or make a direct way to our food chain.

Bottom ash under normal circumstances should be buried, but most health facilities do not have disposal grounds. These burial grounds are not present either at Dandora where officials claimed the ash was taken to be buried.

Some companies are licensed to handle hazardous waste. However, Dr Runyenje however notes that not many handle general medical waste.

A number of incinerators in public hospitals were in a state of disrepair leaving tonnes of toxic waste piling up and posing a danger to the public.

Kenyatta National Hospital has a ground where tonnes of waste are kept awaiting disposal. Two of its three incinerators are awaiting repair causing a backlog estimated at 170 tonnes.

Its newly acquired incinerator from India is the most advanced among the hospitals visited consisting of two chambers for maximum combustion. The wide network of smoke pipes leads to a chamber where the smoke is passed through a fluid to remove fumes and other residue.

The resulting black slime contains some of the dangerous metals. But the design and structure of the holding area does not meet specifications and some of it seeps to the ground, a source tells us. Its aging incinerators dating back to when the hospital was started are awaiting repair.

The incinerator cannot be operated during the day because the nursing school is just metres away.

The location of incinerators in relation to hospitals, offices and other residential is a common problem in many facilities. The one at the Chiromo School of Physical and Biological Sciences for example is not in operation as it sits near an embassy.

One incinerator in Nakuru County is perilously close to the maternity ward, some smoke go directly to patients.

The scenario plays out in many other hospitals around the country who also lack additional air pollution control equipment.

Ash dumped in open ground are an open feature in a number of leading facilities that could potentially poison ground water through leaching.

Ideally, ash from such waste should be buried in landfills, a practice that was long abandoned in the country.

With people living near such facilities, they are inevitably exposed, and risk serious respiratory infections and serious diseases including cancer. The Kenyatta National Hospital incinerators operate at night to minimise exposure to the students at the School of Nursing barely a dozen metres away.

A source told this writer that the soils were so contaminated they will have to be skimmed off and buried. Meanwhile, residents will have to contend with dangerous, possibly carcinogenic, ash emanating from such facilities.

Larger hospitals like Nairobi Women’s Hospital are stepping in to help smaller ones incinerate their waste. “The cost of the incinerator is too high for them to afford,” says Thomas Imboywa, who is in charge of one of these at the Nairobi Women’s Hospital, one of the largest in the region. On a daily basis, he oversees the safe disposal of the days waste.

The incinerator, a huge blue structure sits on about 100 square metres of space slightly off the main building and sports a high chimney, towering above the nearby building.

“Medical waste is ideally incinerated within 24 hours,” says Imboywa. But when a clinic or hospital does not turn in any waste for weeks on end, it raises eyebrows, Imboywa says. He is familiar with many such cases and the hospital is quick to repudiate such contracts as per their policy. Some medical facilities may just secure a contract with them to wade through National Environmental Authority (Nema) regulations but have no intention to safely dispose of their waste, Imboywa observes.

Those who do not have incinerators are required by Nema to have a contract with hospitals like Nairobi Women’s Hospital to dispose their waste. However, not all medical waste ends up in such specialised facilities. Instead, in places like Kibera they are doused with paraffin and burned in the open.

“But in this case, sharps will remain and the waste can still remain infectious because they cannot reach the required temperature,” Imboywa said. In fact the material can remain infectious because they may not reach the required temperatures.

Devolution could make it worse

As more hospitals come up in tandem with the growing population, a rethinking how medical waste is handled will be inevitable. The devolution of resources has seen more clinics and dispensaries put up in previously unreached areas. But the resources are so limited to put up waste disposal facilities such as incinerators.

Besides being expensive, Dr Runyenje agrees that even if these facilities were to put up their own incinerators, there would be more pollution and authorities will have more difficulty supervising them.

“There is need to pool incineration facilities for medical and hazardous waste,” he says. These centres can serve as emission monitoring points for authorities. “It will then be easier to put controls from such a central facility. “At the Technical Working Group, we are looking at how counties can pool their facilities together and have their medical waste incinerated at a central point. It will be very expensive in the long run to have every facility to have its own incinerator that cannot run at full capacity,” he says.

The best waste disposal method is controlled tipping being practiced in most of Europe and North America where it is buried in layers, Dr Runyenje says. “The advantage with this method is that the land can still be used for other activities. It is the only assurance of disposal of any form of waste,” he says.

Kariobangi, which now hosts light industries, used to be a controlled tipping site before open dumping at Dandora. “Counties should be thinking of controlled tipping instead of investing heavily in incinerators,” he says.

General waste can have many recyclable materials but proper segregation which can make this possible is still lacking in the country.

The effectiveness of recycling is determined by the effectiveness of segregation.

The problem, according to Kinoti, is enforcement of the law. While bigger hospitals are trying to properly dispose of their waste, some smaller clinics may be spoiling it, she says. The fact that generators cannot monitor their waste once it is given to waste collectors is also another problem according to her.

“There are many quacks doing waste management mixing household waste with hazardous waste. This can pose a serious health problem,” says Kinoti. Since they empty waste bins from homes, waste collectors can cause serious contamination in households. “Waste collectors who are collecting hazardous waste should be dedicated waste handlers and should not handle other general waste,” Kinoti says.

Effluent from the scrubber system should be taken for treatment to remove heavy metals and other pollutants. But the sewerage system is broken and a lot is discharged on the way. Sewage pipes are sometimes deliberately punctured and effluent used as fertiliser for crops.

“The law on sound medical waste disposal should be enforced, district and healthcare centres should install larger incinerators to handle waste from smaller fee. We should have dedicated healthcare waste managers,” Kinoti says.

 

by: http://allafrica.com/stories/201411111021.html

HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial 
trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed.
Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures, 
eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal 
for military and civil camps and remote locations where infrastructure is scarce.
Incineration is the most obvious solution for total destruction of municipal waste, avoiding all the direct and indirect risks associated with 
other disposal methods.
Incineration perfectly fits into a trend of treating waste in a safe way, and if possible, at the same place where it was generated to avoid 
cross-contamination risk and to keep waste treatment costs at acceptable level.

WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters

Nanjing Clover Medical Technology Co.,Ltd.

Tel:  +86-25-8461 0201   
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  

Incinerator

Basic Info.

Model NO.:20 kg per hour
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:clover

Product Description

Clover supply medical waste incinerators, pet and animal cremators, other solid waste incinerators to over 30 countries. We have re-designed the incinerators lining configuration. We also have designed and installed our very own PLC computer system into incinerator operation system. Medical incinerastor installation expenses, medical inciné Rateurs in china, medical incineration, medical incineration container, medical incineration in china, Clover know it’s important that build them better, keep it simple and offer a great service. We make quality products that give excellent payback on investment, our incinerators are the most powerful and thermally efficient in the industry.  The incinerator lines have small scale to large scaleup to 500kgs per hour. The combustion chamber use high strength material, expensive cost but better quality than competitors. Incinerator operation system use PLC program control manner, give up the complex manual operation. 

Items/Model TS20(PLC)
Burn Rate 20 kg/hour
Feed Capacity 40kg
Control Mode PLC
Combustion Chamber 210L
Internal Dimensions 65x65x50cm
Secondary Chamber 110L
Smoke Filter Chamber Yes
Feed Mode Manual
Voltage 220V
Power 0.5Kw
Oil Consumption (kg/hour) 7.8–16.3
Gas Consumption (m3/hour) 8–15.7
Temperature Monitor Yes
Temperature Protection Yes
Oil Tank 100L
Feed Door 45x40cm
Chimney 3Meter
Chimney Type Stainless Steel
1st. Chamber Temperature 800 centi-degree –1000  centi-degree
2nd. Chamber Temperature 1000 centi-degree -1200 centi-degree
Residency Time 2.0 Sec.
Gross Weight 2200kg
External Dimensions 160x110x130cm
 

Medical Waste Incinerator

Product Specifications : Medical Waste Incinerator
Medical Waste Incinerator, Incinerator
Specifications-type Pyrolytic combustion
Construction requirements of the incinerator-Incinérateur Gas or electric and designed to
Minimize noise during operation
Prevent the release of black smoke and fine dust during loading and operation of waste
Allow for regular and complete combustion of the waste
Allow automatic operation requiring little, if any monitoring and ensuring optimal and safe operation
Provide limited consumption of gas or electricity
Provide fire safety for the entire installation
Install a protective shelter of the incinerator.rated
Capacity-Incinérateurs Capacity of at least 5 to 7 kg / h
Temperature combustion and post-combustion
Combustion temperature: at least 900 ° C- After burner temperature: at least 1100 ° C.Range and operating time-Operation Optimal and uninterrupted for at least 06 hours in a row.
Quality of treatment-Fumée Emitted less harmful and whitish
General Design-Ensure Maximum protection and operator safety.-provide A fume extraction device
Combustion-Set The combustion chamber between 900 and 1000 ° C-Non Combustion with a thermometer probe and numerically displaying its inner temperature.atmospheric emissionsAtmospheric emissions will be done according to the rules and standards:Concentrations in mg / Nm3 of flue gas reported at 11% oxygen
Substances:Daily averages:- Total Dust: 10-30- Organic in the state of gas or vapor, expressed as total organic carbon (TOC) substances:: 10 – 15- Hydrogen chloride (HCl): 10-15- Hydrogen fluoride (HF): 1-3- Sulphur dioxide (SO2): 50-60- Carbon monoxide (CO): 50-90-Speed Injection of greater than 8 m / sec air emissions.
Related SERVICES-the Delivery of the incinerator must be accompanied by the provision of a number of services.Installation of the incineratorFlush and startup of the incinerator on the site in accordance with requirements prescribed by it.formation- Trained in the use and preventive maintenance of the incinerator of the manipulator (operator incinerators.Toolbox and wear parts-Provide Toolkits for maintenance-Provide A toolkit for each incineratorwarranty-At Least one (01) year from the date of delivery.-Take Into account the replacement of defective parts or any other book accompanying the delivery of the incinerator

Baltimore teens take out the trash

Youth battle a waste incinerator.

It’s the threat of dangerous air pollution that has students at Curtis Bay’s Benjamin Franklin High School leaving the classroom and demonstrating in the streets of Baltimore.

In Curtis Bay, a neglected waterfront neighborhood at the southwestern fringes of Baltimore, an alliance of environmental activists and neighborhood groups—including an energetic and creative band of high school students—has succeeded in holding off the construction of an enormous trash incinerator project.

The students wowed members of the Baltimore Board of Education this May with a presentation that mixed carefully researched environmental and public health analysis with a hip-hop routine that had board members up on their feet. Greg Sawtell, an organizer with Baltimore-based United Workers (one of several organizations allied against the incinerator), says conversations with school board members since then have left him optimistic that they will oppose the project.

Even though preparation work on the incinerator began last year, full-scale construction is stalled, and the projected completion date has been pushed to 2016 from an initial estimate of 2013. Opponents are reluctant to claim sole credit for the delays, as there have also been financing and regulatory issues, but believe their efforts are sharpening scrutiny and slowing progress.

Talk of the so-called trash-to-energy incinerator plant began some five years ago, after chemical manufacturer FMC Corp closed a pesticide plant, eliminating 130 jobs (including 71 union jobs with the United Steelworkers) and leaving vacant a large parcel of land zoned for heavy industry. The site straddles the Curtis Bay and Fairfield neighborhoods of the city, parts of which have large African-American populations. To many political and community leaders in this deindustrialized and job-starved section of the city—which lies far from the famed Inner Harbor or Fells Point entertainment districts—it seemed like a boon when Energy Answers Inc., an Albany, New York-based power development company, appeared on the scene to propose a plant that would burn commercial and construction waste to produce electricity. Energy Answers billed the plant as a way to restore up to 200 jobs and provide clean, low-cost energy. The proposal came with enthusiastic endorsements from local political leaders, especially Maryland Gov. Martin O’Malley and city Mayor Stephanie Rawlings-Blake.

Initially, Energy Answers struggled to find loans and missed a deadline to secure federal stimulus money. But in May 2011, the project got a big boost when O’Malley signed legislation to help make the plant profitable through a complicated pollution credits scheme that would funnel cash to Energy Answers for generating so-called clean power. (A few days later, Energy Answers gave $100,000 in campaign contributions to the Democratic Governors Association, chaired by O’Malley.)

But for locals, the bloom was already coming off the rose. It had emerged that an estimated 400 to 600 exhaust-spewing trucks carrying waste tires, metals, plastics and construction materials would travel through the streets of Curtis Bay every day to feed the plant. The incinerator itself would burn up to 4,000 tons of waste a day for decades— raising even more alarming public health concerns. In a recent Baltimore Sun op-ed urging cancellation of the project, Gwen DuBois, of Chesapeake Physicians for Social Responsibility, said the plant could emit dioxin, mercury and other heavy metals, which can cause cancer and other diseases.

“What a lot of people don’t realize is just how dirty these plants really are,” says Mike Ewall, founder and co-director of Energy Justice Network, a national organization devoted to helping communities fight dirty energy development. “They are much worse than coal or anything else. And this would be the biggest such plant in the country.” Curtis Bay is already the most polluted zip code in Maryland, Ewall notes, adding that low-income neighborhoods of color are often used as dumping grounds precisely because they lack the political power to fight back.

It’s the threat of dangerous air pollution that has students at Curtis Bay’s Benjamin Franklin High School leaving the classroom and demonstrating in the streets of Baltimore. In their largest action, in late 2013, more than 100 protesters marched from the school to the site of the proposed incinerator—just a mile away. A related petition has garnered more than 2,000 signatures.

Recent Benjamin Franklin graduate Audrey Rozier is a leader of Free Your Voice, the student group agitating to stop the incinerator, as well as the co-author of a rap song devoted to the campaign. “We have our rights according to the amendments / But why do we feel like we’ve been so resented / Ignored, shoved to the side where opinions don’t matter,” goes one verse.

Rozier says the song, which she has performed all over the city, has helped educate the local community and a broader Baltimore audience. “What was amazing to me in the beginning was that people outside the community were going to [build the incinerator], but the people who live here didn’t know anything about it,” she says. “I think that’s changed.”

That disconnect between the political elite and the communities most affected by its decisions is at the heart of the fight over the Curtis Bay incinerator, says Sawtell. In Baltimore and elsewhere, decisions on economic development policies are made by a political and economic elite with little or no input from the working-class residents who must live day-to-day with the consequences. “Community members we’ve talked to say no one asked their opinion before the project was announced,” says Sawtell. “Somehow I think if it was the children of Gov. O’Malley, or the children of Mayor Rawlings-Blake, who were going to be poisoned, the decision would be different.”

The campaign is drawing increasing support, most recently from the nearby Anne Arundel County chapter of the NAACP. Meanwhile, enthusiasm for the plant among politicians seems to have cooled in the face of the protests, Sawtell says, with near-silence on the issue from Mayor Rawlings-Blake in the past few years. The Democratic candidate for governor in this year’s election, Anthony Brown, declined to take a position.

If the construction delays are any indication, even Energy Answers may be losing interest, although the company tells In These Times it’s in “confidential discussions for waste and energy sales” and plans to proceed with the project. Sawtell, however, believes that a major push from opponents now could kill the plan once and for all.

 

by: http://www.radiofree.org/us/baltimore-teens-take-out-the-trash/

Incinerator USA Pharmaceutical

Basic Info.

Model NO.:incinerator supplier in saudi arabia
Export Markets:Global

Product Description

Key Features:  * All versions with Dual combustion chamber.  * Stainless Steel chimney/stack, long life. *according to sequence * High fever, long life of incinerator.  * Free or minimal installation on site.  * High speed, from 10kgs to 500kgs per hour, cremation equipment for sale in china, cremation equipment factory china, cremation furnace,  * PLC Control Plane. *according to order  * New Design for pet animal cremation company.  * One year warranty on incinerator and parts in stock.  Application Scope:  1. Hospital& practice: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine.  2. 3. Community & Sea Port & Station: Cremation in china, cremation incinerator, cremation incinerator design, up to 6ton per day. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation

Items/Model YD-30 YD-50 YD-100 YD-150
Burning Rate (kgs/Hour) 30 kgs/Hr. 50 kgs/Hr. 100 kgs/Hr. 150 kgs/Hr.
Feed Capacity (kgs) 60 kgs 150 kgs 200 kgs 300 kgs
Equipment Weight 2300 kgs 4000 kgs 4300 kgs 7000 kgs
Primary Chamber (Liters) 360 900 1200 1500
Secondary Chamber (Liters) 200 200 500 500
External Dimensions (cm) 145x90x175 200x160x230 220x180x360 240x170x380
Internal Dimensions (cm) 100x60x60 120x90x85 130x100x90 150x100x96
Oil Tank(Liters) 200 300 300 500
Door Opening (cm) 48 x 60 62 x 80 55 x 80 59 x 81
Chimney (M) 5 5 10 10
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES