Archive: October 4, 2019

Google快讯 – incinerator

Google
incinerator

实时更新 2019年10月4日
新闻

There is a striking similarity between Gloucester and Copenhagen – In both cities you are unable to see the waste incinerator from their dry ski slopes.

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

SUPPLY, INSTALLATION AND COMMISSIONING OF WASTE INCINERATOR – TECHNICAL SPECIFICATIONS

SUPPLY, INSTALLATION AND COMMISSIONING OF WASTE INCINERATOR – TECHNICAL SPECIFICATIONS
The Waste Incinerator is designed to burn Type IV of pathological waste and infectious, contaminated “red bag,” surgical dressings, plastic test devices and other wastes. 
General Specifications
Burner:  2 burners (primary burner and second burner)

Fuel: Oil 
Capacity (Cubic Mtr): 0.65 
Ave Capacity: 60 kg per hour 
Fuel Consumption (ltrs / hr):13 
External Dimensions
Length (mm): 2300 
Width (mm): 1220 
Height Incl. Flue (mm) 7000 
Door Opening (mm) 610 x 710 610 x 710
Operation
Min. Operating Temperature: 950 
Max. Operating Temperature: 1320 
Residency Time in Second Chamber: 5 sec 
Temperature Monitoring: YES 
Other clarification
Easy and safe operation
Large counter-balanced fill door with electrical    lockout.
Automatic control system provides preset burn times and shut off. 
Reload light indicates to operator when it is time to recharge. 
Be required for burnout of final charge.  
Low energy consumption levels 
Programmable digital temperature controls maintain temperature, assuring complete combustion while conserving fuel. 
 Pressure blower with modulating air control creates turbulence and distributes combustion air to secondary chamber. 
 Secondary burner with temperature activated modulating control provides fast preheat and   sustains high temperature performance at low energy consumption levels.  
Charging rate 

Up to 600kgs per ten-hour day of Type IV pathological waste or red bag waste rated at 2200 BTU’s per kg, based on batch loading twice daily.
Thermocouples (2 pcs/ each thermocouple assembled on the unit )
Thermocouples with pocket (1 pcs/each burner )
Nozzles (2 pcs/burner)
Nozzle line (1 pc/burner)
Glass fibre (2 roll/size)
Ignition electrode ( 2 pcs/burner)
High tension cable ( 2 pcs/burner)
Flame photometer (1 pcs/burner)
Burner primary chamber (1 set)
Burner secondary chamber (1set)
Control panel parts (1 set)
Fuse (1 pk from each rating )
Solenoid valve (1 pcs/assembled on the unit)
Burner oil filter  (10 pcs/burner)
Fuel pump (1 pcs/burner)
Shaft seal kit (1 set /shaft)
Seal plate gasket ( 1 set / plate )
Mechanical seal (1 set)
Flue gas restricting  ring bricks (1set)
Refractory cement (1 pk ) 
Shaft bearing (1 set)
V belts (1 set)

Google快讯 – waste incinerator

Google
waste incinerator

每天更新 2019年10月4日
新闻

His firm is behind the design of a new artificial ski slope in Denmark's capital Copenhagen, built on the roof of a huge incinerator that burns waste to …

Facebook Twitter 标记为不相关

The government should be “explicit” about the need for more waste incineration plants and to commit to keeping landfill tax at levels which make …

Facebook Twitter 标记为不相关

ACTION groups have issued a series of scathing objections to plans for a $500 million waste to energy facility in Sydney's West — promised as the …

Facebook Twitter 标记为不相关

In recent days, smoke has increased as a result of waste incineration as dozens of inquiries and complaints were received from communities in …

Facebook Twitter 标记为不相关

Since then, incineration plants quickly became an established means of waste management. China is the country with the largest installed WtE …

Facebook Twitter 标记为不相关

A High Court ruling that a senior official did not have legal power to approve a new £240 million waste incinerator following the collapse of devolution …

Facebook Twitter 标记为不相关

Incineration is the most common and highly preferred method used for the medical waste disposing, although it is unsafe for the environment as it …

Facebook Twitter 标记为不相关

Recycling or incinerating the 10,000 tons of waste produced per day in Ho Chi Minh City is no easy task. The outdated and mostly unregulated waste …

Facebook Twitter 标记为不相关

Rather than have the boards go to landfill or an incinerator, Quince Honey Farm in South Molton and SWM Recycling will be recycling them.

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Google快讯 – medical waste

Google
medical waste

实时更新 2019年10月4日
新闻

There are different types of nuclear waste with very different levels of radiation; the precautions for medical nuclear waste are less stringent than those …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Google快讯 – incinerator

Google
incinerator

实时更新 2019年10月4日
新闻

The Market Insights Reports has published the obtainability of a new statistical data to its repository titled as Thermal Incinerator Market. The report …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

secondary combustion chamber

A mechanical particulate collector must be incorporated after secondary combustion chamber for removal of particulate pollutants entrained in the flue gas stream. The particulate collectors may include any of the following or a combination thereof: 
a) Cyclone separator 
b) Electrostatic precipitators 
c) Fabric filters 
2.6 Chimney/Stack 

l) The chimney should have a minimum height of 10 metres above ground level and clear the highest point of the building by not less than 3 metres for all roofs. The topography and height of adjacent buildings within 50 metres radius should be taken into account. 
m) The chimney should be visible to the operator from the feeding area. 
n) The minimum exit velocity should be 10 metres per second and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting gases. 
o) The point for measurement of emissions shall be provided. 

2.7 Instrumentation 

a) Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary chambers. 
b) An audible and visible alarm must be installed to warn the operator when the secondary chamber temperature drops to below the required temperature. 
c) A carbon monoxide and oxygen meter/recorder should be provided 

d) A smoke density meter/recorder should be provided. 
e) A solid particulate meter/recorder should be provided. 
f) Any other instrument that may be considered necessary. 

2.9 Emission Limits 

a) Combustion efficiency (C.E) shall be at least 99.00% where C.E = %Carbon dioxide x 100 / [% Carbon dioxide + carbon monoxide] 
b) The temperature of the primary chamber shall be 800 +/- 50 degrees centigrade 
c) The secondary chamber gas residence time shall be at least 1 second at 1050 +/- 50 degrees centigrade with 3% oxygen in the stack gas. 
d) Opacity of the smoke must not exceed 20% viewed from 50 metres with naked eyes. 
e) All the emission to the air other than steam or water vapour must be odourless and free of mist, fume and droplets. 
f) A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where DRE [ ( Win – Wout) /Win ] x 100 where Win = mass feed rate of the POHC in the waste stream fed to incinerator and Wout = mass emission rate of POHC in the stack prior to the release to the atmosphere. 
g) The average dioxin and furan concentration in the emission should not exceed 80mg/m3 total dioxins and furans if measured for a period of 6 to 16 hours. 

Google快讯 – medical waste

Google
medical waste

实时更新 2019年10月4日
新闻

Medical Waste Container Market research now available at Brand Essence Research encompasses an exhaustive Study of this business space with …

Facebook Twitter 标记为不相关

Sources said the committee members were told by Jyapee plant officials that they were not getting segregated waste from the MC. Medical and …

Facebook Twitter 标记为不相关

New statistical data titled Global Recreation Market was published by Market Research Inc. Various features of recent trends, such as the Global …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Google快讯 – medical waste

Google
medical waste

实时更新 2019年10月4日
新闻

This facility DOES NOT ACCEPT Ammunition, Explosives of any kind, Medical Waste, including Sharps/Medical Syringes, Prescription Medications.

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Google快讯 – incinerator

Google
incinerator

实时更新 2019年10月4日
新闻

Lanjutnya, mesin incinerator merupakan alat pemusnah barang yang dioperasikan dengan menggunakan teknologi pembakaran pada suhu lebih …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Google快讯 – medical waste

Google
medical waste

实时更新 2019年10月4日
新闻

Garbage, including medical and butchery waste, gets piled up along coasts; corporation cleaning staff, inadequate in number, focus only on roads and …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈