Archive: August 7, 2019

Google快讯 – waste incinerator

Google
waste incinerator

每天更新 2019年8月7日
新闻

One of the few moments of hope is offered by oil painter Madeline Lee, who chose to depict the Somerville Art Farm, a former waste incinerator site …

Facebook Twitter 标记为不相关

The accompanying report contains an elucidation of the promoting plan for “Incinerator Market”. This Incinerator market report offers the customers …

Facebook Twitter 标记为不相关

MOSCOW, August 6. /TASS/. Moscow authorities do not plan to accommodate new refuse incinerators in the city but new enterprises processing …

Facebook Twitter 标记为不相关

Residents rally against Wheelabrator Saugus trash facility …. The crowd broke into chants of “shut it down” and “close the incinerator” while passing …

Facebook Twitter 标记为不相关

A CAMPAIGN group protesting against plans to build an incinerator near Longparish have called the borough council “heavy handed” after it was …

Facebook Twitter 标记为不相关

Tradebe Healthcare also operates a number of other clinical waste treatment facilities across the country, including healthcare waste incinerators in …

Facebook Twitter 标记为不相关

Global Incinerator Market – By Type(Mechanical Grate, Pyrolysis Type, Rotary Kiln Type, Fluidized Bed Type, Others), By Application(Industrial waste, …

Facebook Twitter 标记为不相关

In-depth analysis of Medical Waste Incinerators market research report offers an forecast period 2019–2025, detail study on market trends and the …

Facebook Twitter 标记为不相关

The “Medical Waste Management Market” report delivers data about the … Incineration segment is estimated to rule the medical waste management …

Facebook Twitter 标记为不相关

Most of Singapore's non-recyclable is incinerated, where the ash and some solid waste are transported to a man-made island called Semakau island, …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Incinerator smokeless and odourless combustion-hot medical waste disposing machine

Incinerator should be smokeless, odourless combustion and it should be made by high-quality cast, insulation, and steel plate as well as minimum generation of dust. Moreover the incinerator should be corrosion resistant. 
Type of incinerator : Pyrolitic – hot medical waste disposing machine
Operation Condition: 8-16 hr/ day 
Control: Built-in data recording
Operating temperature: Incinerator 
/Primary Combustion Chamber
Primary Chamber: 900 – 1200 0C
Type: continuous loading, Top Loading
Capacity/Burn rate per hour: 250 -300 kg/hr 
Material:
External- 3 layers 
Internal lining:  a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shock
Secondary 
Combustion 
Chamber:
Type: horizontal/vertical
Temperature:  1200- 1300 oC
Residence time of gases : >2 seconds
Ash Residue: <5% of original waste size
Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash
Flue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacity
Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc 
Auxiliary device: Fuel cut-off device
Waste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                      
Chimney (Stack):
Type: Vertical type
height:>7 meter’
Material: Fireproof cast, stainless steel
OUTPUT: 
GAS- SMOKELESS,ODORLESS 
ASH -Max <5% of original waste size
Reduction of Pollutant gas SO2, HCL, HF and line particulate
Emission standard:
WHO/ European
Test report for emission testing provided?
Heat exchange mode: Automatic
Accessories:  
All standard accessories for incinerator, including but not limited to loading system, heat exchangers, pollution control system, ash removal system, including ladder and oil tanker (2500litre capacity).
Operating Environment: 
The incinerator is capable to operate at the altitude of 2400mt above sea level. (according to the site conditions)
Power Requirement:
220 Vac single phase or 380 Vac three phase 4 wire system  50HZ   
Installation Testing and Commissioning :   to be conducted by certified or qualified personnel.  
Supplier shall provide the following documentation    
User (Operating) manual in English. 
Service (Technical / Maintenance) manual in English. 
Certificate of calibration and inspection from factory. 
Fast moving spare parts: Supplier is able to provide fast moving spare parts with quantities as described in the price schedule or their equivalent. 
Training: Supplier is able to provide training on operation, management and maintenance of incinerators.   
Warranty 
Comprehensive warranty for minimum 2 year. 
Maintenance Service during Warranty Period 
During warranty period supplier must ensure, corrective/breakdown maintenance whenever required. 
Supplier has a local agent or branch office in Ethiopia (please indicate the name and contact details of the agent) 
Supplier provides labor, lifting equipment and tools needed for the installation, testing and commissioning of the incinerator. The supplier will be responsible for the safety of its staff, workers and laborers during the installation, testing & commisssioning 
Able to provides all necessary information that would be used as an input for preparation of floor (platform) and room for the incinerator to be supplied such as the following; 
Lay outs (drawings) and  pictures of the incinerators to be installed 
 Length, width and height of incinerator,
 Area (length x width) for the floor (platform) and Length, width and height for roofing, for each 
type of incinerators to be installed 
Needs during the transport, installation, assembly, commissioning and operation of the equipment in terms of access points, available space to operate (inside and outside of the room), ways to get to the site where the equipment will be placed or any others. ; 
Technical Specifications (fuel consumption rate, weight, anchoring system, support points, etc.);
 Chimney specifications to be used for the roof design ( size, support needs, insulation); 
Considerations related to operation and Maintenance, for e.g., minimum available area to perform routine maintenance tasks and replacement of key parts that need to be changed more frequently; 
Any consideration/need of the incinerator while being operated that might impact the design of the room/shelter where it will be placed.
Other important information to be considered that can influence or impact the designing and building processes of the infrastructure for the incinerators, for example area dimension for other accessary parts like fuel tanker storage, if applicable, etc…. 
Delivery time (DAP, Addis Ababa) in weeks
Name of manufacturer including website of the manufacturer &/ supplier & country of origin
Thermocouples (2 pcs /each thermocouple assembled on the unit )
Thermocouples with pocket (1 pcs/each burner )
Nozzles (2 pcs/burner)
Nozzle line (1 pc/burner)
Glass fibre (2 roll/size)
Ignition electrode ( 2 pcs/burner)
High tension cable ( 2 pcs/burner)
Flame photometer (1 pcs/burner)
Burner primary chamber (1 set)
Burner secondary chamber (1set)
Control panel parts (1 set)
Fuse (1 pk from each rating )
Solenoid valve (1 pcs/assembled on the unit)
Burner oil filter  (10 pcs/burner)
Fuel pump (1 pcs/burner)
Shaft seal kit (1 set /shaft)
Seal plate gasket ( 1 set / plate )
Mechanical seal (1 set)
Flue gas restricting  ring bricks (1 set)
Refractory cement (1 pk ) 
Shaft bearing (1 set)
V belts (1 set)

Google快讯 – waste incinerator

Google
waste incinerator

每天更新 2019年8月6日
新闻

Contaminated trash is sent to incinerators and landfills for a fee, but some recyclers “just find a corner and burn it,” Wong said. “The smoke smells just …

Facebook Twitter 标记为不相关

A controversial plant that can turn waste into energy may still be built after developers lodged an appeal to an independent planning inspector.

Facebook Twitter 标记为不相关

Used cotton wool and syringes with traces of blood are not an unusual sight on the … It does not have the much-needed incinerator to burn its waste.

Facebook Twitter 标记为不相关

A global Waste Incinerators market report has come to the stands. The report, which is released by Industry Research, offers a lot of details that allow …

Facebook Twitter 标记为不相关

Land Incinerators Market will witness growth owing to rising government measure to reduce the dumping of solid waste. Respective governments …

Facebook Twitter 标记为不相关

So what if we told you about a waste-to-energy (WTE) company that is … At its most basic, waste-to-energy in the MSW industry refers to incinerating …

Facebook Twitter 标记为不相关

Britaniacrest Recycling said a planned energy-from-waste (EfW) facility in … the No Incinerator 4 Horsham (Ni4H) group said Irons had made a donation and … The inquiry follows an appeal lodged by Britaniacrest after West Sussex …

Facebook Twitter 标记为不相关

Innovate Insights added Most up-to-date research on Surgical Waste Management Market Forecast to 2026 to its huge collection of research reports …

Facebook Twitter 标记为不相关

HTF MI released a new market study on Waste Treatment And Disposal … The research study provides estimates for Waste Treatment And Disposal … Incineration, Recycling, Other, Company Profile, Main Business Information, …

Facebook Twitter 标记为不相关

Segmentation by Technology: Rotary kiln, Liquid injection, Static fluidised bed, Direct flame, Multiple hearth incinerator, Others (Furnace, Waste gas …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Google快讯 – waste incinerator

Google
waste incinerator

每天更新 2019年8月5日
新闻

July is Penghu County's peak tourist month, which means it is also the peak time for garbage. Penghu County Commissioner Lai Feng-wei (賴峰偉), …

Facebook Twitter 标记为不相关

Liew said that Sandakan does not have its own landfill or incinerator to treat waste, such as plastic, therefore all the waste produced and accumulated …

Facebook Twitter 标记为不相关

The Waste Incinerators Market report is a brilliant presentation of critical dynamics, regional growth, competition, and other important aspects of the …

Facebook Twitter 标记为不相关

It will be set up near the Dadu Majra-based garbage processing plant in 1 acre land. The budget for the advanced incinerator has been pegged at …

Facebook Twitter 标记为不相关

The “Global Fluidized Bed Incinerator Market 2018 Research Report” is an extensive Fluidized Bed Incinerator Market research report contains an …

Facebook Twitter 标记为不相关

Even more startling, 30 years ago waste incineration was the largest source of pollution in the UK, but the sector has managed to reduce its emissions …

Facebook Twitter 标记为不相关

Waste to Energy (WtE) is the process of energy generation from the … For instance, Sweden incinerated 49.5% of its total municipal waste in 2015 for …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Destroy the wasted materials or chemical uses in pharmaceuticals

Destroy the wasted materials or chemical uses in pharmaceuticals through Primary & Secondary combustion Chamber’s with working 
temperatures are 850° C & 1100° C or 1200° C & 1400° C. The incinerator design must meet with ISO, OSHAS, Emission 
Standards, Norms and Guidelines. The incinerator design must have heat recovery system and low fuel consumption system while 
incineration. 
The machine should have following features in its respective parts – 
Feeding system
Automatic/ and manual control system
Automatic heating control system
Easy maintenance 
Outdoor type IP grade material
Heat recovery system
Low fuel consumption system 
Combustion chamber dual type with heat recovery system
Burner system with economizer / low fuel method
Scrubbing system as per regulation
Easy dust collecting system
Chimney (height 50 meter)
Record printing system
Incinerators to be suitable for the professional disposal of clinical & medical waste / garbage with a higher load capacity in the range of approximately
1000-1500 Kg.  The durable, self-contained incinerators shall offer an effective and highly efficient, safe disposal and to be manufactured according to applicable international directives, e.g. CE, EU, etc.
Type of Fuel: Diesel or Petrol or Natural Gas. Temperature controlled,
efficient burner for optimum fuel economy. Units to be pre-assembled,
pre-piped, pre-wired and tested before transport / export.
Within the framework of an environmental and medical equipment & technology consultation and joint purchasing, this Procurement Bureau invites applicants for pre-qualification in the aim of primarily selecting capable companies to bid for the above tender.

Google快讯 – waste incinerator

Google
waste incinerator

每天更新 2019年8月4日
新闻

Marketresearchnest.Com has recently broadcasted a new study to its broad research portfolio, which is titled as “Global Waste Incinerators Market” …

Facebook Twitter 标记为不相关

CAP strongly urges the Penang government to move towards zero waste and not take the incinerator path. Local Government Committee chairman …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Mobile Diesel Fired Incinerator in container

Mobile Diesel Fired  Incinerator in container, 
supplied with the following specifications:
complete with constant ventilation fans for extraction, 
factory installed inside one 20ft ISO container complete with lighting, ventilation fan, fire security, 3 access doors, and a 1200 litre fuel tank complete with a piping. 
Fully containerised mobile  waste management solution for medical, animal, and industrial waste applications.
Installed in Container (ISO) : 20”
or its nearest equivalent model “
Tender Technical Specification
Destruction rate of 50kg/hr
Hot Hearth Principle
Refractory insulation:
a. Silicon carbide floor
b. Minimum 22mm insulation thickness
c. Brick lined Refractory insulation
d. Three layers of refractory insulation
e. Temperature Rating 1650 deg.C
f. 42% alumina fire bricks
Primary Chamber:
a. 120Kw Burner 
b. Dedicated independent fan system, damper controlled. 
c. Thermostatic Sensor 
d. Dimensions – 700mm x 700mm x g00mm
e. Square Chamber with curved floor for liquid centralization
Hot Hearth Chamber:
a. 120Kw Burner
b. Thermostatic Sensor 
c. Minimum Temperature of 1100 deg.C as per WHO guidelines. 
d. Two second retention time – Proven with CFD modeling.
Steel Construction:
a. constructed from 8mm & 1Omm steer plate 
b. Painted two pack paint system, red with black flashing
Control Panels:
a. Door dimensions 700mm x 700mm
b. Front mounted ash collection box.
Control Panels:
a. AiController
b. Plug and play 
c. Threezone monitoring of:
i)Primary chamber
              ii) Secondary chamber
              iii) Hot hearth
d. Digital display
e. Burner on-off indication lights 
f. Timer
Chimney:
a. Mild steel painted red
b. Refractory insulated with 50mm of insulation.
Unit Dimensions:
1840mm x 1 ‘1 50mm x 1950mm high.
Safety:
a. Burner door cut-off switches
b. Fire valve fitted to fuel system 
c. Maximum noise at 1m x g0 decibels 
d. Exterior temperature 70 deg.C Max

200 BEDS HOSPITAL INCENERATOR TECHNICAL INFORMATIONS

1) Policy

– Waste disposal management shall be taken special note to prevent hospital infection.

– Infections wastes shall be managed, stored strictly and burned by a incinerator located at hospital site.

 

2) Waste Disposal Plan

a) Classification

– Medical wastes in hospital are classified as follows;

 

Infections Waste

Specially-controlled waste

Organ, needle, etc.

Industrial waste

Rubber gloves, etc.

General waste

Gauze, etc.

General Waste

Plastic, Rubber

Infusion bottle, etc.

Paper, wood, Vinyl

Voucher, etc.

Metal, Glass

Can, Glass bottle

 

b) Infections Waste Disposal

– Segregation: Infections waste disposal shall be segregated appropriately and packed in particular containers and delivered to particular storage. The segregation, packing and delivery shall be operated appropriately at each room such as outpatient, operation theater, blood collection room and dialysis room.

– Precaution: Infections waste shall not be place in other containers on the way of segregation, packing and delivery.

– Storage: Infections waste shall be stored at the storage in hospital site temporarily until infections waste is incinerated.

– Incinerator:

 

It is designed to sterilize medica
l waste , reduce its volume , and render its components unrecognizable all in one fully enclosed and automated system.

It combines direct heated steam , high pressure and shredding to treat infectious materials.

The contaminated waste is loaded into the upper stainless steel chamber where a heavy-duty shredder reduces the waste into small pieces. Using gravity, the processed material falls into the treatment chamber where every piece is steam heated to 134 and pressurized to 3 to bar for 20 minutes. The operating conditions are continuously monitored and validated to achieve complete sterilization.

The 60 minutes average duration process cycle is totally automated. A computerized system monitors the process and automatically prints a report with the essential sterilizing parameters at the end of the cycle for accurate record keeping.

The capacity is between 500 to 600 kg/cy.h or more.

Treatment cycle:

1- Loading ; the contaminated waste is automatically -loaded into the chamber of the unit

2-Shredding; the heavy-duty shredder cut the material into small pieces and features a unique reversing system to avoid jamming

3-Heat; saturated pressurized steam raises the temperature to 134 C and the pressure to 3 bar

4-Sterilization; the sterilization comes into direct contact with the shredding material (134 c , 3 bar) for 20 minutes

5-Cooling; temperature is lowered to 80 C by spraying cool water onto Double jacket of the treatment vessel, simultaneously, the unit returns to ambient pressure

6-Draining; the steam is condensed to water and discharged with the cooling water to the sanitary sewer system

7-vacuum; the remaining residual steam is vented out through a vacuum pump

8-Unloading; a digital signal informs the operator that all safe operating conditions have been met

The condition unlocks the unit and allows gravity unloading of the treated waste into a container

Teaching Specification

General Characteristics

Operational temp. max

160 C

Max Weight when filld with waste For a special hydraulic test. Kg

10500

Stress. Kg/ cm3

3.5

Steam Pressure. Bar

8

Max Steam Flow Kg/h

500

Compressed Air Bar

6

Electricity 380 V/3 – phase Surge Protection system

35KW

Operating Characteristics

Average Cycle Time. minutes

60

Process Wight Capacity . Kg

500 – 600

Density. Kg/m3

100

Average process wight capacity Kg./cycle microbial inactivation

200-300

8log 10

Waste volume reductin

80%

Consumption / Cycle

Steam. Kg

40

Electricity . KW/h

9

Water Liters

500

 

Google快讯 – waste incinerator

Google
waste incinerator

每天更新 2019年8月3日
新闻

When carbon filters filled with firefighting foam chemicals from Bucks and Montgomery counties are burned at an incinerator in Delaware County, the …

Facebook Twitter 标记为不相关

Right now, most of that trash does not get recycled or composted or reused. Instead, it ends up in landfills and incinerators, fueling our climate crisis …

Facebook Twitter 标记为不相关

“This is based on an incredibly low ambition for waste prevention and recycling. “Over the lifespan of the incinerator, hopefully plastics will be banned …

Facebook Twitter 标记为不相关

A 1963 Department of Public Health modification of the landfill's site assignment did not prohibit the disposal of ash generated by incinerating waste at …

Facebook Twitter 标记为不相关

Global Incinerator Market Forecast 2024 provides key strategies followed by … The incinerators are equipment used for treatment of waste through the …

Facebook Twitter 标记为不相关

This principal data provides major players and executives an exact picture of general Fluidized Bed Incinerator market. Apart from this, it also provides …

Facebook Twitter 标记为不相关

Biomedical waste is often incinerated. An efficient incinerator will destroy pathogens and sharps. Source materials are not recognizable in the …

Facebook Twitter 标记为不相关

Over 90% of potentially infectious medical waste was incinerated before 1997. In August 1997, the U.S. Environmental Protection Agency (EPA) …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Google快讯 – waste incinerator

Google
waste incinerator

每天更新 2019年8月2日
新闻

They allege that chemical contamination from the city's nearby waste incinerator poisoned the ground, made them sick and lowered property values.

Facebook Twitter 标记为不相关

The new facility shredded objects in the waste stream before feeding them to the incinerators to improve combustion efficiency. Four 30-ton per hour …

Facebook Twitter 标记为不相关

The waste that cannot be recycled is taken to the energy recycling plant at La Collette where the majority of it is burnt, generating enough electricity for …

Facebook Twitter 标记为不相关

More thought needs to be put into where waste is managed, Perpall said, mentioning that air pollution from trash incinerators can contribute to high …

Facebook Twitter 标记为不相关

Amsterdam council is supporting a call by the Dutch Waste Management Association for the Netherlands to import less waste for incineration because …

Facebook Twitter 标记为不相关

The company also reported an “excellent incinerator utilization rate (93%)” and higher electricity selling prices. Recyclate prices had only a “limited …

Facebook Twitter 标记为不相关

A research report on ' Waste Incinerators Market' Added by Market Study Report, LLC, features a succinct analysis on the latest market trends.

Facebook Twitter 标记为不相关

Ilhan Omar, D-Minn., on July 25 introduced the Zero Waste Act, which … the Global Alliance for Incinerator Alternatives (GAIA), which supports the bill.

Facebook Twitter 标记为不相关

Jeremy said: “I would like them to research whether there is a waste-to-energy plant (incinerator) planned for their area, and, if there is, to oppose it…

Facebook Twitter 标记为不相关

Global Incinerators Industry study deals with a complete overview of the Report, which consists of definitions, a wide range of statements and an entire …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈